Santa Cruz County seeks bids for the San Lorenzo Way Bridge Replacement project in Felton, CA. The project includes bridge removal and construction, road and sidewalk work, and requires completion within 190 working days. Estimated cost is $6.67M. Electronic bids due June 18, 2026.
The County of Santa Cruz, Department of Community Development & Infrastructure is accepting sealed bids for the
SAN LORENZO WAY BRIDGE REPLACEMENT, FEDERAL PROJECT No. BRLO-5936(086)
Bid opening will occur on Thursday, June 18, 2026 no later than 2:00 pm and soon thereafter, will be publicly opened and read.
| Event | Date | Location |
|---|---|---|
| Bid Opening | 2026-06-18T21:00:00.000Z | The County of Santa Cruz Department of CDI will conduct bid openings through the videoconferencing platform, Zoom, in lieu of in person attendance. Bid results will be posted to OpenGov after the bid opening. To view the live bid opening please go to: Topic: SAN LORENZO WAY BRIDGE REPLACEMENT, FEDERAL PROJECT NO. BRLO-5936(086) Date and Time: June 18, 2026 at 2:00 p.m. Pacific Time Zoom Meeting: https://santacruzcounty-us.zoomgov.com/j/1600655453?pwd=9ab6raJmTwGCaGEk6JCKyY1efT8bEK.1 Meeting ID: 160 065 5453 Passcode: 849767 Find your local number: https://santacruzcounty-us.zoomgov.com/u/a4DdWX746 |
Book 1 of 2
Bid Book
For Construction of
SAN LORENZO WAY BRIDGE REPLACEMENT, FEDERAL PROJECT No. BRLO-5936(086)
Cashier's check or certified check, payable to the order of the County of Santa Cruz, of not less ten percent (10%) of the bid submitted, payable to the County of Santa Cruz and signed by the bidder as well as a corporate surety, shall accompany the bid. Bidder’s bonds shall be issued by a corporate surety duly admitted and authorized to issue bonds and undertakings by the State of California. Scan and upload a copy of your bid bond/cashier's check via the online procurement portal, OpenGov.
No later than 4 p.m. on the 5th business day after bid opening, please mail the original Proposal forms, remaining Proposal forms due as stated in Section 2, and the bid bond/cashier's or certified check to the Contract Analyst, Rosa Ortiz;
The project is located in the County of Santa Cruz as follows:
In Felton, near Highway 9 just north of Graham Hill Road
Work includes removal and construction of the San Lorenzo Way Bridge across the San Lorenzo River. Major work includes, but is not limited to:
Traffic handling, tree removal, bridge removal, drilling cast-in-drilled hole concrete piling, construction of reinforced concrete footings and abutments, retaining wall construction, approach road reconstruction, curb, gutter and sidewalk construction, driveway reconstruction, and construction of a cast-in-place prestressed box girder bridge.
For the Federal training program, the number of trainees or apprentices is 4.
Federal-aid project No.: BRLO-5936(086).
Complete the work within 190 working days.
Complete plant establishment work within 120 days
The estimated cost of the project is $6,671,000.
A digital copy of the Contract documents is available free of charge and can be downloaded, see Attachments.
A hard copy of the Contract documents is available for purchase for $160.00 at the County of Santa Cruz Department of Public Works, Room 410, 701 Ocean Street, Santa Cruz, California. No partial sets will be issued.
The Bidder acknowledges they have reviewed the contract documents:
The Bidder understands and acknowledges the Bid must be submitted electronically in Opengov.
No scanned versions of the Bid will be accepted.
At bid opening, the Bidder must scan and upload the following required Proposal Forms found in Bid Book (Book 1 of 2) and as indicated in the Special Provisions and Notice to Bidders (Book 2 of 2) Section 2, as one PDF file.
No later than 4 p.m. on the 5th business day after bid opening, the Bidder must submit by mail the following Proposal Forms to the Contract Analyst. If the last day for submitting these bid form falls on a Saturday or holiday, it may be submitted on the next business day with the same effect as if it had been submitted on the day specified.
10 business days after bid opening, the Bidder must submit by mail the following Proposal Forms to the Contract Analyst;
Address mailing label:
Attn: Rosa Ortiz
County of Santa Cruz Department of Public Works
Bid Proposal for SAN LORENZO WAY BRIDGE REPLACEMENT, FEDERAL PROJECT No. BRLO-5936(086)
701 Ocean Street, Room 410
Santa Cruz, CA 95060
Address mailing label:
Attn: Rosa Ortiz
County of Santa Cruz Department of Public Works
Contract for SAN LORENZO WAY BRIDGE REPLACEMENT, FEDERAL PROJECT No. BRLO-5936(086)
701 Ocean Street, Room 410
Santa Cruz, CA 95060
Will this solicitation require a bid bond?
Would you like to have bidders respond to an electronic pricing table through ProcureNow?
Choose this if:
Will you want your bidder to upload a separate Price Proposal from the rest of the Response and not complete the pricing in the ProcureNow system?
Please enter the Federal Project ID number, if applicable to this solicitiation. If this project is not Federally Funded, please type "N/A".
How many working days are required for vendors to not bid more than for this project?
Use the following format: 70
What is the estimated cost of this project?
Use the following format: $659,809.25
How many trainees or apprentices are required for the Federal Training Program for this project?
Use the following format: 4
What is the fee to the vendor for a hard copy of the contract documents?
Use the following format: $65.00
Q (Plant Establishment Period): How long is the plant establishment period?
A: The project details (on Open Gov) state to complete plant establishment work within 120 days. The minimum bid of $60,000 is likely to be adjusted via addendum prior to bid opening (1 week prior to, or sooner).
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.