Active SLED Opportunity · MASSACHUSETTS · MASSACHUSETTS
AI Summary
Roof replacement project for two Brookline schools: Lawrence School (PVC roof) and Baldwin Elementary (slate & EPDM roof). Electronic bids only via www.biddocsonline.com. Non-mandatory pre-bid conference on April 22, 2026.
Roof replacement project of two Brookline buildings including the Lawrence School & the Baldwin Elementary. New Roof system at Lawrence shall be PVC & new roof system at Baldwin shall be slate &EPDM. This project is being electronically bid hard copy bids will not be accepted. The bids are to be prepared and submitted at www.biddocsonline.com Pre Bid Conference: A non-mandatory Pre-Bid Conference i April 22, 2026 at 10:00 AM starting at the Baldwin Elementary, 490 Heath St,Chestnut Hill, MA 024675. Then Lawrence School, 27Francis St, Brookline, MA 02446.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.