Active SLED Opportunity · CALIFORNIA · CITY OF SANTA CLARITA

    Safe Routes to School, Placerita Junior High School & Hart High School

    Issued by City of Santa Clarita
    cityIFBCity of Santa ClaritaSol. 9020459017
    Open · 19d remaining
    DAYS TO CLOSE
    19
    due Jun 22, 2026
    PUBLISHED
    May 22, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    The City of Santa Clarita seeks qualified contractors for street improvements near Placerita Junior High and Hart High Schools. The project includes new signage, striping, sidewalk and curb ramp construction, ADA accessibility upgrades, and traffic control. Bids are due June 22, 2026, with a recommended pre-bid conference on June 4, 2026.

    Opportunity details

    Solicitation No.
    9020459017
    Type / RFx
    IFB
    Status
    Active
    Level
    city
    Published Date
    May 22, 2026
    Due Date
    June 22, 2026
    NAICS Code
    237310AI guide
    Agency
    City of Santa Clarita

    Description

    The City of Santa Clarita is soliciting proposals from qualified contractors to perform street improvements in the area of Placerita Junior High School and Hart High School. This Safe Routes to School project includes new signing and striping, converting driveways into continuous sidewalks, and replacing standard curb ramps with safer bulb outs. Additional curb ramp reconstruction will ensure added ADA accessibility and create a more predictable, comfortable environment for students walking or biking to school. **Project Type**: IFB - Invitation for Bid (Formal) **Source ID**: PU.MU.USA.1480380.C14306401 **Piggyback Contract**: No **Question Acceptance Deadline**: 06/10/2026 02:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: C.I.P. **Reference Number**: 0000425462 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Proposal Form | Proposal Form | Yes | No | | Notice to Bidders | Notice to Bidders Regarding Contractual Requirements | Yes | No | | Bidder’s Information and Certification | Bidder’s Information and Certification | Yes | No | | Bidder’s Questionnaire | Bidder’s Questionnaire | Yes | No | | Certification of Non-Segregated Facilities | Certification of Non-Segregated Facilities | Yes | No | | Designation of Subcontractors | Designation of Subcontractors | Yes | No | | References | References | Yes | No | | Equal Employment Opportunity Certification | Equal Employment Opportunity Certification | Yes | No | | Non-Collusion Affidavit | Non-Collusion Affidavit | Yes | No | | Government-Wide Debarment and Suspension | Government-Wide Debarment and Suspension (Nonprocurement) | Yes | No | | Certifications and Restrictions on Lobbying | Certifications and Restrictions on Lobbying | Yes | No | | Buy America Certification | Buy America Certification | Yes | No | | Exhibit 12-B Bidder's List of Subs | Exhibit 12-B Bidder's List of Subs | Yes | No | | All signed addendums (if any) | All signed addendums (if any) | No | No | | General Attachments | General Attachments | No | No | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Recommended | Event date: 06/04/2026 05:00 PM EDT | Location: Zoom | Event Note: PRE-BID MEETING AND JOBWALK. A non-mandatory, pre-bid meeting to discuss the required scope of work will be held at 2:00 PM PT on June 4, 2026, via Zoom. https://santaclarita.zoomgov.com/j/1652945566 Meeting ID: 165 294 5566 Passcode: 849386 **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Project 1 Next Bid Schedule-Line Items STANDARD Code Description UOM Qty 1 Mobilization and Demobilization Lump-Sum 1 2 Water Pollution Control, Implementation and Maintenance of BMPs Lump-Sum 1 3 Construction Surveying and Monument Preservation Lump-Sum 1 4 Traffic Control Lump-Sum 1 5 Remove Existing Striping Linear Foot/Feet 600 6 Remove Existing Markings Square Foot/Feet 4860 7 Install Pavement Markings (White) Square Foot/Feet 1168 8 Install Pavement Markings (Yellow) Square Foot/Feet 2910 9 Install Stripe (Double-Yellow) Linear Foot/Feet 600 10 Install Stripe (White, 6-inch) Linear Foot/Feet 850 11 Install Curb Markings (Red) Linear Foot/Feet 740 12 Install Blue Fire Hydrant Pavement Marker Each 8 13 Remove Existing Sign and Post Each 1 14 Reset or Relocate Existing Sign on New Post Each 17 15 Install Sign and Post Each 28 16 Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) Each 2 17 Pedestrian Barricade Each 5 18 Remove Existing Asphalt Concrete Square Foot/Feet 4840 19 Remove Existing Concrete Facility Square Foot/Feet 12680 20 Remove Existing Handrail Linear Foot/Feet 20 21 Relocate Existing Mailbox Each 2 22 Remove and Replace Existing Bollard Each 1 23 Adjust to Grade Existing Water Valve Each 3 24 Adjust to Grade Existing Water Meter Each 3 25 Clearing and Grubbing Lump-Sum 1 26 Unclassified Excavation Cubic Yard 150 27 Crushed Miscellaneous Base Cubic Yard 90 28 Asphalt Concrete Ton 100 29 Curb and Gutter (Type A2-Varies) Linear Foot/Feet 640 30 Concrete Cross Gutter Square Foot/Feet 3130 31 