Active SLED Opportunity · CALIFORNIA · KERN COUNTY
AI Summary
Kern County seeks bids for road rehabilitation on South Dr. Martin Luther King Jr. Boulevard including asphalt paving, bus pad construction, and traffic striping. Bids due August 12, 2026.
The work to be performed consists, of the construction of paving hotmix asphalt, cold planning asphalt concrete, constructing survey monument encasements, constructing a bus pad, installing inductive loop detectors, and painting thermoplastic traffic stripes and pavement markings. Estimated Bid Value: 1,347,189 Pre-Bid Meeting Information: No Online Q&A: Yes Location Information: Department: Kern County Public Works Address: 2700 "M" Street, Suite 400Bakersfield, California93301 County: Kern License Requirements: A or C-12 Other Details: The County of Kern (County) will receive sealed Bids for construction on a highway in accordance with the plans and special provisions therefor to which special reference is made as follows: FOR CONSTRUCTION OF ROAD REHABILITATION ON SOUTH DR. MARTIN LUTHER KING JR. BOULEVARD FROM CASA LOMA TO STATE ROUTE 58, until 11:00 a.m. on August 12, 2026, at the following locations:(a) Mailed via United States Postal Service to Kern County Public Works Department, 2700 "M" Street, Suite 400, Bakersfield, California, 93301;(b) Delivered in person or by courier service to the Kern County Public Works Department, Suite 400, 4th Floor, Public Services Building, 2700 "M" Street, Bakersfield, California; or(c) From 10:45 a.m. until 11 :00 a.m. delivered in person to the first floor meeting room of said Public Services Building.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.