SLED Opportunity · GEORGIA · SAVANNAH AIRPORT COMMISSION
AI Summary
Restoration project for North Economy and Long Term Hourly Parking Garages at Savannah Airport including concrete and joint repairs, membrane recoating, and other maintenance.
Construction plans, specifications and contract documents are available for examination and may be obtained from the offices of the Savannah Airport Commission by dialing (912)964-0514 extension 3326. Cost of $25.00 per set. This cost is nonrefundable. This project consists all labor and materials required for concrete repairs, joint sealant replacement, expansion joint replacement, traffic membrane recoat, and other noted repairs for the parking garage structures as specified in the plans and specifications. All questions must be emailed to cmercado@flysav.com.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.