SLED Opportunity · FLORIDA · CITY OF PORT ST. LUCIE

    Sandblasting, Pressure Washing, Painting, Coatings Services

    Issued by City of Port St. Lucie
    cityIFBCity of Port St. LucieSol. 229807
    Closed
    STATUS
    Closed
    due Apr 7, 2026
    PUBLISHED
    Mar 9, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    238320
    AI-classified industry

    AI Summary

    City of Port St. Lucie seeks qualified contractors for an annual contract to provide sandblasting, pressure washing, painting, and protective coating services for water and wastewater facilities. The contract includes structural repairs and concrete protection using epoxy coatings.

    Opportunity details

    Solicitation No.
    229807
    Type / RFx
    IFB
    Status
    open
    Level
    city
    Published Date
    March 9, 2026
    Due Date
    April 7, 2026
    NAICS Code
    238320AI guide
    State
    Florida
    Agency
    City of Port St. Lucie

    Description

    The purpose of this solicitation is to obtain competitive pricing for qualified contractors in order to obtain an annual contract for general protective coating services for those facilities owned by the Utility Systems Department (USD). Those services would include, but not be limited to, structural repairs, concrete protection, and rehabilitation of water and wastewater piping, buildings, structures and tanks utilizing modified epoxy protective coatings and any related services as required by the USD.

    Contractor shall supply all labor, materials, tools/equipment and any other incidental item necessary to complete the services specified in each project that may be executed under this contract. The proposed price of the project shall provide full compensation to the vendor and shall include all elements of cost to perform and complete the work. No additional cost will be paid by the USD.

    The contractor shall provide rates that shall Include all labor rates for purposes of evaluating proposals that may be awarded contracts under this solicitation.

    Background

    The City of Port St. Lucie Utility Systems Department's operating, and capital budgets include funds for the purpose of general maintenance that includes contracted services for sandblasting, pressure washing, painting and the application of protective coating services.

    Project Details

    • Reference ID: 20260134
    • Department: Utility System
    • Department Head: Kevin Matyjaszek (Director)

    Important Dates

    • Questions Due: 2026-03-18T21:00:15.550Z
    • Answers Posted By: 2026-03-25T20:00:30.699Z
    • Pre-Proposal Meeting: 2026-03-30T14:00:00.000Z — Site Visit Location: Prineville WTP- 1001 SE Prineville Street, Port St. Lucie, FL 34983. Important: For the site visit (walk‑through), bidders are advised to check in with the receptionist in the lobby of Administration Building “A.” This visit will provide an opportunity to review existing conditions that may affect the delivery of goods and/or services, including factors related to equipment, materials, and labor. **Attendance at the site visit is strongly recommended**

    Addenda

    • Addendum #1 (released 2026-03-23T18:20:54.446Z) —

      Please use the See What Changed link to view all the changes made by this addendum. This Addendum is issued to include a non‑mandatory site visit as part of this solicitation.  

      March 30, 2026, 10:00am

      Site Visit Location: Prineville WTP- 1001 SE Prineville Street, Port St. Lucie, FL 34983.

      Important: For the site visit (walk‑through), bidders are advised to check in with the receptionist in the lobby of Administration Building “A.” This visit will provide an opportunity to review existing conditions that may affect the delivery of goods and/or services, including factors related to equipment, materials, and labor.

      **Attendance at the site visit is strongly recommended**

    Evaluation Criteria

    • Scope of Work

      1 Purpose

      The purpose of this Invitation for Bid (IFB) is to establish a term contract with a qualified and experienced Contractor for the purchase of general protective coating services for facilities owned and operated by the Utility Systems Department (USD), to be purchased as needed. Work under this Contract shall include, but not be limited to, structural repairs, concrete protection, and the rehabilitation of water and wastewater piping, buildings, structures, and tanks utilizing modified epoxy protective coatings.

      1.1 Description of Work

      The Contractor shall furnish all labor, materials, equipment, tools, transportation, and incidentals necessary to perform protective coating services as required by the USD. Project‑specific technical specifications will be issued by the USD for each assignment. Work may include, but is not limited to:

      • Surface preparation, including sandblasting and pressure washing

      • Application of protective coatings and paints

      • Structural repairs associated with coating rehabilitation

      • Concrete protection and restoration

      • Rehabilitation of water and wastewater process structures

      Primary work locations include USD Water Treatment Plants, Wastewater Treatment Plants, and remote pumping sites. Secondary locations include any additional facilities owned or operated by the USD. Typical facilities may include tanks, clarifiers, contact basins, digesters, headworks, grit chambers, containment units, and other water and wastewater processing structures.

      1.2 Performance Requirements

      All work performed under this Contract shall:

      • Comply with all applicable Federal, State, and Local codes and regulations

      • Conform to recognized industry standards and manufacturer recommendations

      • Utilize new materials that include full manufacturer warranties, transferable to the USD

      • Be completed in a professional and workmanlike manner

      The USD does not guarantee any minimum quantity of work or total expenditure under this Contract.

      1.3 Contractor Responsibilities

      The Contractor shall:

      • Provide all labor, materials, equipment, and incidentals required to complete each project

      • Ensure all personnel assigned to the work are trained and qualified for the tasks performed

      • Maintain a safe work environment in accordance with OSHA and applicable safety regulations

      • Coordinate work with USD staff to minimize disruption to facility operations

      All pricing submitted shall be all‑inclusive. No additional charges, fees, or surcharges shall be permitted.

      1.4 Pricing Requirements

      Bidders shall provide labor rates and any other required pricing information in the Bid Form included in this IFB. Pricing shall be used for evaluation and for issuance of work under the resulting Contract.

      A markup of 10% shall apply to equipment rentals and materials for all work authorized under the resulting Contract.

      1.5 Contractor Experience Requirements

      Provide documentation for five (5) similar projects involving protective coating services for water and wastewater utility facilities that your firm has completed within the past five (5) years. All information demonstrating your firm’s experience performing comparable work must be submitted in Section 12 by completing Item 1.1 (Contractor General Information Worksheet).

      1.6. Work Order Process

      As work needs arise, the City will coordinate with the Contractor to define the specific scope of work and project schedule. The contractor shall submit a written quotation that reflects the pricing determined through the evaluation of this Invitation for Bid (IFB). Upon approval, the City will issue a Task Order or Purchase Order that will serve as formal authorization to proceed.

      Each authorization will include:

      • Defined scope of work.
      • Approved pricing.
      • Project completion timeline.     

      Project Estimates 

      For each assigned project, the Contractor shall conduct a site inspection to evaluate existing conditions and determine the scope of required work. Within five (5) business days following the inspection, the Contractor shall submit a comprehensive written quote to the City representative that includes:

      • Labor estimates, based on rates provided in the approved Pricing bid.
      •  A complete description of all equipment, and materials based on markup provided in the approved Pricing bid.
      • A realistic project schedule, including anticipated start and completion dates.
    • IFB Introduction

      All the items described in this section are service levels and/or terms and conditions that the City expects to be satisfied by the selected Contractor.  Each Contractor must indicate its willingness and ability to satisfy these requirements in their response.

      Unless otherwise specified, references to brand name or trade name/mark products are intended to be descriptive, but not restrictive, and are used to indicate the quality and characteristics of products that may be offered. Other products may be considered for award if such products are clearly identified and are determined by the City to meet its needs in all respects. Each Contractor's response must indicate the brand name and model, or series number of the product offered and include such specifications, catalog pages, or other data that will provide an adequate basis for determining the quality and functional capabilities of the product offered.  

    • General Information and Instructions

      3.1.1 Familiarity with Laws and Regulations 

      It is the responsibility of responding Contractors to be familiar with all Federal, State, and local laws, ordinances, rules, and regulations, that may affect the work. Ignorance on the part of the Awarded Contractor will in no way relieve it from Contract responsibility.

      3.1.2 Restrictions on Communicating with Staff/ Cone of Silence

      From the issue date of this IFB until the time of City Council's approval of the award or the City Manager's approval when proposal amount is below the required formal solicitation threshold (or the IFB is officially canceled), Contractors are not allowed to communicate for any reason with any City staff or elected officials except through the Issuing Officer named herein, during the Bidders'/Offerors’ conference (if any), as defined in this IFB, or as provided by existing work agreement(s). This is commonly known as a Cone of Silence during the procurement process as identified in the City Code of Ordinances, Section 35.13. Prohibited communication includes all contact or interaction, including but not limited to, telephonic communications, emails, faxes, letters, or personal meetings, such as lunch, entertainment, or otherwise. The City reserves the right to reject the response of any Contractor violating this provision. Further information on this topic can be found on the Cone of Silence and IFB Communication Document.

      3.1.3 Submitting Questions

      All questions concerning this IFB must be submitted in writing on the OpenGov Platform during the Question and Answer open period. Please select the Question and Answer tab in the IFB project and click the "Ask Question" option. Once the question has been entered, select the "Submit Question" button. Enter a subject in the Subject field and then type the question in the Question field below. Once finished, select "Submit." No questions other than written will be accepted. No response other than written will be binding upon the City.  All Contractors must submit questions by the deadline identified in the Schedule of Events for submitting questions.  Contractors are cautioned that the City may or may not elect to entertain late questions or questions submitted by any other method than as directed by this section.

