SLED Opportunity · NEW YORK · NEW YORK
AI Summary
Construction project for a Comprehensive Integrated Biobanking System at Roswell Park, including renovations for liquid nitrogen storage, labs, and offices with MWBE and SDVOB participation goals.
Project Description: The construction build out of a Comprehensive Integrated Biobanking System within the existing building at 99 High Street on the 1st and 7th floors. The project will consist of the renovations to existing spaces to include centralized liquid nitrogen storage facilities, laboratory spaces, and office and support spaces. This project requires prevailing wage labor rates. This project has an overall MWBE participation goal of 30%, 15% MBE & 15% WBE, and a SDVOB Goal of 6% This project is tax exempt. Plans and specifications are available through BuildingConnected, Avalon Planroom and Construction Exchange upon request OR Please contact Sal Casuccio to place a request, (716) 449-4381, salvatore.casuccio@lechase.com Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 15.00% WBE Goal: 15.00%
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.