SLED Opportunity · COLORADO · COLORADO

    Rockridge Pump Station Replacement Re-Bid

    Issued by City of Durango
    localRFQColoradoSol. 7762468302
    Closed
    STATUS
    Closed
    due Dec 9, 2025
    PUBLISHED
    Oct 22, 2025
    Posting date
    JURISDICTION
    Colorado
    local
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    The City of Durango seeks bids for the Rockridge Pump Station Replacement, including installation of a booster pump station, backup generator, pipelines, gate valves, security fencing, and electrical conduits. Shutdown limited to 5 hours during switch.

    Opportunity details

    Solicitation No.
    7762468302
    Type / RFx
    RFQ
    Status
    Active
    Level
    local
    Published Date
    October 22, 2025
    Due Date
    December 9, 2025
    NAICS Code
    237110AI guide
    Jurisdiction
    Colorado
    Agency
    City of Durango

    Description

    The City of Durango invites interested, qualified persons or firms, capable of providing the required service to submit bids for improvements that generally consist of furnishing and installing a factory-built booster pump station, salvage of the existing factory pump station for future City use, furnishing and installing a backup generator, installing new pipelines with connections to the pump station and the existing waterlines, installation of two (2) gate valves, abandonment of the existing pipelines, installation of security fencing, extending and installing communication and electrical conduits, installing an electrical panel array, and restoring existing surface conditions. The pump station can only be shut down for a maximum of 5 hours during the switch from the existing pump station to the new pump station. The City of Durango invites interested, qualified persons or firms, capable of providing the required service to submit bids for improvements that generally consist of furnishing and installing a factory-built booster pump station, salvage of the existing factory pump station for future City use, furnishing and installing a backup generator, installing new pipelines with connections to the pump station and the existing waterlines, installation of two (2) gate valves, abandonment of the existing pipelines, installation of security fencing, extending and installing communication and electrical conduits, installing an electrical panel array, and restoring existing surface conditions. The pump station can only be shut down for a maximum of 5 hours during the switch from the existing pump station to the new pump station.

    Key dates

    1. October 22, 2025Published
    2. December 9, 2025Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.