      3.1.4 Attending Bidders'/Offerors' Conference

      The Bidders'/Offerors’ Conference or any other information session (if indicated in the Schedule of Events) will be held at the locations referred to in “Schedule of Events,” of this IFB.  Unless indicated otherwise, attendance is not mandatory, although Contractors are strongly encouraged to attend. However, in the event the conference has been identified as mandatory, then a representative of the Contractor must attend the conference in its entirety to be considered eligible for Contract award. The Contractor is strongly encouraged to allow ample travel time to ensure arrival in the conference meeting room prior to the beginning of any mandatory conference. The City reserves the right to consider any representative arriving late to be “not in attendance.”  Therefore, all Contractors are strongly encouraged to arrive early to allow for unexpected travel contingencies.

      3.1.5 The City's Right to Request Additional Information- Contractor's Responsibility

      Prior to Contract award, the City must be assured that the selected Contractor has all the resources to successfully perform under the Contract. This includes, but is not limited to, adequate number of personnel with required skills, availability of appropriate equipment in sufficient quantity to meet the on-going needs of the City, financial resources sufficient to complete performance under the Contract, and experience in similar endeavors. If, during the evaluation process, the City is unable to assure itself of the Contractor’s ability to perform, if awarded, the City has the option of requesting from the Contractor any information deemed necessary to determine the Contractor’s responsibility. If such information is required, the Contractor will be notified and will be permitted approximately ten (10) business days to submit the information requested.

      3.1.6 Failing to Comply with Submission Instructions

      Responses received after the identified due date and time or submitted by any other means than those expressly permitted by the IFB will not be considered. Contractor's response must be complete in all respects, as required in each section of this IFB.

      3.1.7 Rejection of Proposals; The City's Right to Waive Immaterial Deviation

      The City reserves the right to reject any or all responses, to waive any irregularity or informality in a Contractor’s response, and to accept or reject any item or combination of items, when to do so would be to the advantage of the City. The City reserves the right to waive mandatory requirements, provided that, all the otherwise Responsive proposals failed to meet the mandatory requirements and/or doing so does not otherwise materially affect the procurement of requested commodities and/or services. It is also within the right of the City to reject responses that do not contain all elements and information requested in this IFB. A Contractor’s response will be rejected if the response contains any defect or irregularity and such defect or irregularity constitutes a Material Deviation from the IFB requirements, which determination will be made by the City in its sole discretion and on a case-by-case basis.

      NOTE:  The City reserves the right to reject the Bid of any Contractor who has previously failed in the performance of an award, to deliver contracts of a similar nature on time, or who is not in a position to perform properly under this award. This includes the firm, employees, and financial or legal interests.  The City will not enter into a contract or conduct business with any firm or any personnel that is listed on the Federal, State, or other local government agencies' Excluded Parties List, Suspended List, or Debarment List. Please see section 287.133, Florida Statutes, for further information regarding business transactions with companies that have been convicted of public entity crimes.

      3.1.8 The City's Right to Amend and/or Cancel the IFB

      The City reserves the right to amend this IFB. All revisions must be made in writing prior to the IFB closing date and time. If a responding entity discovers any ambiguity, conflict, discrepancy, omission, or other error in the IFB, it shall immediately notify the City of such error in writing and request modification or clarification of the document. Any modification made to this IFB will be issued as an addendum. If a responding entity fails to notify the City prior to the date and time fixed for submission of an error or ambiguity in the IFB known to it, or an error or ambiguity that reasonably should have been known to it, it shall not be entitled to additional time by reason of the error/ambiguity or its late resolution. By submitting a response, the Contractor shall be deemed to have accepted all terms and agreed to all requirements of the IFB (including any revisions/additions made in writing prior to the close of the IFB, whether or not such revision occurred prior to the time the Contractor submitted its response), unless expressly stated otherwise in the Contractor’s response. THEREFORE, EACH CONTRACTOR IS INDIVIDUALLY RESPONSIBLE FOR REVIEWING THE REVISED IFB AND MAKING ANY NECESSARY OR APPROPRIATE CHANGES AND/OR ADDITIONS TO THE CONTRACTOR’S RESPONSE PRIOR TO THE CLOSE OF THE IFB. All Notice(s) to Proceed with Negotiations and/or Notice of Intent to Award (NOIAs) will be posted as referenced in Section 9.8 - “Public Award Announcement,” of this document. Finally, the City reserves the right to amend or cancel this IFB at any time.

      3.1.9 Assigning of the Contract & Use of Subcontractors

      Except as may be expressly agreed to in writing by the City, Contractor shall not assign, sell, transfer, or otherwise dispose of the awarded Contract or any portion thereof, or of the work provided for therein, or of its right, title, or interest therein, to any person, firm, or corporation without the prior written consent of the City.

      Each Contractor shall list all subcontractors and the work provided by the suppliers in the area provided on the Bid Reply Sheet. The successful Contractor(s) shall provide a listing of all subcontractors, suppliers, and other persons and organizations (including those who are to furnish the principal items of material and equipment), other than those identified in the Bid Reply, to the City within ten (10) days after the bid opening. Such a list shall be accompanied by an experience statement for each such subcontractor, supplier, person, or organization, if requested by the City. The City, if after due investigation, has reasonable objection to any proposed subcontractor, supplier, other person or organization, the City may, before the Notice of Intent Award is given, request apparent successful Contractor to submit an acceptable substitute without an increase in Bid price.

      If the apparent successful Contractor(s) declines to make any such substitution, the City may award the Contract to the next acceptable Contractor(s) that proposes to use acceptable subcontractors, suppliers, and other persons and organizations. Declining to make requested substitutions will not constitute grounds for sacrificing the Bid security of any Contractor(s). Any subcontractor, supplier, other person, or organization listed and to whom the City does not make written objection prior to the giving of the Notice of Intent to Award, shall be deemed acceptable to City, subject to revocation of such acceptance after the effective date of the Contract.

      No subcontract which Contractor enters into with respect to performance of obligations or work assigned under the Contract shall in any way relieve Contractor of any responsibility, obligation, or liability under the Contract, and for the acts and omissions of all subcontractors, agents, and employees. All restrictions, obligations, and responsibilities of the Contractor under the Contract shall also apply to the subcontractors.  Any contract with a subcontractor must also preserve the rights of the City. The City shall have the right to request the removal of a subcontractor from performing work under the Contract at any time, with or without cause.

      3.1.10 Proposal of Additional Services

      If a Contractor indicates an offer of services in addition to those required by and described in this IFB, these additional services may be added to the original Contract at the sole discretion of the City.

      3.1.11 Protest Process

      Contractors should familiarize themselves with the procedures set forth in City Code of Ordinances, Section 35.15. By submitting a response to this IFB, the Contractor certifies that it is on notice of Section 35.15, understands the procedures set forth therein, and acknowledges it is bound by the protest process therein. 

      3.1.12 Costs for Preparing Responses

      Each Contractor’s response should be prepared simply and economically, avoiding the use of elaborate promotional materials beyond those sufficient to provide a complete presentation. The cost for developing the response and participating in the procurement process (including the protest process) is the sole responsibility of the Contractor. The City will not provide reimbursement for such costs.

      3.1.13 Public Access to Procurement Records

      Solicitation opportunities will be publicly advertised as required by City ordinances and state and federal laws. Any material that is submitted in response to this IFB, including anything considered by the Contractor to be confidential or a trade secret, will become a public document pursuant to Chapter 119, Florida Statutes. Any claim of confidentiality is waived upon submission, effective after the City’s opening of the proposals pursuant to section 119.07, Florida Statutes. Therefore, the Contractor is hereby cautioned NOT to submit any documents that the Contractor does not want to be made public. The City is allowed to assess a reasonable charge to defray the cost of reproducing documents. A City employee must be present during the time of onsite inspection of documents. PLEASE NOTE: Even though information (financial or other information) submitted by a Contractor may be marked as "confidential," "proprietary," etc., the City will make its own determination regarding what information may or may not be withheld from disclosure. Contractors should review Chapter 119, Florida Statutes for all updates before requesting exceptions from Chapter 119.

    • Bid Bond

      Each responding Contractor must supply a Bid Bond or Bid Deposit (certified check, cashier’s check, bank money order, bank draft of any national or state bank), in a sum of not less than TBD of the bid total made payable to the City. As a Mandatory Requirement, the Bid Bond or Bid Deposit must be scanned and uploaded as part of the Vendor Submission along with all other required documents, thus showing evidence that a Bid Bond or Bid Deposit was obtained. Responding Contractors must send the Original Bid Bond or Bid Deposit to the City within ten (10) business days after the IFB Due Date as reflected above in the Schedule of Events. The responding Contractor's proposal will be considered non-Responsive if the Bid Bond or Bid Deposit is not received within the specified time frame. Responding Contractors must submit a Bid Bond or Bid Deposit made payable to the City in a sealed envelope to:

      Max Previlon

      121 S.W. Port St. Lucie Blvd.

      Port St. Lucie, FL 34984

      Attn: Procurement Management Division

       

      Bonds must be issued by a Surety authorized to do business in the State of Florida, in order to guarantee that the Contractor will enter into a contract to deliver products and/or related services outlined in this solicitation, strictly within the terms and conditions stated in the Contract.