Concrete Sidewalk Square Foot/Feet 6110 32 Curb Ramp Square Foot/Feet 3030 33 Concrete Driveway Approach (Commercial) Square Foot/Feet 340 34 Detectable Warning Surface Square Foot/Feet 360 35 Sod and Topsoil Import Square Foot/Feet 370 36 Root Barrier Linear Foot/Feet 70 | Next Bid Schedule-Line Items STANDARD Code Description UOM Qty 1 Mobilization and Demobilization Lump-Sum 1 2 Water Pollution Control, Implementation and Maintenance of BMPs Lump-Sum 1 3 Construction Surveying and Monument Preservation Lump-Sum 1 4 Traffic Control Lump-Sum 1 5 Remove Existing Striping Linear Foot/Feet 600 6 Remove Existing Markings Square Foot/Feet 4860 7 Install Pavement Markings (White) Square Foot/Feet 1168 8 Install Pavement Markings (Yellow) Square Foot/Feet 2910 9 Install Stripe (Double-Yellow) Linear Foot/Feet 600 10 Install Stripe (White, 6-inch) Linear Foot/Feet 850 11 Install Curb Markings (Red) Linear Foot/Feet 740 12 Install Blue Fire Hydrant Pavement Marker Each 8 13 Remove Existing Sign and Post Each 1 14 Reset or Relocate Existing Sign on New Post Each 17 15 Install Sign and Post Each 28 16 Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) Each 2 17 Pedestrian Barricade Each 5 18 Remove Existing Asphalt Concrete Square Foot/Feet 4840 19 Remove Existing Concrete Facility Square Foot/Feet 12680 20 Remove Existing Handrail Linear Foot/Feet 20 21 Relocate Existing Mailbox Each 2 22 Remove and Replace Existing Bollard Each 1 23 Adjust to Grade Existing Water Valve Each 3 24 Adjust to Grade Existing Water Meter Each 3 25 Clearing and Grubbing Lump-Sum 1 26 Unclassified Excavation Cubic Yard 150 27 Crushed Miscellaneous Base Cubic Yard 90 28 Asphalt Concrete Ton 100 29 Curb and Gutter (Type A2-Varies) Linear Foot/Feet 640 30 Concrete Cross Gutter Square Foot/Feet 3130 31 Concrete Sidewalk Square Foot/Feet 6110 32 Curb Ramp Square Foot/Feet 3030 33 Concrete Driveway Approach (Commercial) Square Foot/Feet 340 34 Detectable Warning Surface Square Foot/Feet 360 35 Sod and Topsoil Import Square Foot/Feet 370 36 Root Barrier Linear Foot/Feet 70 | Code Description UOM Qty | 1 Mobilization and Demobilization Lump-Sum 1 2 Water Pollution Control, Implementation and Maintenance of BMPs Lump-Sum 1 3 Construction Surveying and Monument Preservation Lump-Sum 1 4 Traffic Control Lump-Sum 1 5 Remove Existing Striping Linear Foot/Feet 600 6 Remove Existing Markings Square Foot/Feet 4860 7 Install Pavement Markings (White) Square Foot/Feet 1168 8 Install Pavement Markings (Yellow) Square Foot/Feet 2910 9 Install Stripe (Double-Yellow) Linear Foot/Feet 600 10 Install Stripe (White, 6-inch) Linear Foot/Feet 850 11 Install Curb Markings (Red) Linear Foot/Feet 740 12 Install Blue Fire Hydrant Pavement Marker Each 8 13 Remove Existing Sign and Post Each 1 14 Reset or Relocate Existing Sign on New Post Each 17 15 Install Sign and Post Each 28 16 Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) Each 2 17 Pedestrian Barricade Each 5 18 Remove Existing Asphalt Concrete Square Foot/Feet 4840 19 Remove Existing Concrete Facility Square Foot/Feet 12680 20 Remove Existing Handrail Linear Foot/Feet 20 21 Relocate Existing Mailbox Each 2 22 Remove and Replace Existing Bollard Each 1 23 Adjust to Grade Existing Water Valve Each 3 24 Adjust to Grade Existing Water Meter Each 3 25 Clearing and Grubbing Lump-Sum 1 26 Unclassified Excavation Cubic Yard 150 27 Crushed Miscellaneous Base Cubic Yard 90 28 Asphalt Concrete Ton 100 29 Curb and Gutter (Type A2-Varies) Linear Foot/Feet 640 30 Concrete Cross Gutter Square Foot/Feet 3130 31 Concrete Sidewalk Square Foot/Feet 6110 32 Curb Ramp Square Foot/Feet 3030 33 Concrete Driveway Approach (Commercial) Square Foot/Feet 340 34 Detectable Warning Surface Square Foot/Feet 360 35 Sod and Topsoil Import Square Foot/Feet 370 36 Root Barrier Linear Foot/Feet 70 | 1 | Mobilization and Demobilization | Lump-Sum | 1 | 2 | Water Pollution Control, Implementation and Maintenance of BMPs | Lump-Sum | 1 | 3 | Construction Surveying and Monument Preservation | Lump-Sum | 1 | 4 | Traffic Control | Lump-Sum | 1 | 5 | Remove Existing Striping | Linear Foot/Feet | 600 | 6 | Remove Existing Markings | Square Foot/Feet | 4860 | 7 | Install Pavement Markings (White) | Square Foot/Feet | 1168 | 8 | Install Pavement Markings (Yellow) | Square Foot/Feet | 2910 | 9 | Install Stripe (Double-Yellow) | Linear Foot/Feet | 600 | 10 | Install Stripe (White, 6-inch) | Linear Foot/Feet | 850 | 11 | Install Curb Markings (Red) | Linear Foot/Feet | 740 | 12 | Install Blue Fire Hydrant Pavement Marker | Each | 8 | 13 | Remove Existing Sign and Post | Each | 1 | 14 | Reset or Relocate Existing Sign on New Post | Each | 17 | 15 | Install Sign and Post | Each | 28 | 16 | Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) | Each | 2 | 17 | Pedestrian Barricade | Each | 5 | 18 | Remove Existing Asphalt Concrete | Square Foot/Feet | 4840 | 19 | Remove Existing Concrete Facility | Square Foot/Feet | 12680 | 20 | Remove Existing