SLED Opportunity · OKLAHOMA · THE CITY OF OKLAHOMA CITY AND TRUSTS
AI Summary
The City of Oklahoma City seeks bids for sanitary sewer line replacement and waterline installation including trench excavation, pipe installation, manhole work, and related construction services. Mandatory pre-bid conference on April 2, 2026. Bid due April 15, 2026.
Prequalification Requirements is Wastewater pipeline contractor “B” and Water pipeline contractor “C” SC-1070 and WC-1134, Sanitary Sewer Line Replacement and Waterline Installation, 2717 NW Expressway to Linn Avenue and in the vicinity of NW 56th Street and Pennsylvania Avenue **Project Type**: RFB - Request for Bid (Formal) **Source ID**: PU.MU.USA.2722754.C19106251 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/07/2026 11:00 AM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: The Oklahoma City Water Utilities Trust **Reference Number**: 0000416019 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Construction Business Relationship Affidavit | Attach Notarized Construction Business Relationship Affidavit | Yes | Yes | | Construction Anti Non-Collusion Affidavit | Attach Notarized Construction Anti-Collusion Affidavit | Yes | Yes | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Mandatory | Event date: 04/02/2026 01:00 PM EDT | Location: 420 West Main St, 5th Floor, Conference Room B, Oklahoma City, Oklahoma 73102 | Event Note: 103.01.03 – MANDATORY PRE-BID CONFERENCE103.01.03.01 When specified in the Notice to Bidder, attendance at the Pre-Bid Conference is a prequalification requirement. If there is a virtual meeting option, the virtual address will be provided in the Notice to Bidders. When the Notice to Bidders specifies that the Pre-Bid Conference is mandatory, the contractor who plans to submit a bid must attend the Mandatory Pre Bid Conference. Failure of the prospective bidders to attend a Mandatory Pre-Bid Conference will cause the bidder’s submission to be rejected. Whenever required, a Mandatory Pre-Bid Conference is a prequalification requirement to bid on the contract. **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Project 1 Next 1-Base Bid Code Description UOM Qty 109 COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 212 TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) Linear Foot/Feet 50 212 TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) Linear Foot/Feet 387 212 TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) Linear Foot/Feet 541 212 TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) Linear Foot/Feet 877 501 (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) Linear Foot/Feet 4 507 FIRE HYDRANT Each 1 508 REMOVAL OF FIRE HYDRANT Each 1 512 (6 inch) (TAPPING) VALVE AND VALVE BOX Each 1 513 HYDROSTATIC PRESSURE TESTING AND DISINFECTION Lump-Sum 1 520 (8 inch X 6 inch) TAPPING SLEEVE Each 1 601 SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) Linear Foot/Feet 377 601 SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) Linear Foot/Feet 1418 602 SEWER SERVICE CONNECTION Each 1 603 SEWER SERVICE LINE Linear Foot/Feet 30 604 ABANDONING SEWER Cubic Yard 39 608 SEWER FLOW CONTROL Lump-Sum 1 613 DEFLECTION TEST (<24 inch) Lump-Sum 1 614 TELEVISION INSPECTION (CCTV) (POST CONST.) Linear Foot/Feet 2367 615 SEWER LEAK TEST (<24 inch) Lump-Sum 1 616 (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 3 616 (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 9 616 (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 1 616 (4 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 21 616 (5 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 124 616 (6 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 10 616 MANHOLE DROP CONNECTION Each 2 618 SANITARY SEWER MANHOLE REHABILITATION Vertical Feet 21 629 ABANDONING MANHOLE Each 4 635 STEEL CASING PIPE (CARRIER SIZE 8 inch) Linear Foot/Feet 60 635 BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) Linear Foot/Feet 512 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 809 MOBILIZATION Lump-Sum 1 811 STRUCTURE REMOVAL (MANHOLE) Each 2 811 STRUCTURE REMOVAL (BOLLARDS) Each 4 823 SIDEWALK REMOVAL Square Yard 50 814 PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) Square Yard 19 814 PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) Square Yard 77 823 SIDEWALK (4 inch) Square Yard 31 823 CURB RAMP (8 inch) Square Yard 16 823 TACTILE WARNING DEVICE Square Foot/Feet 30 823 CLASS C CONCRETE Cubic Yard 26 829 CURB AND GUTTER Linear Foot/Feet 52 829 INTEGRAL CURB Linear Foot/Feet 27 838 TEMPORARY EROSION CONTROL Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6750 SPEC. DEMOLISH LIFT STATION (SP) Lump-Sum 1 | Next 1-Base Bid Code Description UOM Qty 109 COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 