    • Indemnification/Hold Harmless

      Proposer agrees to indemnify, defend, and hold harmless, the City, its officers, agents, and employees from, and against any and all claims, actions, liabilities, losses, and expenses including, but not limited to, attorney's fees for personal, economic, or bodily injury, wrongful death, loss of or damage to property, at law or in equity, which may arise or may be alleged to have risen from the negligent acts, errors, omissions or other wrongful conduct of Proposer, agents, laborers, subcontractors or other personnel entity acting under Proposer control in connection with the Proposer's performance of services under the Contract. To that extent, Proposer shall pay any and all such claims and losses and shall pay any and all such costs and judgements which may issue from any lawsuits arising from such claims and losses including wrongful termination or allegations of discrimination or harassment, and shall pay all costs and attorney's fees expended by the City in defense of such claims and losses, including appeals. That the aforesaid hold-harmless agreement by Proposer shall apply to all damages and claims for damages of every kind suffered, or alleged to have been suffered, by reason of any of the aforesaid operations of Proposer or any agent laborers, subcontractors, or employee of Proposer regardless of whether or not such insurance policies shall have been determined to be applicable to any of such damages or claims for damages. Proposer shall be held responsible for any violation of laws, rules, regulations, or ordinances affecting in any way the conduct of all persons engaged in or the materials or methods used by Proposer on the work. This indemnification shall survive the termination of the Contract.

    • Administrative/Preliminary Review

      First, the proposals will be reviewed by the Issuing Officer to determine the proposal’s compliance with the following requirements:

      1. Response was submitted by the deadline.

      2. Response is complete and contains all required documents.   

    • General Pricing Rules

      By submitting a response, the Contractor agrees that it has read, understood, and will abide by the following instructions/rules:

      1. The submitted pricing must include all costs of performing pursuant to the resulting Contract; and

      2. All quantities and/or estimates are for information or tabulation purposes only; and

      3. No warranty or guarantee is expressed or implied on the volume of products and/or services that the City may require through the negotiated Contract period; and

      4. Bids containing a minimum order/ship quantity or dollar value, unless otherwise called for in the IFB, will be treated as non-Responsive and may not be considered for award; and

      5. The Contractor is required to provide net prices. In the event there is discrepancy between a Contractor’s unit price and extended price, the unit price shall govern; and

      6. In the event there is a discrepancy between (1) the Contractor’s pricing as quoted in Cost Table, and (2) the Contractor’s pricing as quoted by the Contractor in one or more single line entries directly into the Sourcing Event screen, the former shall govern; and

      7. The prices quoted and listed in the response shall be firm throughout the term of the resulting Contract, unless otherwise noted in the IFB or Contract; and

      8. Unless otherwise specified in any terms and conditions attached to the IFB, all product deliveries will be F.O.B. destination and all shipping charges must be included in the quoted pricing structure; and

      9. Unless expressly permitted by the IFB, responses containing provisions for late or interest charges cannot be awarded a Contract. Contractors must “strikethrough” any such provisions in printed forms and initial such revisions prior to submitting a response to the City; and

      10. Contractor responses requiring prepayment and/or progress payment requirements may be determined non-Responsive, unless otherwise permitted by the IFB; and

      11. Unless permitted by the IFB, responses requiring payment from the City in less than thirty (30) days will be considered non-Responsive.

    • Purpose of Procurement

      Pursuant to the City of Port St. Lucie Code of Ordinances, Section 35.07, this electronic Invitation for Bid (“IFB”) is being issued to establish a Contract with one qualified Contractor who will provide Sandblasting, Pressure Washing, Painting, Coatings Services to the City of Port St. Lucie (hereinafter, “City”) as further described in this IFB.

      A descriptive overview of the City can be found at https://www.cityofpsl.com/discover-us/about-psl . Please visit the City’s website to familiarize yourself with how our city is structured and operates. Please contact the Issuing Officer with any questions.

    • List of IFB Documents

      The following documents make up this IFB. Please see Section 3 – “Instructions to Contractors” for instructions and Section 12 - "Vendor Submission Requirements and Attestations" on how to access the following documents.  Any difficulty locating or accessing the following documents should be immediately reported to the Issuing Officer.

      1. Attachment A - Sample Contract

      4. Mandatory Documents - see requirements in Section 3 - "Instructions to Contractors," and the required attachments listed in Section 12 - "Vendor Submission Requirements and Attestations":

      • Contractor’s General Information Worksheet, and
      • E-Verify Form, and
      • Non-Collusion Affidavit, and
      • Supplier Location Certification (Local vendors Only), and
      • Lobbying Form, and
      • Copy of W-9 (Vendor to provide), and
      • Copy of Certificate of Insurance (Vendor to provide), and
      • Copy of your license(s) or certification(s) for this type of work; or in compliance with Chapter 489, Florida Statues, a copy of the certificate issues by the State of Florida (Vendor to provide), and

      Electronic confirmation for the following forms:

      • Cone of Silence and Communication Document, and
      • Contractor's Code of Ethics, and
      • Drug Free Workplace, and
      • Affidavit of Nongovernment Entity Anti-Human Trafficking Laws, and
      • Vendor Scrutinized Companies List Certification, and

      **Any documents indicated in Section 6.3 - "Mandatory Requirements," of this IFB must be uploaded into the project as a part of the response by the Contractor. Failure to supply the completed document(s) will deem the Contractor as Non-Responsive.

    • Submittal Instructions

      Submittal Instructions to Electronic Bidding System

      Listed below are key action items related to this IFB. The Schedule of Events Section identifies the dates and time for these key action items. This portion of the IFB provides high-level instructions regarding the process for reviewing the IFB, preparing a response to the IFB, and submitting a response to the IFB.

      3.2.1 IFB Released

      The release of the IFB is through the posting of this project in OpenGov, the City's electronic bidding system. Each Contractor interested in competing to win a Contract award must complete and submit a response to this IFB in OpenGov.  Therefore, each Contractor MUST carefully review the submittal instructions.

      3.2.2 IFB Review

      The IFB 20260134 consists of the following: this document, entitled “Sandblasting, Pressure Washing, Painting, Coatings Services,” and any and all information included in the IFB, as posted to OpenGov, including any and all documents provided by the City as attachments to the IFB or links contained within the IFB or its attached documents.

      Please carefully review all information, including all documents available as attachments or available through links.  Any difficulty accessing or opening provided links or documents should be reported immediately to the Issuing Officer.

      3.2.3 Preparing a Response

      When preparing a response, the Contractor must consider the following instructions:

      1. Use the provided Cost Table to prepare your response. Enter your responses directly into the Cost Table. Unless otherwise directed, do not insert “see attached file” (or similar statements) in the worksheet to reference separate documents.
      2. Answer each question in sufficient detail for evaluation while using judgment with regards to the length of response.
      3. Proofread your response and make sure it is accurate and readily understandable.
      4. Label any and all uploaded files using the corresponding section numbers of the IFB as specified by the City.
      5. Use caution in creating electronic files to be uploaded. If the City is unable to open an electronic file due to a virus or because the file has become corrupted, the Contractor’s response may be considered incomplete and disqualified from further consideration.
      6. Use commonly accepted software programs to create electronic files. The City has the capability of viewing documents submitted in the following formats: Microsoft Office and portable document format file (PDF). Unless the IFB specifically requests the use of another type of software or file format than those listed above, please contact the Issuing Officer, Max Previlon, prior to utilizing another type of software and/or file format. In the event that the City is unable to open an electronic file because the City does not have ready access to the software utilized by the Contractor, the Contractor’s response will be considered incomplete and disqualified from further consideration.

      3.2.4 Reviewing, Revising, or Withdrawing a Submitted Response

      After the response has been submitted, the Contractor may view and/or revise its response by logging into OpenGov. Please take note of the following:

      A. BID SUBMISSION. All bids shall be submitted by completing and uploading all required documents. All submittals are required to be electronic. No hard copies will be accepted.  

        • Cost Work Sheet will be completed through Cost Table in OpenGov.
        • Upload files in the following order (Provided in Section 12-Vendor Submission Requirements and Attestations): 
        1. Mandatory Forms:

      1.1 Contractor’s General Information Worksheet, and

      1.2 E-Verify Form, and

      1.3 Non-Collusion Affidavit, and

      1.4 Supplier Location Certification (Local vendors only), and

      1.5 Lobbying Form, and

      1.6 Copy of W-9 (Vendor to provide), and

      1.7 Copy of Certificate of Insurance (Vendor to provide), and

      1.8 Copy of your licenses(s) or certification(s) for this type of work; or in compliance with Chapter 489, Florida Statues, a copy of the certificate issues by the State of Florida (Vendor to provide), and

             2. Confirm electronically the following forms (Provided in Section 12-Vendor Submission Requirements and Attestations Section):

      2.1 Cone of Silence and Communication Document, and

      2.2 Contractor's Code of Ethics, and

      2.3 Drug Free Workplace, and

      2.4 Affidavit of Nongovernment Entity Anti-Human Trafficking Laws, and

      2.5 Vendor Scrutinized Companies List Certification, and

      B. REVIEW AND REVISE. Contractors may modify their submittal electronically via the City's electronic bidding system at any time prior to the scheduled due date and time for submission. In order to revise, the Contractor must navigate to their submitted response via the City's electronic bidding system and then click "Unsubmit Response." At this point, Contractor's response is no longer submitted. Contractor should make the changes required and promptly re-submit its response before the submission date and time.