Handrail | Linear Foot/Feet | 20 | 21 | Relocate Existing Mailbox | Each | 2 | 22 | Remove and Replace Existing Bollard | Each | 1 | 23 | Adjust to Grade Existing Water Valve | Each | 3 | 24 | Adjust to Grade Existing Water Meter | Each | 3 | 25 | Clearing and Grubbing | Lump-Sum | 1 | 26 | Unclassified Excavation | Cubic Yard | 150 | 27 | Crushed Miscellaneous Base | Cubic Yard | 90 | 28 | Asphalt Concrete | Ton | 100 | 29 | Curb and Gutter (Type A2-Varies) | Linear Foot/Feet | 640 | 30 | Concrete Cross Gutter | Square Foot/Feet | 3130 | 31 | Concrete Sidewalk | Square Foot/Feet | 6110 | 32 | Curb Ramp | Square Foot/Feet | 3030 | 33 | Concrete Driveway Approach (Commercial) | Square Foot/Feet | 340 | 34 | Detectable Warning Surface | Square Foot/Feet | 360 | 35 | Sod and Topsoil Import | Square Foot/Feet | 370 | 36 | Root Barrier | Linear Foot/Feet | 70 | | | | Next Bid Schedule-Line Items STANDARD Code Description UOM Qty 1 Mobilization and Demobilization Lump-Sum 1 2 Water Pollution Control, Implementation and Maintenance of BMPs Lump-Sum 1 3 Construction Surveying and Monument Preservation Lump-Sum 1 4 Traffic Control Lump-Sum 1 5 Remove Existing Striping Linear Foot/Feet 600 6 Remove Existing Markings Square Foot/Feet 4860 7 Install Pavement Markings (White) Square Foot/Feet 1168 8 Install Pavement Markings (Yellow) Square Foot/Feet 2910 9 Install Stripe (Double-Yellow) Linear Foot/Feet 600 10 Install Stripe (White, 6-inch) Linear Foot/Feet 850 11 Install Curb Markings (Red) Linear Foot/Feet 740 12 Install Blue Fire Hydrant Pavement Marker Each 8 13 Remove Existing Sign and Post Each 1 14 Reset or Relocate Existing Sign on New Post Each 17 15 Install Sign and Post Each 28 16 Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) Each 2 17 Pedestrian Barricade Each 5 18 Remove Existing Asphalt Concrete Square Foot/Feet 4840 19 Remove Existing Concrete Facility Square Foot/Feet 12680 20 Remove Existing Handrail Linear Foot/Feet 20 21 Relocate Existing Mailbox Each 2 22 Remove and Replace Existing Bollard Each 1 23 Adjust to Grade Existing Water Valve Each 3 24 Adjust to Grade Existing Water Meter Each 3 25 Clearing and Grubbing Lump-Sum 1 26 Unclassified Excavation Cubic Yard 150 27 Crushed Miscellaneous Base Cubic Yard 90 28 Asphalt Concrete Ton 100 29 Curb and Gutter (Type A2-Varies) Linear Foot/Feet 640 30 Concrete Cross Gutter Square Foot/Feet 3130 31 Concrete Sidewalk Square Foot/Feet 6110 32 Curb Ramp Square Foot/Feet 3030 33 Concrete Driveway Approach (Commercial) Square Foot/Feet 340 34 Detectable Warning Surface Square Foot/Feet 360 35 Sod and Topsoil Import Square Foot/Feet 370 36 Root Barrier Linear Foot/Feet 70 | Code Description UOM Qty | 1 Mobilization and Demobilization Lump-Sum 1 2 Water Pollution Control, Implementation and Maintenance of BMPs Lump-Sum 1 3 Construction Surveying and Monument Preservation Lump-Sum 1 4 Traffic Control Lump-Sum 1 5 Remove Existing Striping Linear Foot/Feet 600 6 Remove Existing Markings Square Foot/Feet 4860 7 Install Pavement Markings (White) Square Foot/Feet 1168 8 Install Pavement Markings (Yellow) Square Foot/Feet 2910 9 Install Stripe (Double-Yellow) Linear Foot/Feet 600 10 Install Stripe (White, 6-inch) Linear Foot/Feet 850 11 Install Curb Markings (Red) Linear Foot/Feet 740 12 Install Blue Fire Hydrant Pavement Marker Each 8 13 Remove Existing Sign and Post Each 1 14 Reset or Relocate Existing Sign on New Post Each 17 15 Install Sign and Post Each 28 16 Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) Each 2 17 Pedestrian Barricade Each 5 18 Remove Existing Asphalt Concrete Square Foot/Feet 4840 19 Remove Existing Concrete Facility Square Foot/Feet 12680 20 Remove Existing Handrail Linear Foot/Feet 20 21 Relocate Existing Mailbox Each 2 22 Remove and Replace Existing Bollard Each 1 23 Adjust to Grade Existing Water Valve Each 3 24 Adjust to Grade Existing Water Meter Each 3 25 Clearing and Grubbing Lump-Sum 1 26 Unclassified Excavation Cubic Yard 150 27 Crushed Miscellaneous Base Cubic Yard 90 28 Asphalt Concrete Ton 100 29 Curb and Gutter (Type A2-Varies) Linear Foot/Feet 640 30 Concrete Cross Gutter Square Foot/Feet 3130 31 Concrete Sidewalk Square Foot/Feet 6110 32 Curb Ramp Square Foot/Feet 3030 33 Concrete Driveway Approach (Commercial) Square Foot/Feet 340 34 Detectable Warning Surface Square Foot/Feet 360 35 Sod and Topsoil Import Square Foot/Feet 370 36 Root Barrier Linear Foot/Feet 70 | 1 | Mobilization and Demobilization | Lump-Sum | 1 | 2 | Water Pollution Control, Implementation and Maintenance of BMPs | Lump-Sum | 1 | 3 | Construction Surveying and Monument Preservation | Lump-Sum | 1 | 4 | Traffic Control | Lump-Sum | 1 | 5 | Remove Existing Striping | Linear Foot/Feet | 600 | 6 | Remove Existing Markings | Square Foot/Feet | 4860 | 7 | Install Pavement Markings (White) | Square Foot/Feet | 1168 | 8 | Install Pavement Markings (Yellow) | Square Foot/Feet | 2910 | 9 | Install Stripe (Double-Yellow) | Linear Foot/Feet | 600 | 10 | Install Stripe (White, 6-inch) | Linear Foot/Feet | 850 | 11 | Install Curb Markings (Red) | Linear Foot/Feet | 740 | 12 | Install Blue Fire Hydrant Pavement Marker | Each | 8 | 13 | Remove Existing Sign and Post | Each | 1 | 14 | Reset or Relocate Existing Sign on New Post | Each | 17 | 15 | Install Sign and Post | Each | 28 | 16 | Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) | Each | 2 | 17 | Pedestrian Barricade | Each | 5 | 18 | Remove Existing Asphalt Concrete | Square Foot/Feet | 4840 | 19 | Remove Existing Concrete Facility | Square Foot/Feet | 12680 | 20 | Remove Existing Handrail | Linear Foot/Feet | 20 | 21 | Relocate Existing Mailbox | Each | 2 | 22 | Remove and Replace Existing Bollard | Each | 1 | 23 | Adjust to Grade Existing Water Valve | Each | 3 | 24 | Adjust to Grade Existing Water Meter | Each | 3 | 25 | Clearing and Grubbing | Lump-Sum | 1 | 26 | Unclassified Excavation | Cubic Yard | 150 | 27 | Crushed Miscellaneous Base | Cubic Yard | 90 | 28 | Asphalt Concrete | Ton | 100 | 29 | Curb and Gutter (Type A2-Varies) | Linear Foot/Feet | 640 | 30 | Concrete Cross Gutter | Square Foot/Feet | 3130 | 31 | Concrete Sidewalk | Square Foot/Feet | 6110 | 32 | Curb Ramp | Square Foot/Feet | 3030 | 33 | Concrete Driveway Approach (Commercial) | Square Foot/Feet | 340 | 34 | Detectable Warning Surface | Square Foot/Feet | 360 | 35 | Sod and Topsoil Import | Square Foot/Feet | 370 | 36 | Root Barrier | Linear Foot/Feet | 70 | | | Code Description UOM Qty | | 1 Mobilization and Demobilization Lump-Sum 1 2 Water Pollution Control, Implementation and Maintenance of BMPs Lump-Sum 1 3 Construction Surveying and Monument Preservation Lump-Sum 1 4 Traffic Control Lump-Sum 1 5 Remove Existing Striping Linear Foot/Feet 600 6 Remove Existing Markings Square Foot/Feet 4860 7 Install Pavement Markings (White) Square Foot/Feet 1168 8 Install Pavement Markings (Yellow) Square Foot/Feet 2910 9 Install Stripe (Double-Yellow) Linear Foot/Feet 600 10 Install Stripe (White, 6-inch) Linear Foot/Feet 850 11 Install Curb Markings (Red) Linear Foot/Feet 740 12 Install Blue Fire Hydrant Pavement Marker Each 8 13 Remove Existing Sign and Post Each 1 14 Reset or Relocate Existing Sign on New Post Each 17 15 Install Sign and Post Each 28 16 Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) Each 2 17 Pedestrian Barricade Each 5 18 Remove Existing Asphalt Concrete Square Foot/Feet 4840 19 Remove Existing Concrete Facility Square Foot/Feet 12680 20 Remove Existing Handrail Linear Foot/Feet 20 21 Relocate Existing Mailbox Each 2 22 Remove and Replace Existing Bollard Each 1 23 Adjust to Grade Existing Water Valve Each 3 24 Adjust to Grade Existing Water Meter Each 3 25 Clearing and Grubbing Lump-Sum 1 26 Unclassified Excavation Cubic Yard 150 27 Crushed Miscellaneous Base Cubic Yard 90 28 Asphalt Concrete Ton 100 29 Curb and Gutter (Type A2-Varies) Linear Foot/Feet 640 30 Concrete Cross Gutter Square Foot/Feet 3130 31 Concrete Sidewalk Square Foot/Feet 6110 32 Curb Ramp Square Foot/Feet 3030 33 Concrete Driveway Approach (Commercial) Square Foot/Feet 340 34 Detectable Warning Surface Square Foot/Feet 360 35 Sod and Topsoil Import Square Foot/Feet 370 36 Root Barrier Linear Foot/Feet 70 | 1 | Mobilization and Demobilization | Lump-Sum | 1 | 2 | Water Pollution Control, Implementation and Maintenance of BMPs | Lump-Sum | 1 | 3 | Construction Surveying and Monument Preservation | Lump-Sum | 1 | 4 | Traffic Control | Lump-Sum | 1 | 5 | Remove Existing Striping | Linear Foot/Feet | 600 | 6 | Remove Existing Markings | Square Foot/Feet | 4860 | 7 | Install Pavement Markings (White) | Square Foot/Feet | 1168 | 8 | Install Pavement Markings (Yellow) | Square Foot/Feet | 2910 | 9 | Install Stripe (Double-Yellow) | Linear Foot/Feet | 600 | 10 | Install Stripe (White, 6-inch) | Linear Foot/Feet | 850 | 11 | Install Curb Markings (Red) | Linear Foot/Feet | 740 | 12 | Install Blue Fire Hydrant Pavement Marker | Each | 8 | 13 | Remove Existing Sign and Post | Each | 1 | 14 | Reset or Relocate Existing Sign on New Post | Each | 17 | 15 | Install Sign and Post | Each | 28 | 16 | Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) | Each | 2 | 17 | Pedestrian Barricade | Each | 5 | 18 | Remove Existing Asphalt Concrete | Square Foot/Feet | 4840 | 19 | Remove Existing Concrete Facility | Square Foot/Feet | 12680 | 20 | Remove Existing Handrail | Linear Foot/Feet | 20 | 21 | Relocate Existing Mailbox | Each | 2 | 22 | Remove and Replace Existing Bollard | Each | 1 | 23 | Adjust to Grade Existing Water Valve | Each | 3 | 24 | Adjust to Grade Existing Water Meter | Each | 3 | 25 | Clearing and Grubbing | Lump-Sum | 1 | 26 | Unclassified Excavation | Cubic Yard | 150 | 27 | Crushed Miscellaneous Base | Cubic Yard | 90 | 28 | Asphalt Concrete | Ton | 100 | 29 | Curb and Gutter (Type A2-Varies) | Linear Foot/Feet | 640 | 30 | Concrete Cross Gutter | Square Foot/Feet | 3130 | 31 | Concrete Sidewalk | Square Foot/Feet | 6110 | 32 | Curb Ramp | Square Foot/Feet | 3030 | 33 | Concrete Driveway Approach (Commercial) | Square Foot/Feet | 340 | 34 | Detectable Warning Surface | Square Foot/Feet | 360 | 35 | Sod and Topsoil Import | Square Foot/Feet | 370 | 36 | Root Barrier | Linear Foot/Feet | 70 | | | 1 | Mobilization and Demobilization | Lump-Sum | 1 | | 2 | Water Pollution Control, Implementation and Maintenance of BMPs | Lump-Sum | 1 | | 3 | Construction Surveying and Monument Preservation | Lump-Sum | 1 | | 4 | Traffic Control | Lump-Sum | 1 | | 5 | Remove Existing Striping | Linear Foot/Feet | 600 | | 6 | Remove Existing Markings | Square Foot/Feet | 4860 | | 7 | Install Pavement Markings (White) | Square Foot/Feet | 1168 | | 8 | Install Pavement Markings (Yellow) | Square Foot/Feet | 2910 | | 9 | Install Stripe (Double-Yellow) | Linear Foot/Feet | 600 | | 10 | Install Stripe (White, 6-inch) | Linear Foot/Feet | 850 | | 11 | Install Curb Markings (Red) | Linear Foot/Feet | 740 | | 12 | Install Blue Fire Hydrant Pavement Marker | Each | 8 | | 13 | Remove Existing Sign and Post | Each | 1 | | 14 | Reset or Relocate Existing Sign on New Post | Each | 17 | | 15 | Install Sign and Post | Each | 28 | | 16 | Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) | Each | 2 | | 17 | Pedestrian Barricade | Each | 5 | | 18 | Remove Existing Asphalt Concrete | Square Foot/Feet | 4840 | | 19 | Remove Existing Concrete Facility | Square Foot/Feet | 12680 | | 20 | Remove Existing Handrail | Linear Foot/Feet | 20 | | 21 | Relocate Existing Mailbox | Each | 2 | | 22 | Remove and Replace Existing Bollard | Each | 1 | | 23 | Adjust to Grade Existing Water Valve | Each | 3 | | 24 | Adjust to Grade Existing Water Meter | Each | 3 | | 25 | Clearing and Grubbing | Lump-Sum | 1 | | 26 | Unclassified Excavation | Cubic Yard | 150 | | 27 | Crushed Miscellaneous Base | Cubic Yard | 90 | | 28 | Asphalt Concrete | Ton | 100 | | 29 | Curb and Gutter (Type A2-Varies) | Linear Foot/Feet | 640 | | 30 | Concrete Cross Gutter | Square Foot/Feet | 3130 | | 31 | Concrete Sidewalk | Square Foot/Feet | 6110 | | 32 | Curb Ramp | Square Foot/Feet | 3030 | | 33 | Concrete Driveway Approach (Commercial) | Square Foot/Feet | 340 | | 34 | Detectable Warning Surface | Square Foot/Feet | 360 | | 35 | Sod and Topsoil Import | Square Foot/Feet | 370 | | 36 | Root Barrier | Linear Foot/Feet | 70 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Bid Schedule-Line Items STANDARD Code Description UOM Qty 1 Mobilization and Demobilization Lump-Sum 1 2 Water Pollution Control, Implementation and Maintenance of BMPs Lump-Sum 1 3 Construction Surveying and Monument Preservation Lump-Sum 1 4 Traffic Control Lump-Sum 1 5 Remove Existing Striping Linear Foot/Feet 600 6 Remove Existing Markings Square Foot/Feet 4860 7 Install Pavement Markings (White) Square Foot/Feet 1168 8 Install Pavement Markings (Yellow) Square Foot/Feet 2910 9 Install Stripe (Double-Yellow) Linear Foot/Feet 600 10 Install Stripe (White, 6-inch) Linear Foot/Feet 850 11 Install Curb Markings (Red) Linear Foot/Feet 740 12 Install Blue Fire Hydrant Pavement Marker Each 8 13 Remove Existing Sign and Post Each 1 14 Reset or Relocate Existing Sign on New Post Each 17 15 Install Sign and Post Each 28 16 Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) Each 2 17 Pedestrian Barricade Each 5 18 Remove Existing Asphalt Concrete Square Foot/Feet 4840 19 Remove Existing Concrete Facility Square Foot/Feet 12680 20 Remove Existing Handrail Linear Foot/Feet 20 21 Relocate Existing Mailbox Each 2 22 Remove and Replace Existing Bollard Each 1 23 Adjust to Grade Existing Water Valve Each 3 24 Adjust to Grade Existing Water Meter Each 3 25 Clearing and Grubbing Lump-Sum 1 26 Unclassified Excavation Cubic Yard 150 27 Crushed Miscellaneous Base Cubic Yard 90 28 Asphalt Concrete Ton 100 29 Curb and Gutter (Type A2-Varies) Linear Foot/Feet 640 30 Concrete Cross Gutter Square Foot/Feet 3130 31 Concrete Sidewalk Square Foot/Feet 6110 32 Curb Ramp Square Foot/Feet 3030 33 Concrete Driveway Approach (Commercial) Square Foot/Feet 340 34 Detectable Warning Surface Square Foot/Feet 360 35 Sod and Topsoil Import Square Foot/Feet 370 36 Root Barrier Linear Foot/Feet 70 | Code Description UOM Qty | 1 Mobilization and Demobilization Lump-Sum 1 2 Water Pollution Control, Implementation and Maintenance of BMPs Lump-Sum 1 3 Construction Surveying and Monument Preservation Lump-Sum 1 4 Traffic Control Lump-Sum 1 5 Remove Existing Striping Linear Foot/Feet 600 6 Remove Existing Markings Square Foot/Feet 4860 7 Install Pavement Markings (White) Square Foot/Feet 1168 8 Install Pavement Markings (Yellow) Square Foot/Feet 2910 9 Install Stripe (Double-Yellow) Linear Foot/Feet 600 10 Install Stripe (White, 6-inch) Linear Foot/Feet 850 11 Install Curb Markings (Red) Linear Foot/Feet 740 12 Install Blue Fire Hydrant Pavement Marker Each 8 13 Remove Existing Sign and Post Each 1 14 Reset or Relocate Existing Sign on New Post Each 17 15 