212 TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) Linear Foot/Feet 50 212 TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) Linear Foot/Feet 387 212 TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) Linear Foot/Feet 541 212 TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) Linear Foot/Feet 877 501 (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) Linear Foot/Feet 4 507 FIRE HYDRANT Each 1 508 REMOVAL OF FIRE HYDRANT Each 1 512 (6 inch) (TAPPING) VALVE AND VALVE BOX Each 1 513 HYDROSTATIC PRESSURE TESTING AND DISINFECTION Lump-Sum 1 520 (8 inch X 6 inch) TAPPING SLEEVE Each 1 601 SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) Linear Foot/Feet 377 601 SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) Linear Foot/Feet 1418 602 SEWER SERVICE CONNECTION Each 1 603 SEWER SERVICE LINE Linear Foot/Feet 30 604 ABANDONING SEWER Cubic Yard 39 608 SEWER FLOW CONTROL Lump-Sum 1 613 DEFLECTION TEST (<24 inch) Lump-Sum 1 614 TELEVISION INSPECTION (CCTV) (POST CONST.) Linear Foot/Feet 2367 615 SEWER LEAK TEST (<24 inch) Lump-Sum 1 616 (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 3 616 (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 9 616 (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 1 616 (4 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 21 616 (5 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 124 616 (6 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 10 616 MANHOLE DROP CONNECTION Each 2 618 SANITARY SEWER MANHOLE REHABILITATION Vertical Feet 21 629 ABANDONING MANHOLE Each 4 635 STEEL CASING PIPE (CARRIER SIZE 8 inch) Linear Foot/Feet 60 635 BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) Linear Foot/Feet 512 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 809 MOBILIZATION Lump-Sum 1 811 STRUCTURE REMOVAL (MANHOLE) Each 2 811 STRUCTURE REMOVAL (BOLLARDS) Each 4 823 SIDEWALK REMOVAL Square Yard 50 814 PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) Square Yard 19 814 PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) Square Yard 77 823 SIDEWALK (4 inch) Square Yard 31 823 CURB RAMP (8 inch) Square Yard 16 823 TACTILE WARNING DEVICE Square Foot/Feet 30 823 CLASS C CONCRETE Cubic Yard 26 829 CURB AND GUTTER Linear Foot/Feet 52 829 INTEGRAL CURB Linear Foot/Feet 27 838 TEMPORARY EROSION CONTROL Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6750 SPEC. DEMOLISH LIFT STATION (SP) Lump-Sum 1 | Code Description UOM Qty | 109 COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 212 TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) Linear Foot/Feet 50 212 TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) Linear Foot/Feet 387 212 TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) Linear Foot/Feet 541 212 TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) Linear Foot/Feet 877 501 (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) Linear Foot/Feet 4 507 FIRE HYDRANT Each 1 508 REMOVAL OF FIRE HYDRANT Each 1 512 (6 inch) (TAPPING) VALVE AND VALVE BOX Each 1 513 HYDROSTATIC PRESSURE TESTING AND DISINFECTION Lump-Sum 1 520 (8 inch X 6 inch) TAPPING SLEEVE Each 1 601 SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) Linear Foot/Feet 377 601 SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) Linear Foot/Feet 1418 602 SEWER SERVICE CONNECTION Each 1 603 SEWER SERVICE LINE Linear Foot/Feet 30 604 ABANDONING SEWER Cubic Yard 39 608 SEWER FLOW CONTROL Lump-Sum 1 613 DEFLECTION TEST (<24 inch) Lump-Sum 1 614 TELEVISION INSPECTION (CCTV) (POST CONST.) Linear Foot/Feet 2367 615 SEWER LEAK TEST (<24 inch) Lump-Sum 1 616 (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 3 616 (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 9 616 (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 1 616 (4 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 21 616 (5 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 124 616 (6 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 10 616 MANHOLE DROP CONNECTION Each 2 618 SANITARY SEWER MANHOLE REHABILITATION Vertical Feet 21 629 ABANDONING MANHOLE Each 4 635 STEEL CASING PIPE (CARRIER SIZE 8 inch) Linear Foot/Feet 60 635 BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) Linear Foot/Feet 512 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 809 MOBILIZATION Lump-Sum 1 811 STRUCTURE REMOVAL (MANHOLE) Each 2 811 STRUCTURE REMOVAL (BOLLARDS) Each 4 823 SIDEWALK REMOVAL Square Yard 50 814 PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) Square Yard 19 814 PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) Square Yard 77 823 SIDEWALK (4 inch) Square Yard 31 823 CURB RAMP (8 inch) Square Yard 16 823 TACTILE WARNING DEVICE Square Foot/Feet 30 823 CLASS C CONCRETE Cubic Yard 26 829 CURB AND