      C. WITHDRAW.  Contractors may withdraw their submittal electronically via the Portal at any time prior to the scheduled due date and time for submission. In order to withdraw, the Contractor must navigate to their submitted proposal via the City's electronic bidding system and then click "Unsubmit Response". In the event a Contractor desires to withdraw its response after the closing date and time, the Contractor must submit a request in writing to the Issuing Officer.

       



    • Certification

      Proposal Certification

      By responding to this solicitation, the Contractor understands and agrees to the following:

      1. That this electronically submitted proposal constitutes an offer, which, when accepted in writing by the City, and subject to the terms and conditions of such acceptance, will constitute a valid and binding contract between the Contractor and the City; and

      2. That the Contractor guarantees and certifies that all items included in the Contractor's response meet or exceed any and all of the solicitation’s identified specifications and requirements, except as expressly stated otherwise in the Contractor's response; and

      3. That the response submitted by the Contractor shall be valid and held open for a period of one hundred and twenty (120) days from the final solicitation closing date and that the Contractor’s offer may be held open for a lengthier period subject to the Contractor’s consent; and

      4. That the Contractor's response is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a response for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. Contractor understands and agrees that collusive bidding is a violation of City ordinance and state and federal laws and can result in fines, prison sentences, and civil damage awards.

    • Method of Award

      Award of this Contract will be made to the lowest‑priced, responsive, and responsible Bidder in the aggregate who meets all required specifications and with whom the City has reached agreement on all Contract terms and conditions.

      The City will determine the Bidder for award by totaling the extended pricing for all line items. If a Bidder fails to submit pricing for all line items in the Solicitation, its Bid may be deemed non‑responsive.

    • Contractor's General Information

      Each Contractor must complete all the requested information in the Contractor’s General Information Worksheet in the Vendor Submission Requirements and Attestations Section.

    • Cost Structure and Additional Instructions

      The City’s intent is to structure the cost format in order to facilitate comparison among all Contractors and foster competition to obtain the best market pricing.  Consequently, the City requires that each Contractor's cost be structured as directed in the IFB.  Additional and/or alternative cost structures will not be considered. Each Contractor is cautioned that failure to comply with the instructions listed below, submission of an incomplete offer, or submission of an offer in a different format than the one requested, may result in the rejection of the Contractor's response.

      Enter all information directly into the Cost Table.  Enter numbers on each cost sheet in “number” (two-place decimal), not “currency” or other format, unless otherwise stated.  That is, omit dollar signs, commas, and any other non-essential symbols (e.g., $7.90 should be entered as 7.90). Prices must be in US Dollars.  Enter “n/a” to indicate not available or “0” if there is no charge. Cells left blank will be interpreted as “no offer.”

      Complete the Cost Table, save and submit in the response section. 

    • Workers’ Compensation Insurance & Employer’s Liability

      The Proposer shall agree to procure and maintain Workers' Compensation Insurance & Employers' Liability in accordance with Section 440, Florida Statutes. Employers’ Liability must include limits of at least $100,000.00 each accident, $100,000.00 each disease/ employee, and $500,000.00 each disease/maximum. A Waiver of Subrogation endorsement must be provided. Coverage shall apply on a primary basis. Should scope of work performed by Proposer qualify its employee(s) for benefits under Federal Workers’ Compensation Statute (for example, U.S. Longshore & Harbor Workers Act or Merchant Marine Act), proof of appropriate Federal Act coverage must be provided.

    • Mandatory Requirements

      As noted in the preceding section, this IFB contains mandatory requirements (e.g. product specifications, service or quality levels, staff requirements, experience or license requirements, etc.) which must be met by the Contractor in order to be considered Responsive, and, therefore, eligible for Contract award. These mandatory requirements will be defined in one or more of the following ways:

      1. Requirements in this IFB document.

      2. Requirements contained in any attachment to the Sourcing Event, including any Mandatory Forms, Electronic Acknowledgements, and Cost Table.

      3. Copy of Current Insurance Certificate, Licenses, required Certifications, References, etc.

      A Pass/Fail evaluation will be utilized for all mandatory requirements. Please review the Sourcing Event and its attachments carefully and respond as directed.

      Some requirements may require a "Yes" or "No" response. Ordinarily, to be considered Responsive, Responsible, and eligible for award, all requirements identified as mandatory must be marked "Yes" to pass. There may be rare instances in which a response of "NO" is the correct and logical response in order to meet the mandatory requirements (e.g., responding "NO" that the Contractor does not possess any conflicts of interest). Otherwise, any mandatory questions marked "NO" will fail the technical requirements and will result in disqualification of the Contractor's response, except as otherwise provided in Section 9 - "Evaluation and Award," of this IFB. Please note some requirements may require the Contractor to provide product sheets or other technical materials.

      It is strongly encouraged that all Contractors review all documents that are electronically attached to this IFB. Reviewing the documentation ensured that Contractors understand the full scope of the City's request.

    • Commercial General Liability Insurance

      The Proposer shall agree to procure and maintain Commercial General Liability insurance, issued under an Occurrence form basis, including Contractual liability, to cover the hold harmless agreement set forth herein, with limits of not less than:

      Each occurrence$1,000,000
      Personal/advertising injury$1,000,000
      Products/completed operations aggregate$2,000,000
      General aggregate$2,000,000
      Fire damage$100,000 any 1 fire
      Medical expense$10,000 any 1 person

       

    • Overview of the IFB Process

      The objective of the IFB is to select one (1) qualified Contractor (as defined by Section 1 – “Purpose of Procurement”) to provide the goods and/or services outlined in this IFB to the City.  This IFB process will be conducted to gather and evaluate responses from Contractors for potential award. All qualified Contractors are invited to participate by submitting responses, as further defined below. After evaluating all Contractor’s responses received prior to the closing date of this IFB and resolution of any Contract exceptions, the preliminary results of the IFB process will be publicly announced, including the names of all participating Contractors and the evaluation results.  Subject to the protest process, final Contract award(s) will be publicly announced thereafter.

      NOTE TO CONTRACTORS:  The general instructions and provisions of this document have been drafted with the expectation that the City may desire to make one award or multiple awards.  For example, this document contains phrases such as “contract(s)” and “award(s)”.  Please refer to Section 1 – “Purpose of Procurement” and Section 9 – “Evaluation and Award,” for information concerning the number of Contract awards expected.

    • Best Value Analysis - See City Code of Ordinances, Section 35.12.

      The following criteria will be used to select the bid that will provide the best value to the City:

      • Skill, workmanship, experience, and past performance demonstrated by the bidder or proposer in performing the same type of work or services as those sought by the City, or the experience, expertise and quality of services demonstrated by the bidder or proposer for professional, consulting and other services;
      • Ability to meet the minimum qualifications or requirements of the solicitation;
      • Adherence to specifications, design, or the approach to the project or study, as applicable;
      • The Bidder's capacity to perform in terms of personnel, equipment, facilities, licensing, and ability to meet time requirements and schedules; 
      • The Bidder's capacity to perform in terms of financial viability, ability to provide required insurance and business tax receipts, and bonding capacity, if applicable; 
      • Prices, costs, or rates in relation to the goods, supplies, materials, equipment or services sought to be procured, except as provided by Consultant's Competitive Negotiation Act (CCNA), as applicable. Lowest price is not the sole determining factor of best value; 
      • Life cycle costs of the goods, supplies, materials, equipment or services to be procured; 
      • Any other factor specific to the particular solicitation that is specifically described in the procurement solicitation document; 
      • City Code of Ordinances, Section 35.14, Local Preference in Purchasing or Contracting;
      • The total cost of ownership of the products or services and their impact on the City's budget in future years.

      The element of price is but one of the criteria elements. When considering a proposal, the City will: 

      • Evaluate the pricing offered by the Bidder; consider lifecycle costing, depreciation, and service contracts. 
      • Determine what proposal provides the best value to the City. 

      Value Added: The amount or dollar value of a service that the Bidder may be able to provide the City: 

      • Value added may be an actual amount given to the City as a signing bonus. 
      • Value added may be equipment or services given to the City. In this case, the value will be determined by the City for the goods or services, not the Bidder. 

      Any prior conviction for bribery, theft, forgery, embezzlement, falsification, or destruction of records, antitrust violations, honest services fraud or other offenses indicating a lack of business integrity or honesty; or any prior violation of the City’s ethical standards may be considered when determining best value and may result in a Contractor not being awarded the project.

    • Payment and Performance Bonds

      By responding to this solicitation, the Contractor understands and agrees to the following:

      1. The Contractor shall furnish an acceptable recorded Performance and Payment Bond complying with the statutory requirements set forth in section 255.05, Florida Statutes, and 2 CFR 200.326 in the amount equal to one hundred percent (100%) of the Contract price. Additionally, upon any Contract price increase, Contractor shall obtain a bond rider to ensure that the Performance and Payment Bond never drops below 100% of the Contract Price. For clarity, this means that if there is any amendment, change order, purchase order, or any other approval for additional funds under the Contract, Contractor shall obtain a bond rider covering 100% of the increase. The bond shall be issued by a Corporate Surety authorized to do business with the State of Florida. The performance bond/letter of credit must be submitted to the City within ten (10) calendar days of the date the Contract is approved by City Council or the City Manager (if within his or her threshold), but in any event, prior to the beginning of any Contract performance by the awarded Contractor. The Performance and Payment Bond shall remain in full force and effect a minimum of one (1) year after the work has been completed and final acceptance of the work is issued by the City.
      2. Should the Surety become irresponsible during the time the Contract is in force, the City may require additional and sufficient sureties and the Contractor shall furnish same to the satisfaction of the City within ten (10) calendar days after written notice to do so. In default thereof, the Contractor may be suspended as herein provided.
    • Payment by City's Visa Card Program

      The City currently utilizes the State of Florida Visa Program. The awarded Contractor can take advantage of this program and in consideration, may receive payment within several days instead of NET 30 terms. Any percentage off the quoted bid price for the acceptance of payment by Visa will be taken into the account for consideration of the best value to the City. If no percentage is provided in the cost proposal, the City shall assume a zero (0) percent discount applies.