Install Sign and Post Each 28 16 Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) Each 2 17 Pedestrian Barricade Each 5 18 Remove Existing Asphalt Concrete Square Foot/Feet 4840 19 Remove Existing Concrete Facility Square Foot/Feet 12680 20 Remove Existing Handrail Linear Foot/Feet 20 21 Relocate Existing Mailbox Each 2 22 Remove and Replace Existing Bollard Each 1 23 Adjust to Grade Existing Water Valve Each 3 24 Adjust to Grade Existing Water Meter Each 3 25 Clearing and Grubbing Lump-Sum 1 26 Unclassified Excavation Cubic Yard 150 27 Crushed Miscellaneous Base Cubic Yard 90 28 Asphalt Concrete Ton 100 29 Curb and Gutter (Type A2-Varies) Linear Foot/Feet 640 30 Concrete Cross Gutter Square Foot/Feet 3130 31 Concrete Sidewalk Square Foot/Feet 6110 32 Curb Ramp Square Foot/Feet 3030 33 Concrete Driveway Approach (Commercial) Square Foot/Feet 340 34 Detectable Warning Surface Square Foot/Feet 360 35 Sod and Topsoil Import Square Foot/Feet 370 36 Root Barrier Linear Foot/Feet 70 | 1 | Mobilization and Demobilization | Lump-Sum | 1 | 2 | Water Pollution Control, Implementation and Maintenance of BMPs | Lump-Sum | 1 | 3 | Construction Surveying and Monument Preservation | Lump-Sum | 1 | 4 | Traffic Control | Lump-Sum | 1 | 5 | Remove Existing Striping | Linear Foot/Feet | 600 | 6 | Remove Existing Markings | Square Foot/Feet | 4860 | 7 | Install Pavement Markings (White) | Square Foot/Feet | 1168 | 8 | Install Pavement Markings (Yellow) | Square Foot/Feet | 2910 | 9 | Install Stripe (Double-Yellow) | Linear Foot/Feet | 600 | 10 | Install Stripe (White, 6-inch) | Linear Foot/Feet | 850 | 11 | Install Curb Markings (Red) | Linear Foot/Feet | 740 | 12 | Install Blue Fire Hydrant Pavement Marker | Each | 8 | 13 | Remove Existing Sign and Post | Each | 1 | 14 | Reset or Relocate Existing Sign on New Post | Each | 17 | 15 | Install Sign and Post | Each | 28 | 16 | Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) | Each | 2 | 17 | Pedestrian Barricade | Each | 5 | 18 | Remove Existing Asphalt Concrete | Square Foot/Feet | 4840 | 19 | Remove Existing Concrete Facility | Square Foot/Feet | 12680 | 20 | Remove Existing Handrail | Linear Foot/Feet | 20 | 21 | Relocate Existing Mailbox | Each | 2 | 22 | Remove and Replace Existing Bollard | Each | 1 | 23 | Adjust to Grade Existing Water Valve | Each | 3 | 24 | Adjust to Grade Existing Water Meter | Each | 3 | 25 | Clearing and Grubbing | Lump-Sum | 1 | 26 | Unclassified Excavation | Cubic Yard | 150 | 27 | Crushed Miscellaneous Base | Cubic Yard | 90 | 28 | Asphalt Concrete | Ton | 100 | 29 | Curb and Gutter (Type A2-Varies) | Linear Foot/Feet | 640 | 30 | Concrete Cross Gutter | Square Foot/Feet | 3130 | 31 | Concrete Sidewalk | Square Foot/Feet | 6110 | 32 | Curb Ramp | Square Foot/Feet | 3030 | 33 | Concrete Driveway Approach (Commercial) | Square Foot/Feet | 340 | 34 | Detectable Warning Surface | Square Foot/Feet | 360 | 35 | Sod and Topsoil Import | Square Foot/Feet | 370 | 36 | Root Barrier | Linear Foot/Feet | 70 | | | Code Description UOM Qty | | 1 Mobilization and Demobilization Lump-Sum 1 2 Water Pollution Control, Implementation and Maintenance of BMPs Lump-Sum 1 3 Construction Surveying and Monument Preservation Lump-Sum 1 4 Traffic Control Lump-Sum 1 5 Remove Existing Striping Linear Foot/Feet 600 6 Remove Existing Markings Square Foot/Feet 4860 7 Install Pavement Markings (White) Square Foot/Feet 1168 8 Install Pavement Markings (Yellow) Square Foot/Feet 2910 9 Install Stripe (Double-Yellow) Linear Foot/Feet 600 10 Install Stripe (White, 6-inch) Linear Foot/Feet 850 11 Install Curb Markings (Red) Linear Foot/Feet 740 12 Install Blue Fire Hydrant Pavement Marker Each 8 13 Remove Existing Sign and Post Each 1 14 Reset or Relocate Existing Sign on New Post Each 17 15 Install Sign and Post Each 28 16 Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) Each 2 17 Pedestrian Barricade Each 5 18 Remove Existing Asphalt Concrete Square Foot/Feet 4840 19 Remove Existing Concrete Facility Square Foot/Feet 12680 20 Remove Existing Handrail Linear Foot/Feet 20 21 Relocate Existing Mailbox Each 2 22 Remove and Replace Existing Bollard Each 1 23 Adjust to Grade Existing Water Valve Each 3 24 Adjust to Grade Existing Water Meter Each 3 25 Clearing and Grubbing Lump-Sum 1 26 Unclassified Excavation Cubic Yard 150 27 Crushed Miscellaneous Base Cubic Yard 90 28 Asphalt Concrete Ton 100 29 Curb and Gutter (Type A2-Varies) Linear Foot/Feet 640 30 Concrete Cross Gutter Square Foot/Feet 3130 31 Concrete Sidewalk Square Foot/Feet 6110 32 Curb Ramp Square Foot/Feet 3030 33 Concrete Driveway Approach (Commercial) Square Foot/Feet 340 34 Detectable Warning Surface Square Foot/Feet 360 35 Sod and Topsoil Import Square Foot/Feet 370 36 Root Barrier Linear Foot/Feet 70 | 1 | Mobilization and Demobilization | Lump-Sum | 1 | 2 | Water Pollution Control, Implementation and Maintenance of BMPs | Lump-Sum | 1 | 3 | Construction Surveying and Monument Preservation | Lump-Sum | 1 | 4 | Traffic Control | Lump-Sum | 1 | 5 | Remove Existing Striping | Linear Foot/Feet | 600 | 6 | Remove Existing Markings | Square Foot/Feet | 4860 | 7 | Install Pavement Markings (White) | Square Foot/Feet | 1168 | 8 | Install Pavement Markings (Yellow) | Square Foot/Feet | 2910 | 9 | Install Stripe (Double-Yellow) | Linear Foot/Feet | 600 | 10 | Install Stripe (White, 6-inch) | Linear Foot/Feet | 850 | 11 | Install Curb Markings (Red) | Linear Foot/Feet | 740 | 12 | Install Blue Fire Hydrant Pavement Marker | Each | 8 | 13 | Remove Existing Sign and Post | Each | 1 | 14 | Reset or Relocate Existing Sign on New Post | Each | 17 | 15 | Install Sign and Post | Each | 28 | 16 | Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) | Each | 2 | 17 | Pedestrian Barricade | Each | 5 | 18 | Remove Existing Asphalt Concrete | Square Foot/Feet | 4840 | 19 | Remove Existing Concrete Facility | Square Foot/Feet | 12680 | 20 | Remove Existing Handrail | Linear Foot/Feet | 20 | 21 | Relocate Existing Mailbox | Each | 2 | 22 | Remove and Replace Existing Bollard | Each | 1 | 23 | Adjust to Grade Existing Water Valve | Each | 3 | 24 | Adjust to Grade Existing Water Meter | Each | 3 | 25 | Clearing and Grubbing | Lump-Sum | 1 | 26 | Unclassified Excavation | Cubic Yard | 150 | 27 | Crushed Miscellaneous Base | Cubic Yard | 90 | 28 | Asphalt Concrete | Ton | 100 | 29 | Curb and Gutter (Type A2-Varies) | Linear Foot/Feet | 640 | 30 | Concrete Cross Gutter | Square Foot/Feet | 3130 | 31 | Concrete Sidewalk | Square Foot/Feet | 6110 | 32 | Curb Ramp | Square Foot/Feet | 3030 | 33 | Concrete Driveway Approach (Commercial) | Square Foot/Feet | 340 | 34 | Detectable Warning Surface | Square Foot/Feet | 360 | 35 | Sod and Topsoil Import | Square Foot/Feet | 370 | 36 | Root Barrier | Linear Foot/Feet | 70 | | | 1 | Mobilization and Demobilization | Lump-Sum | 1 | | 2 | Water Pollution Control, Implementation and Maintenance of BMPs | Lump-Sum | 1 | | 3 | Construction Surveying and Monument Preservation | Lump-Sum | 1 | | 4 | Traffic Control | Lump-Sum | 1 | | 5 | Remove Existing Striping | Linear Foot/Feet | 600 | | 6 | Remove Existing Markings | Square Foot/Feet | 4860 | | 7 | Install Pavement Markings (White) | Square Foot/Feet | 1168 | | 8 | Install Pavement Markings (Yellow) | Square Foot/Feet | 2910 | | 9 | Install Stripe (Double-Yellow) | Linear Foot/Feet | 600 | | 10 | Install Stripe (White, 6-inch) | Linear Foot/Feet | 850 | | 11 | Install Curb Markings (Red) | Linear Foot/Feet | 740 | | 12 | Install Blue Fire Hydrant Pavement Marker | Each | 8 | | 13 | Remove Existing Sign and Post | Each | 1 | | 14 | Reset or Relocate Existing Sign on New Post | Each | 17 | | 15 | Install Sign and Post | Each | 28 | | 16 | Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) | Each | 2 | | 17 | Pedestrian Barricade | Each | 5 | | 18 | Remove Existing Asphalt Concrete | Square Foot/Feet | 4840 | | 19 | Remove Existing Concrete Facility | Square Foot/Feet | 12680 | | 20 | Remove Existing Handrail | Linear Foot/Feet | 20 | | 21 | Relocate Existing Mailbox | Each | 2 | | 22 | Remove and Replace Existing Bollard | Each | 1 | | 23 | Adjust to Grade Existing Water Valve | Each | 3 | | 24 | Adjust to Grade Existing Water Meter | Each | 3 | | 25 | Clearing and Grubbing | Lump-Sum | 1 | | 26 | Unclassified Excavation | Cubic Yard | 150 | | 27 | Crushed Miscellaneous Base | Cubic Yard | 90 | | 28 | Asphalt Concrete | Ton | 100 | | 29 | Curb and Gutter (Type A2-Varies) | Linear Foot/Feet | 640 | | 30 | Concrete Cross Gutter | Square Foot/Feet | 3130 | | 31 | Concrete Sidewalk | Square Foot/Feet | 6110 | | 32 | Curb Ramp | Square Foot/Feet | 3030 | | 33 | Concrete Driveway Approach (Commercial) | Square Foot/Feet | 340 | | 34 | Detectable Warning Surface | Square Foot/Feet | 360 | | 35 | Sod and Topsoil Import | Square Foot/Feet | 370 | | 36 | Root Barrier | Linear Foot/Feet | 70 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Code Description UOM Qty | | 1 Mobilization and Demobilization Lump-Sum 1 2 Water Pollution Control, Implementation and Maintenance of BMPs Lump-Sum 1 3 Construction Surveying and Monument Preservation Lump-Sum 1 4 Traffic Control Lump-Sum 1 5 Remove Existing Striping Linear Foot/Feet 600 6 Remove Existing Markings Square Foot/Feet 4860 7 Install Pavement Markings (White) Square Foot/Feet 1168 8 Install Pavement Markings (Yellow) Square Foot/Feet 2910 9 Install Stripe (Double-Yellow) Linear Foot/Feet 600 10 Install Stripe (White, 6-inch) Linear Foot/Feet 850 11 Install Curb Markings (Red) Linear Foot/Feet 740 12 Install Blue Fire Hydrant Pavement Marker Each 8 13 Remove Existing Sign and Post Each 1 14 Reset or Relocate Existing Sign on New Post Each 17 15 Install Sign and Post Each 28 16 Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) Each 2 17 Pedestrian Barricade Each 5 18 Remove Existing Asphalt Concrete Square Foot/Feet 4840 19 Remove Existing Concrete Facility Square Foot/Feet 12680 20 