    • Security Deposit

      The Proposer must pay a cash security deposit or provide an irrevocable letter of credit in the amount of not less than five percent (5%) of the total contract award. The cash security deposit or irrevocable letter of credit shall be returned to the Contractor upon faithful performance and completion of this agreed upon contract. However, should Contractor fail to meet the terms and conditions for which the cash security deposit or irrevocable letter of credit are intended to secure, then the City shall be entitled to demand payment from the lending institution or shall be entitled to retain all, or such portion of the cash security deposit as is required to meet the obligations of the contract.

    • Schedule of Events

      The Schedule of Events set out herein represents the City’s best estimate of the schedule that will be followed. However, delays to the procurement process may occur, which may necessitate adjustments to the proposed schedule.  If a component of this schedule, such as the close date, is delayed, the rest of the schedule may be shifted as appropriate. Any changes to the dates up to the closing date of the IFB will be publicly posted prior to the closing date of this IFB. After the close of the IFB, the City reserves the right to adjust the remainder of the proposed dates, including the dates for evaluation, negotiations, award, and the Contract term, on an as-needed basis, with or without notice.

      Release of IFB:March 9, 2026
      Pre-Proposal Meeting (Non-Mandatory):March 30, 2026, 10:00am

      Site Visit Location: Prineville WTP- 1001 SE Prineville Street, Port St. Lucie, FL 34983.

      Important: For the site visit (walk‑through), bidders are advised to check in with the receptionist in the lobby of Administration Building “A.” This visit will provide an opportunity to review existing conditions that may affect the delivery of goods and/or services, including factors related to equipment, materials, and labor.

      **Attendance at the site visit is strongly recommended**

      Question Submission Deadline:March 18, 2026, 5:00pm
      Question Response Deadline:March 25, 2026, 4:00pm
      Response Submission Deadline:April 7, 2026, 3:30pm

      Microsoft Teams meeting
      https://teams.microsoft.com/meet/22516351199254?p=Ve1DYUU4Rw5sJGGS7w

      Meeting ID: 225 163 511 992 54
      Passcode: uF6DU74y

      Dial in by phone
      +1 561-437-3554,
      Find a local number
      Phone conference ID: 805 898 290#

       

      The City reserves the right to proceed to award without further discussions after receipt of the initial proposals, in which case, evaluation committee reviews, negotiations, and proposal revisions may not be required.

    • Additional Insured

      An Additional Insured endorsement must be attached to the certificate of insurance (should be CG2026) under the General Liability policy. Coverage is to be written on an occurrence form basis and shall apply as primary and non-contributory. Defense costs are to be in addition to the limit of liability. A waiver of subrogation is to be provided in favor of the City.  Coverage shall extend to independent consultants and fellow employees. Contractual Liability is to be included. Coverage is to include a cross liability or severability of interests provision as provided under the standard ISO form separation of insurers clause.

      Except as to Workers' Compensation and Employers' Liability insurance, Certificates of Insurance and policies shall clearly state that coverage required by the Contract has been endorsed to include the City of Port St. Lucie, a municipality of the State of Florida, its officers, agents and employees as Additional Insured for Commercial General Liability and Business Auto Liability policies.  The name for the Additional Insured endorsement issued by the insurer shall read: "City of Port St. Lucie, a municipality of the State of Florida, its officers, employees and agents shall be listed as additional insured and include Contract# 20260134 – Sandblasting, Pressure Washing, Painting, Coatings Service” Copies of the Additional Insured endorsements shall be attached to the Certificate of Insurance. The policies shall be specifically endorsed to provide thirty (30) days written notice to the City prior to any adverse changes, cancellation, or non-renewal of coverage thereunder. Formal written notice shall be sent to City of Port St. Lucie, 121 SW Port St. Lucie Blvd., Port St. Lucie, FL 34984, Attn:  Procurement.  In the event that the statutory liability of the City is amended during the term of this Contract to exceed the above limits, the Contractor shall be required, upon thirty (30) days written notice by the City, to provide coverage at least equal to the amended statutory limit of liability of the City.  Copies of the Additional Insured endorsement shall be attached to the Certificate of Insurance. 

    • Evaluating Bid Factors

      If the Contractor’s response passes the Administrative/Preliminary Review, the Contractor’s responses to Section 6 - “IFB Bid Factors,” will be evaluated. Responses to mandatory requirements will be evaluated on a pass/fail basis.  If a response fails to meet a mandatory requirement, the City will determine if the deviation is Material. A Material Deviation will be cause for rejection of the response. An Immaterial Deviation will be processed as if no deviation had occurred.

    • Business Automobile Liability Insurance

      The Proposer shall agree to maintain Business Automobile Liability at a limit of liability not less than $1,000,000.00 each accident covering any auto, owned, non-owned and hired automobiles. In the event the Proposer does not own any automobiles, the Business Auto Liability requirement shall be amended allowing the Proposer to agree to maintain only Hired & Non-Owned Auto Liability. This amended requirement may be satisfied by way of endorsement to the Commercial General Liability, or separate Business Auto Coverage form. Certificate holder must be listed as additional insured. A waiver of subrogation shall be provided. Coverage shall apply on a primary and non-contributory basis.

    • Permits

      The selected Contractor shall be responsible for obtaining all permits, licenses, certifications, etc., required by federal, state, county, and municipal laws, regulations, codes, and ordinances for the performance of the work required in these specifications and to conform to the requirements of said legislation. Permit fees can be found on the City’s Building Department Website. All permit fees shall be included in the Contract amount and paid by the successful Contractor(s).

    • Payment

      To ensure proper payment the awarded Contractor must comply with the following:

      1. The City shall have not less than thirty (30) days to pay for any products and/or services.

      2. Invoices must clearly show the description of products and/or services to include the number of each product or line item fulfilled.

      3. All invoices must reference the Contract Number as established by the City.

      4. Under no circumstance, will interest of any kind be required as payment to the Awarded Contractor.

      5. All charges, e.g., set up costs, must be included in the cost proposal. No charges will be allowed unless specified in the IFB and agreed upon by the City.

      6. Any discrepancies noted by the City must be corrected by the Awarded Contractor within forty-eight (48) hours.

      7. The payment amount due on invoices shall not be altered by the City personnel. Once disputed items are resolved, the Awarded Contractor must submit an amended invoice, or a credit memorandum for the disputed amount.

      8. The City will not make partial payments on an invoice where there is a dispute, except as required by law.

      9. The City will only make payments on authorized transactions.

      10. All invoices must be sent to: The Project Manager.

       
    • Official Issuing Officer (Procuring Agent)

      Max Previlon, CPPB / Procurement Contracting Officer III

      772-871-5224

      mprevilon@cityofpsl.com

    • Definition of Terms

      Please review the following terms:

      - Contractor(s) – companies desiring to do business with the City (Also called “Bidder,” “Proposer,” or “Offeror.”)

      - City of Port St. Lucie (“City”) – the governmental entity identified in “Purpose of Procurement,” of this IFB.

      - Immaterial Deviation – does not give the Contractor a substantial advantage over other Contractors.

      - Material Deviation – gives the Contractor a substantial advantage over other Contractors and thereby restricts or prevents competition.

      - Procurement Management Division (“PMD”) – the City department that is responsible for the review and possible sourcing of all publicly sourced solicitations.

      - Responsible – means the Contractor, whether a company or an individual, has appropriate legal authority to do business in the City, a satisfactory record of integrity, appropriate financial, organizational, and operational capacity and controls, and acceptable performance on previous governmental and/or private contracts, if any.

      - Responsive – means the Contractor whether a company or an individual, has submitted a timely offer which materially conforms to the requirements and specifications of the solicitation.

      - Sourcing Platform – OpenGov.

      Any special terms or words which are not identified in this IFB may be identified separately in one or more attachments to the IFB.

    • Performance and Payment Bonds:

      Performance and Payment Bonds will be required where specific requirements exceed certain thresholds. Please see Sample Contract for further elaboration.

    • Waiver of Subrogation

      By entering into this Contract, the Proposer agrees to a Waiver of Subrogation for each required policy. When required by the insurer, or should a policy condition not permit an Insured to enter into a pre-loss Contract to waive subrogation without an endorsement then the Vendor shall agree to notify the insurer and request the policy be endorsed with a Waiver of Transfer of Rights of Recovery Against Others, or its equivalent. This Waiver of Subrogation requirement shall not apply to any policy where a condition to the policy specifically prohibits such an endorsement, or voids coverage should Proposer enter into such a Contract on a pre-loss basis.

    • City’s Reserved Rights and Contractual Discretion

      The City reserves the right to: (a) waive minor irregularities, variances, or non‑material defects in a response; (b) reject any and all responses, in whole or in part; (c) request clarifications from Proposers; (d) request resubmissions from all Proposers; and (e) take any other action as permitted by law. The City also reserves the right to obtain similar and/or additional services from other companies if deemed necessary. If the City elects to exercise this right, the Contract awarded under this solicitation shall remain in effect for all terms, agreements, and conditions without penalty or diminution of ongoing services.

      Proposer acknowledges and agrees that any Contract awarded pursuant to this solicitation shall not be construed as an exclusive arrangement, and further agrees that the City may, at any time, secure similar or identical services from other providers.

    • Additional Information

      Please access and review all the attachments provided by the City within the Project.  If supplemental materials are requested by the City to be submitted by the Contractor as part of the technical proposal, the Contractor should upload these additional materials as directed by the City.

    • Deductibles

      All deductible amounts shall be paid for and be the responsibility of the Proposer for any and all claims under this Contract. Where an SIR or deductible exceeds $5,000, the City reserves the right, but is not obligated, to review and request a copy of the bidder’s most recent annual report or audited financial statement.

    • Contract Term

      The Initial term of the contract(s) is for three (3) calendar years from the execution date . The City shall have two (2), one (1)-year option(s) to renew, which options shall be exercisable at the sole discretion of the City. Renewal(s), if provided and selected solely by the City, will be accomplished through the issuance of Contract Amendment.

      In the event that the Contract(s), if any, resulting from the award of this IFB shall terminate or be likely to terminate prior to the making of an award for a new Contract for the identified products and/or services, the City may, with the written consent of the awarded Contractor(s), extend the Contract(s) for such period of time as may be necessary to permit the City’s continued supply of the identified products and/or services.  The Contract(s) may be amended in writing from time to time by mutual consent of the parties.  Unless this IFB states otherwise, the resulting award of the Contract(s) does not guarantee volume or a commitment of funds.

      1.6.1 Hours of Service

      The standard hours of work allowed in the City’s rights-of-way are from 7:00 a.m. to sundown Monday through Friday.  Any work performed by the Contractor outside of the aforementioned time limit requires special authorization by the City and requires that the Contractor obtain a noise permit from the Port St. Lucie Police Department (PSLPD).  All equipment operated at night shall comply with the noise levels established by the City of Port St. Lucie noise ordinance.  Any additional costs associated with work outside of the hours of work allowed shall be borne by the Contractor.  This shall include, but is not limited to, costs of inspection, testing, police assistance, and construction administration.

      All night, Saturday, Sunday, and/or Holiday work must be authorized by the City and requires that the Contractor obtain a noise permit from the PSLPD.  All night work within the City’s rights-of-way requires a minimum forty-eight (48) hour prior notice to the City.  This clause shall not pertain to crews organized to perform maintenance work on equipment or to operate and maintain special equipment such as dewatering pumps, which may be required to work twenty-four (24) hours per day.     

    • Selection and Award - Single Preferred but Split -Award Possible

      The City reserves the right to: (a) waive minor irregularities, variances, or non-material defects in a response; (b) reject any and all responses, in whole or in part; (c) request clarifications from all Contractors; (d) request resubmissions from all Contractors; (e) award in whole, in part; or by line item; and (f) take any other action as permitted by law. The City reserves the right to provide for similar and/or additional services from other companies if the City so deems necessary. If the City elects to exercise this right, the Contract awarded under this solicitation shall remain in effect as for to all terms, agreements, and conditions without penalty or diminution of ongoing services to the City as contained therein. Proposer agrees and understands that any Contract awarded pursuant to this solicitation shall not be construed as an exclusive arrangement and further agrees that the City may, at any time, secure similar or identical services, or award more than one Contract under this solicitation, at its sole option.

      Single Preferred but Split Award

      The primary intent of this IFB is to identify a single source (Responsive and Responsible Contractor with the best value as evaluated in Section - "Evaluating Bid Factors") to provide all the needed goods and/or services; however, the City reserves the right to make split awards.

    • Compliance

      It shall be the responsibility of the Proposer to ensure that all independent contractors and/or subcontractors comply with the same insurance requirements referenced herein.  It shall be the responsibility of the Proposer to obtain Certificates of Insurance from all independent contractors and subcontractors listing the City as an Additional Insured without the language “when required by written contract”.  If the Proposer, independent contractor and/or subconsultant maintain higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Proposer/independent contractor/subcontractor.

      The Proposer may satisfy the minimum limits required above for either Commercial General Liability, Business Auto Liability, and Employers’ Liability coverage under Umbrella or Excess Liability.  The Umbrella or Excess Liability shall have an Aggregate limit not less than the highest "Each Occurrence" limit for either Commercial General Liability, Business Auto Liability, or Employers’ Liability.  When required by the insurer, or when Umbrella or Excess Liability is written on Non-Follow Form, the City shall be endorsed as an "Additional Insured."

      The City by and through its Risk Management Department reserves the right, but is not obligated, to review, modify, reject or accept any required policies of insurance, including limits, coverages or endorsements, herein from time to time throughout the term of this Contract. All insurance carriers must have an AM Best rating of at least A:VII or better.

      A failure on the part of the Proposer to execute the contract and/or punctually deliver the required insurance certificates and other documentation may be cause for annulment of the award.

    • Selection and Award- Primary/Secondary Award

      The City reserves the right to: (a) waive minor irregularities, variances, or non-material defects in a response; (b) reject any and all responses, in whole or in part; (c) request clarifications from all Contractors; (d) request resubmissions from all Contractors; (e) award in whole, in part; or by line item; and (f) take any other action as permitted by law. The City reserves the right to provide for similar and/or additional services from other companies if the City so deems necessary. If the City elects to exercise this right, the Contract awarded under this solicitation shall remain in effect as for to all terms, agreements, and conditions without penalty or diminution of ongoing services to the City as contained therein. Proposer agrees and understands that any Contract awarded pursuant to this solicitation shall not be construed as an exclusive arrangement and further agrees that the City may, at any time, secure similar or identical services, or award more than one Contract under this solicitation, at its sole option.

      Primary/Secondary Award

      The primary intent of this IFB is to identify a single source (Responsible and Responsive Contractor with the best value as evaluated in Section - "Evaluating Bid Factors") to provide all of the needed goods and/or services; however, the City reserves the right to make an additional Contract award to the next best ranked Contractor as a secondary (back-up) source of supply.

    • Pollution Insurance

      Contractor shall procure and agree to maintain in full force during the term of this Contract, Contractors Pollution Liability Insurance in limits not less than $1,000,000 per occurrence and $2,000,000 aggregate, for any operations relating to the construction, handling, storage, and transportation of hazardous materials and/or waste. Contractors Pollution should be in force for no less than the entire term of the project and two years extended Completed Operations. The City of Port St. Lucie shall be listed as an additional insured. A waiver of subrogation shall be provided in favor of the City. Coverage shall apply on a primary and non-contributory basis.

    • Crime Insurance

      Proposer shall procure and agree to maintain Crime Insurance in limits not less $1,000,000 per loss for employee theft, theft of monies and securities, forgery or alteration, and funds transfer fraud. The City of Port St. Lucie must be listed as an additional insured. A waiver of subrogation shall be provided in favor of the City. Coverage shall apply on a primary and non-contributory basis.

      Employee Theft-Per Loss Coverage: $1,000,000

      Forgery or Alteration: $1,000,000

      Money & Securities-Inside: $ 100,000

      Robbery, Safe Burglary of other Property-Inside: $ 100,000

      Computer Fraud: $1,000,000

      Funds Transfer Fraud: $1,000,000

      Money Orders & Counterfeit Paper Currency: $1,000,000

    • Selection and Award- Multi-Award

      The City reserves the right to: (a) waive minor irregularities, variances, or non-material defects in a response; (b) reject any and all responses, in whole or in part; (c) request clarifications from all Contractors; (d) request resubmissions from all Contractors; (e) award in whole, in part; or by line item; and (f) take any other action as permitted by law. The City reserves the right to provide for similar and/or additional services from other companies if the City so deems necessary. If the City elects to exercise this right, the Contract awarded under this solicitation shall remain in effect as for to all terms, agreements, and conditions without penalty or diminution of ongoing services to the City as contained therein. Proposer agrees and understands that any Contract awarded pursuant to this solicitation shall not be construed as an exclusive arrangement and further agrees that the City may, at any time, secure similar or identical services, or award more than one Contract under this solicitation, at its sole option.

      Single or Multiple Award

      Any Contract award(s) resulting from the IFB will be made to the Responsive and Responsible Contractor(s) that exhibit the best value as evaluated in Section 6 - "Evaluating Bid Factors," that meet all required specifications, and with whom the City has reached agreement on all Contract terms and conditions. The City reserves the right to select one or more Contractors for award and to award all items to one or more Contractors, individual line items to one or more Contractors, or subcategories of product/services to one or more Contractors, when to do so is in the best interests of the City.

    • Cyber Liability Insurance

      Proposer shall agree to maintain Cyber Liability in limits not less $1,000,000 Per Occurrence for direct loss, legal liability, and consequential loss resulting from cyber security breaches.  Coverage to include coverage for Privacy & Security Liability, Security Breach Response / Customer Breach Notice Expense, Cyber Extortion and Electronic Media Liability.  The City of Port St. Lucie must be listed as an additional insured. A waiver of subrogation shall be provided in favor of the City. Coverage shall apply on a primary and non-contributory basis.