Remove Existing Handrail Linear Foot/Feet 20 21 Relocate Existing Mailbox Each 2 22 Remove and Replace Existing Bollard Each 1 23 Adjust to Grade Existing Water Valve Each 3 24 Adjust to Grade Existing Water Meter Each 3 25 Clearing and Grubbing Lump-Sum 1 26 Unclassified Excavation Cubic Yard 150 27 Crushed Miscellaneous Base Cubic Yard 90 28 Asphalt Concrete Ton 100 29 Curb and Gutter (Type A2-Varies) Linear Foot/Feet 640 30 Concrete Cross Gutter Square Foot/Feet 3130 31 Concrete Sidewalk Square Foot/Feet 6110 32 Curb Ramp Square Foot/Feet 3030 33 Concrete Driveway Approach (Commercial) Square Foot/Feet 340 34 Detectable Warning Surface Square Foot/Feet 360 35 Sod and Topsoil Import Square Foot/Feet 370 36 Root Barrier Linear Foot/Feet 70 | 1 | Mobilization and Demobilization | Lump-Sum | 1 | 2 | Water Pollution Control, Implementation and Maintenance of BMPs | Lump-Sum | 1 | 3 | Construction Surveying and Monument Preservation | Lump-Sum | 1 | 4 | Traffic Control | Lump-Sum | 1 | 5 | Remove Existing Striping | Linear Foot/Feet | 600 | 6 | Remove Existing Markings | Square Foot/Feet | 4860 | 7 | Install Pavement Markings (White) | Square Foot/Feet | 1168 | 8 | Install Pavement Markings (Yellow) | Square Foot/Feet | 2910 | 9 | Install Stripe (Double-Yellow) | Linear Foot/Feet | 600 | 10 | Install Stripe (White, 6-inch) | Linear Foot/Feet | 850 | 11 | Install Curb Markings (Red) | Linear Foot/Feet | 740 | 12 | Install Blue Fire Hydrant Pavement Marker | Each | 8 | 13 | Remove Existing Sign and Post | Each | 1 | 14 | Reset or Relocate Existing Sign on New Post | Each | 17 | 15 | Install Sign and Post | Each | 28 | 16 | Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) | Each | 2 | 17 | Pedestrian Barricade | Each | 5 | 18 | Remove Existing Asphalt Concrete | Square Foot/Feet | 4840 | 19 | Remove Existing Concrete Facility | Square Foot/Feet | 12680 | 20 | Remove Existing Handrail | Linear Foot/Feet | 20 | 21 | Relocate Existing Mailbox | Each | 2 | 22 | Remove and Replace Existing Bollard | Each | 1 | 23 | Adjust to Grade Existing Water Valve | Each | 3 | 24 | Adjust to Grade Existing Water Meter | Each | 3 | 25 | Clearing and Grubbing | Lump-Sum | 1 | 26 | Unclassified Excavation | Cubic Yard | 150 | 27 | Crushed Miscellaneous Base | Cubic Yard | 90 | 28 | Asphalt Concrete | Ton | 100 | 29 | Curb and Gutter (Type A2-Varies) | Linear Foot/Feet | 640 | 30 | Concrete Cross Gutter | Square Foot/Feet | 3130 | 31 | Concrete Sidewalk | Square Foot/Feet | 6110 | 32 | Curb Ramp | Square Foot/Feet | 3030 | 33 | Concrete Driveway Approach (Commercial) | Square Foot/Feet | 340 | 34 | Detectable Warning Surface | Square Foot/Feet | 360 | 35 | Sod and Topsoil Import | Square Foot/Feet | 370 | 36 | Root Barrier | Linear Foot/Feet | 70 | | | 1 | Mobilization and Demobilization | Lump-Sum | 1 | | 2 | Water Pollution Control, Implementation and Maintenance of BMPs | Lump-Sum | 1 | | 3 | Construction Surveying and Monument Preservation | Lump-Sum | 1 | | 4 | Traffic Control | Lump-Sum | 1 | | 5 | Remove Existing Striping | Linear Foot/Feet | 600 | | 6 | Remove Existing Markings | Square Foot/Feet | 4860 | | 7 | Install Pavement Markings (White) | Square Foot/Feet | 1168 | | 8 | Install Pavement Markings (Yellow) | Square Foot/Feet | 2910 | | 9 | Install Stripe (Double-Yellow) | Linear Foot/Feet | 600 | | 10 | Install Stripe (White, 6-inch) | Linear Foot/Feet | 850 | | 11 | Install Curb Markings (Red) | Linear Foot/Feet | 740 | | 12 | Install Blue Fire Hydrant Pavement Marker | Each | 8 | | 13 | Remove Existing Sign and Post | Each | 1 | | 14 | Reset or Relocate Existing Sign on New Post | Each | 17 | | 15 | Install Sign and Post | Each | 28 | | 16 | Vehicle Radar Speed Feedback Assembly (Solar PV-Powered) | Each | 2 | | 17 | Pedestrian Barricade | Each | 5 | | 18 | Remove Existing Asphalt Concrete | Square Foot/Feet | 4840 | | 19 | Remove Existing Concrete Facility | Square Foot/Feet | 12680 | | 20 | Remove Existing Handrail | Linear Foot/Feet | 20 | | 21 | Relocate Existing Mailbox | Each | 2 | | 22 | Remove and Replace Existing Bollard | Each | 1 | | 23 | Adjust to Grade Existing Water Valve | Each | 3 | | 24 | Adjust to Grade Existing Water Meter | Each | 3 | | 25 | Clearing and Grubbing | Lump-Sum | 1 | | 26 | Unclassified Excavation | Cubic Yard | 150 | | 27 | Crushed Miscellaneous Base | Cubic Yard | 90 | | 28 | Asphalt Concrete | Ton | 100 | | 29 | Curb and Gutter (Type A2-Varies) | Linear Foot/Feet | 640 | | 30 | Concrete Cross Gutter | Square Foot/Feet | 3130 | | 31 | Concrete Sidewalk | Square Foot/Feet | 6110 | | 32 | Curb Ramp | Square Foot/Feet | 3030 | | 33 | Concrete Driveway Approach (Commercial) | Square Foot/Feet | 340 | | 34 | Detectable Warning Surface | Square Foot/Feet | 360 | | 35 | Sod and Topsoil Import | Square Foot/Feet | 370 | | 36 | Root Barrier | Linear Foot/Feet | 70 |

    Key dates

    1. May 22, 2026Published
    2. June 22, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.