    • Local Preference in Purchasing or Contracting (City Code of Ordinances, Section 35.14)*

      Except where otherwise provided by federal or state law, other funding source restrictions, or as otherwise set forth in the purchasing policy, the City shall give preference to local businesses in the following manner:

      1. In purchasing of, or letting of contracts for procurement of, personal property, materials, contractual services, and construction of improvements to real property or existing structures for which a request    

      for proposals is developed with evaluation criteria, a local preference of the total score may be assigned as follows:

        1. Local Businesses which meet all the criteria for a Local Business as set forth in this section (City Code of Ordinances, Section 35.14), shall be given a preference in the amount of five percent (5%) of the total score of the Local Business.

        2. The City Procurement Management Division shall have the sole discretion to determine if a Contractor meets the definition of a "Local Business."

      2. Limitations

        1. The provisions of this section shall apply only to procurements which are above the formal bid threshold as set forth in the City Code and the City of Port St. Lucie Procurement Manual. 

        2. The provisions of this section shall not apply where prohibited by Federal or Florida law or where prohibited under the conditions of any grant. 

        3. The provisions of this ordinance shall not apply to any purchase exempted from the provisions of the City of Port St. Lucie Procurement Manual.  

        4. The provisions of this ordinance shall not apply to contracts made under the Consultants Competitive Negotiation Act (CCNA), Section 287.55, Florida Statutes.

        5. The provisions of this section shall not apply to any procurement where the local nature of a business has been addressed through the scoring criteria.

      * Please review City Code of Ordinances, Section 35.14, for the full governing ordinance.

    • Dram Shop Liability Insurance

      Proposer shall maintain and prior to commencement of this Contract, provide the City with evidence to cover Dram Shop Liability for the serving and selling of intoxicating beverages with limits of $1,000,000 per occurrence. City shall be listed as an Additional insured. Waiver of Subrogation is NOT required for this Contract.

    • Site Visits, Samples, and Oral Presentations

      The City reserves the right to conduct site visits, request product/work samples, or to invite Contractors to present their product(s) and or service solutions to the evaluation team. Unless prohibited by federal, state, county, or local laws and/or ordinances, all Contractor requested presentations shall be performed in an in-person meeting. An oral presentation or product demonstration is not a negotiation and Contractors are not permitted to revise their responses as part of the presentation and/or demonstration.  Samples of items, when required, must be furnished free of expense and, if not destroyed, will upon request, be returned at the Contractor’s expense. Request for the return of samples must be made within thirty (30) days following opening of bids. Each individual sample must be labeled with Contractor’s name, bid number, and item number. Failure of Contractor to either deliver required samples or to clearly identify samples as indicated may be reason for rejection of the bid. Unless otherwise indicated, samples should be delivered to the Procurement Management Division.

    • Garage Keepers’ Liability Insurance

      Proposer shall agree to maintain Garage Keepers’ Liability Insurance at a limit of liability not less than $2,000,000 per location.  The City of Port St. Lucie must be listed as an additional insured. A waiver of subrogation shall be provided in favor of the City. Coverage shall apply on a primary and non-contributory basis.

    • Garage Liability Insurance

      Proposer shall agree to maintain Garage Liability Insurance at a limit of liability not less than $1,000,000 per location. The City of Port St. Lucie must be listed as an additional insured.  A waiver of subrogation shall be provided in favor of the City. Coverage shall apply on a primary and non-contributory basis.

    • Public Award Announcement

      The preliminary results of the evaluation will be announced through the public posting of a Notice of Intent to Award (“NOIA”) on the Electronic Bidding System. The NOIA is not notice of an actual Contract award; instead, the NOIA is notice of the City’s expected Contract award(s) pending resolution of the protest process period, pursuant to City Code of Ordinances, Section 35.15, and final approval by the City Council at a publicly noticed meeting. The NOIA (if any) will identify the apparent successful Contractor(s) and unsuccessful Contractor(s). NO CONTRACTOR SHOULD ASSUME PERSONAL NOTICE OF THE NOIA WILL BE PROVIDED BY THE CITY. INSTEAD, ALL CONTRACTORS SHOULD FREQUENTLY CHECK THE ELECTRONIC BIDDING SYSTEM FOR NOTICE OF THE NOIA. 

    • Pollution Insurance

      Proposer shall procure and agree to maintain in full force during the term of this Contract, Pollution Liability Insurance in limits not less than $1,000,000 per occurrence and $2,000,000 aggregate, for any operations relating to the handling, storage, and transportation of hazardous materials and/or waste. The City of Port St. Lucie shall be listed as an additional insured. A waiver of subrogation shall be provided in favor of the City. Coverage shall apply on a primary and non-contributory basis.

    • Pollution Insurance

      Contractor shall procure and agree to maintain in full force during the term of this Contract, Contractors Pollution Liability Insurance in limits not less than $1,000,000 per occurrence and $2,000,000 aggregate, for any operations relating to the construction, handling, storage, and transportation of hazardous materials and/or waste. Contractors Pollution should be in force for no less than the entire term of the project and two years extended Completed Operations. The City of Port St. Lucie shall be listed as an additional insured. A waiver of subrogation shall be provided in favor of the City. Coverage shall apply on a primary and non-contributory basis.

    • Professional Liability Insurance

      Proposer shall agree to maintain Professional Liability, or equivalent Errors & Omissions Liability, at a limit of liability not less than $2,000,000 Per Occurrence. When a self-insured retention (SIR) or deductible exceeds $10,000, the City reserves the right, but is not obligated, to review and request a copy of Proposer’s most recent annual report or audited financial statement. For policies written on a “Claims-Made” basis, Proposer warrants that the retroactive date equals or precedes the effective date of this Contract. In the event the policy is canceled, non-renewed, switched to an Occurrence Form, retroactive date advanced, or any other event triggering the right to purchase a Supplemental Extended Reporting Period (SERP) during the life of this Contract, Proposer shall agree to purchase a SERP with a minimum reporting period not less than four (4) years. If policy contains an exclusion for dishonest or criminal acts, defense coverage for the same shall be provided.

    • Property Insurance

      Depending on terms of agreement, this language can vary.  The City could be responsible for the property, or the contractor, lessee, or vendor could be responsible.

    • Requirements for Insurance

      Within ten (10) business days of award, the awarded Proposer must procure the required insurance and provide the City with an executed Certificate of Insurance. Certificates must reference the contract number and the City as the Additional Insured party, as identified herein. The Proposer’s submitted pricing must include the cost of the required insurance. No contract performance shall occur unless and until the required insurance certificates and endorsements are provided.

    Submission Requirements

    • Mandatory Forms
    • Contractor's General Information Worksheet (required)

      It is understood and agreed that the following information is to be used by the City to determine the qualifications of prospective Contractor to perform the work required. The Contractor waives any claim against the City that might arise with respect to any decision concerning the qualifications of the Contractor.

      The undersigned attests to the truth and accuracy of all statements made on this questionnaire. Also, the undersigned hereby authorizes any public official, Engineer, Surety, bank, material or equipment manufacturer, or distributor, or any person, firm or corporation to furnish the City any pertinent information requested by the City deemed necessary to verify the information on this questionnaire.

      Please download the below documents, complete, and upload.

    • E-Verify Form (required)

      Please download the below documents, complete, and upload.

    • Non-Collusion Affidavit (required)

      Please download the below documents, complete, and upload.

    • Supplier Location Certification

      Please download the below documents, complete, and upload.

    • Lobbying Form (required)

      Please download the below documents, complete, and upload.

    • Copy of W-9 (required)
    • Copy of Certificate of Insurance (required)
    • Copy of Licenses or Certifications (required)
    • Electronic Confirmation
    • Cone of Silence and Communication Document (required)

      To ensure fair consideration is given for all Proposers, it must be clearly understood that upon release of the proposal and during the proposal process, firms and their employees of related companies as well as paid or unpaid personnel acting on their behalf shall not contact or participate in any type of contact with City employees, department heads or elected officials, up to and including the Mayor and City Council. The “Cone of Silence” is in effect for this solicitation from the date the solicitation is advertised on the OpenGov Portal, until the time an award decision has been approved by City Council and fully executed by all parties. Information about the Cone of Silence can be found under the City Code of Ordinances, Section 35.13. Contact with anyone other than the Issuing Officer may result in the vendor being disqualified. All contact must be coordinated through the Issuing Officer, for the procurement of these services.

    • Contractor's Code of Ethics (required)

      The City of Port St Lucie (“City), through its Procurement Management Division (“Procurement  Management Division”) is committed to a procurement process that fosters fair and open competition, is  conducted under the highest ethical standards and enjoys the complete confidence of the public. To achieve  these purposes, Procurement Management Division requires each vendor who seeks to do business with  the City to subscribe to this Contractor’s Code of Ethics.  

      ♦ A Contractor’s bid or proposal will be competitive, consistent and appropriate to the bid documents. 

      ♦ A Contractor will not discuss or consult with other Vendors intending to bid on the same Contract or similar City Contract for the purpose of limiting competition. A Vendor will not make any attempt to induce any individual or entity to submit or not submit a bid or proposal. 

      ♦ Contractor will not disclose the terms of its bids or proposal, directly or indirectly, to any other competing Vendor prior to the bid or proposal closing date. 

      ♦ Contractor will completely perform any Contract awarded to it at the contracted price pursuant to the terms set forth in the Contract. 

      ♦ Contractor will submit timely, accurate and appropriate invoices for goods and/or services actually performed under the Contract. 

      ♦ Contractor will not offer or give any gift, item or service of value, directly or indirectly, to a City employee, City official, employee family member or other vendor contracted by the City. 

      ♦ Contractor will not cause, influence or attempt to cause or influence, any City employee or City Official, which might tend to impair his/her objectivity or independence of judgment; or to use, or attempt to use, his/her official position to secure any unwarranted privileges or advantages for that Vendor or for any other person. 

      ♦ Contractor will disclose to the City any direct or indirect personal interests a City employee or City official holds as it relates to a Vendor contracted by the City. 

      ♦ Contractor must comply with all applicable laws, codes or regulations of the countries, states and localities in which they operate. This includes, but is not limited to, laws and regulations relating to environmental, occupational health and safety, and labor practices. In addition, Contractor must require their suppliers (including temporary labor agencies) to do the same. Contractor must conform their practices to any published standards for their industry. Compliance with  laws, regulations and practices include, but are not limited to, the following:  

      o Obtaining and maintaining all required environmental permits. Further, Contractor will endeavor to minimize natural resource consumption through conservation, recycling and substitution methods. 

      o Providing workers with a safe working environment, which includes identifying and evaluating workplace risks and establishing processes for which employee can report health and safety incidents, as well as providing adequate safety training. 

      o Providing workers with an environment free of discrimination, harassment and abuse, which includes establishing a written antidiscrimination and anti-bullying/harassment policy, as well as clearly noticed policies pertaining to forced labor, child labor, wage and hours, and freedom of association.

      DISCLAIMER: This Code of Ethics is intended as a reference and procedural guide to Contractors. The  information it contains should not be interpreted to supersede any law or regulation, nor does it supersede the  applicable Contractor Contract. In the case of any discrepancies between it and the law, regulation(s) and/or  contractor contract, the law, regulatory provision(s) and/or vendor contract shall prevail. 

    • Drug Free Workplace (required)

      The undersigned Contractor in accordance with section 287.087, Florida Statutes, hereby certifies that they comply fully with the below requirements.

      1. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition. 

      2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations. 

      3. Give each employee engaged in providing the commodities or contractual services that are under proposal a copy of the statement specified in subsection (1). 

      4. In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under proposal, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to, any violation of Chapter 893 Florida Statutes or of any controlled substance law of the United States or any state, for a violation occurring in the workplace no later than five (5) days after such conviction. 

      5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee's community, by any employee who is so convicted. 

      6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section.

    • Affidavit of Nongovernment Entity Anti-Human Trafficking Laws (required)

      In accordance with section 787.06(13), Florida Statutes, the representative of the nongovernmental entity bidder (“Entity”), attests under penalty of perjury that the Entity does not use coercion for labor or services as defined in section 787.06.

    • Vendor Scrutinized Companies List Certification (required)

      Sections 287.135 and 215.473, Florida Statutes, prohibit Florida municipalities from contracting with companies, for goods or services over $1,000,000 that are on either the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or to engage in any Business operations with Cuba or Syria. Sections 287.135 and 215.4725 also prohibit Florida municipalities from contracting with companies, for goods or services in any amount that are on the list of Scrutinized Companies that Boycott Israel.

      The list of "Scrutinized Companies" is created pursuant to Section 215.473, Florida Statutes. A copy of the current list of "Scrutinized Companies" can be found at the following link:

      https://www.sbafla.com/media/mqodaonn/2024_12_17_-israel-scrutinized-companies-list-for-web.pdf

      As the person authorized to sign on behalf of the Respondent Vendor, I hereby certify that the company identified above in the section entitled "Respondent Vendor Name" is not listed on either the Scrutinized Companies with Activities in Sudan List; or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List; is not participating in a boycott of Israel; and does not have any business operations with Cuba or Syria. I understand that pursuant to Sections 287.135 and 215.473, Florida Statutes, the submission of a false certification may subject the Respondent Vendor to civil penalties, attorney's fees, and/or costs.

      I understand and agree that the City may immediately terminate any contract resulting from this solicitation upon written notice if the company referenced above are found to have submitted a false certification or any of the following occur with respect to the company or a related entity: (i) for any contract for goods or services in any amount of monies, it has been placed on the Scrutinized Companies that Boycott Israel List, or is engaged in a boycott of Israel, or (ii) for any contract for goods or services of one million dollars ($1,000,000) or more, it has been placed on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or it is found to have been engaged in business operations in Cuba or Syria.

    • I certify that I have read, understood, and agreed to the terms outlined in this solicitation, including all Addenda, Notices, and the Question & Answer section. Furthermore, I confirm that I am authorized to submit this response on behalf of my company. (required)
    • What type of award is this? (required)
    • What insurance terms should be included? (required)

      Please select all applicable from the following:

    • Is a bid bond required for this IFB? (required)

      Example: Construction, Service, Commodities. 

    • What is the bid bond amount? (required)
    • Are payment and performance bonds required? (required)

      Example: Construction (F.S. 255.05) OR Other Bid Base Selection Process. 

    • Is a security deposit required? (required)

      Example: Mowing Services

    • Will there be a pricing table? (required)
    • Pricing (required)
    • Is this project federally funded? (required)

    Questions & Answers

    Q ( Incumbent): Was there a previous incumbent? If so, can you share their price proposal? Has there been any changes to the scope from the last? Did the previous incumbent complete the project term? Is this solicitation the same length of time? If previous incumbents exist, when is the contract set to end?

    A: Information not available since this is the first time we’re bidding this out. This service was piggybacked off another municipality's contract.


    Q ( Bid tabulation): Can you share the previous bid tabulation?

    A: Information not available since this is the first time we’re bidding this out. This service was piggybacked off another municipality's contract.


    Q ( Budget): Is there a set budget for this solicitation?

    A: Budget is at estimated 750K for the initial 3-year term.


    Q (Projected start): Is there a projected award and start date?

    A: Dependent upon time required to process the contract after closing of the solicitation, estimated 2-3 months.


    Q (contractor owned equipment usage ): Section 1.4 states that a 10% markup shall apply to equipment rentals and materials. For specialized equipment such as abrasive blasting compressors, blast pots, air dryers, and pressure washing units, may contractor-owned equipment be billed at an established equipment usage rate (similar to rental equipment), or is reimbursement limited only to third-party equipment rentals? Some of our rigs cost over $100,000 and the wear and tear and maintenance is very costly, example. Basic service after 300 to 500 hours of run time on our compressors is approximately $1,500 to service them..

    A: Only for third party rental equipment all other costs should be factored into the hourly rates.


    Q (Consumables ): For abrasive blasting operations, are consumables such as abrasive media, blast nozzles, hoses, couplings, and related wear parts considered reimbursable materials under the Contract and therefore eligible for the 10% markup referenced in Section 1.4? Example: one blast nozzle can run $700 and last 30 to 60 days depending on abrasive used and 1 part on a blast pot can cost on average $65 and need replacing every 5 to 10 days depending on abrasive used

    A: These costs should be factored into the hourly rate.


    Q (specific coatings requirements): Will the City provide project-specific technical specifications for each task order (e.g., surface preparation standards, coating systems, DFT requirements, and NSF coating requirements), or will the Contractor be responsible for recommending coating systems for City approval?

    A: Contractor will be responsible for recommending coating systems.


    Q (No subject): Does the City anticipate allowances for pricing escalations from year to year or upon renewal? If so, how do the pricing escalations intend to be measured?

    A: The City does not anticipate any allowances for pricing escalation. All labor rates are required to remain fixed for the duration of the contract term, including any renewal periods. As a result, no escalation formula or adjustment method will be applied.


    Q (No subject): Can the City provide examples of typical project scopes expected under this contract (e.g., approximate square footage of surfaces to be cleaned or coated, tank sizes, or typical structures serviced)?

    A: Examples of typical project scopes: Provide all labor, materials, transportation, equipment and all incidentals to prep and recoat 306 lf of 1” pipe. Scope of work Sand all pipes and clean them with chemical cleaner. Apply one coat of Tnemec’s Series 135 Chembuild primer. Apply one coat of Tnemec’s Series 1070 Fluoronar Finish. Color will be Safety Red All materials to be applied as per manufacturer’s recommendation.


    Q (List of Utility Systems Department facilities): Can the City provide a general list of Utility Systems Department facilities where work may occur (such as water treatment plants, wastewater treatment plants, or pumping stations)?

    A: 2- Water treatment plants, 4- Water treatment booster pump stations, 2- Wastewater treatment plants, 3- Wastewater booster pump stations, McCarty Ranch metal building structures.


    Q (Work orders): Approximately how many work orders per year does the City anticipate issuing under this contract?

    A: 4- 10 per depending on the cost and scope of each project.


    Q (Number of General Contractors): Does the City intend to award this contract to one contractor or multiple contractors?

    A: One contractor will be selected.


    Q (Size of project): Does the City anticipate a minimum project size or minimum work order value for individual task orders?

    A: The City does not anticipate a minimum project size or a minimum work order value for individual task orders.


    Q (Site Visit Inquiry): Would the City consider scheduling a site visit or providing access to typical work locations under this contract? Having the opportunity to view the facilities would help us develop more accurate and competitive pricing.

    A: Please refer to Addendum No. 1 for site visit information.


    Key dates

    1. March 9, 2026Published
    2. April 7, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.