GUTTER Linear Foot/Feet 52 829 INTEGRAL CURB Linear Foot/Feet 27 838 TEMPORARY EROSION CONTROL Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6750 SPEC. DEMOLISH LIFT STATION (SP) Lump-Sum 1 | 109 | COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) | Lump-Sum | 1 | 204 | CLEARING AND GRUBBING | Lump-Sum | 1 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) | Linear Foot/Feet | 50 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) | Linear Foot/Feet | 387 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) | Linear Foot/Feet | 541 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) | Linear Foot/Feet | 877 | 501 | (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) | Linear Foot/Feet | 4 | 507 | FIRE HYDRANT | Each | 1 | 508 | REMOVAL OF FIRE HYDRANT | Each | 1 | 512 | (6 inch) (TAPPING) VALVE AND VALVE BOX | Each | 1 | 513 | HYDROSTATIC PRESSURE TESTING AND DISINFECTION | Lump-Sum | 1 | 520 | (8 inch X 6 inch) TAPPING SLEEVE | Each | 1 | 601 | SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) | Linear Foot/Feet | 377 | 601 | SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) | Linear Foot/Feet | 1418 | 602 | SEWER SERVICE CONNECTION | Each | 1 | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 30 | 604 | ABANDONING SEWER | Cubic Yard | 39 | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | 613 | DEFLECTION TEST (<24 inch) | Lump-Sum | 1 | 614 | TELEVISION INSPECTION (CCTV) (POST CONST.) | Linear Foot/Feet | 2367 | 615 | SEWER LEAK TEST (<24 inch) | Lump-Sum | 1 | 616 | (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 3 | 616 | (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 9 | 616 | (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 1 | 616 | (4 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 21 | 616 | (5 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 124 | 616 | (6 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 10 | 616 | MANHOLE DROP CONNECTION | Each | 2 | 618 | SANITARY SEWER MANHOLE REHABILITATION | Vertical Feet | 21 | 629 | ABANDONING MANHOLE | Each | 4 | 635 | STEEL CASING PIPE (CARRIER SIZE 8 inch) | Linear Foot/Feet | 60 | 635 | BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) | Linear Foot/Feet | 512 | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | 809 | MOBILIZATION | Lump-Sum | 1 | 811 | STRUCTURE REMOVAL (MANHOLE) | Each | 2 | 811 | STRUCTURE REMOVAL (BOLLARDS) | Each | 4 | 823 | SIDEWALK REMOVAL | Square Yard | 50 | 814 | PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) | Square Yard | 19 | 814 | PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) | Square Yard | 77 | 823 | SIDEWALK (4 inch) | Square Yard | 31 | 823 | CURB RAMP (8 inch) | Square Yard | 16 | 823 | TACTILE WARNING DEVICE | Square Foot/Feet | 30 | 823 | CLASS C CONCRETE | Cubic Yard | 26 | 829 | CURB AND GUTTER | Linear Foot/Feet | 52 | 829 | INTEGRAL CURB | Linear Foot/Feet | 27 | 838 | TEMPORARY EROSION CONTROL | Lump-Sum | 1 | 840 | SOLID SLAB SODDING | Square Yard | 6750 | SPEC. | DEMOLISH LIFT STATION (SP) | Lump-Sum | 1 | | | | Next 1-Base Bid Code Description UOM Qty 109 COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 212 TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) Linear Foot/Feet 50 212 TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) Linear Foot/Feet 387 212 TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) Linear Foot/Feet 541 212 TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) Linear Foot/Feet 877 501 (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) Linear Foot/Feet 4 507 FIRE HYDRANT Each 1 508 REMOVAL OF FIRE HYDRANT Each 1 512 (6 inch) (TAPPING) VALVE AND VALVE BOX Each 1 513 HYDROSTATIC PRESSURE TESTING AND DISINFECTION Lump-Sum 1 520 (8 inch X 6 inch) TAPPING SLEEVE Each 1 601 SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) Linear Foot/Feet 377 601 SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) Linear Foot/Feet 1418 602 SEWER SERVICE CONNECTION Each 1 603 SEWER SERVICE LINE Linear Foot/Feet 30 604 ABANDONING SEWER Cubic Yard 39 608 SEWER FLOW CONTROL Lump-Sum 1 613 DEFLECTION TEST (<24 inch) Lump-Sum 1 614 TELEVISION INSPECTION (CCTV) (POST CONST.) Linear Foot/Feet 2367 615 SEWER LEAK TEST (<24 inch) Lump-Sum 1 616 (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 3 616 (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 9 616 (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 1 616 (4 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 21 616 (5 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 124 616 (6 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 10 616 MANHOLE DROP CONNECTION Each 2 618 SANITARY SEWER MANHOLE REHABILITATION Vertical Feet 21 629 ABANDONING MANHOLE Each 4 635 STEEL CASING PIPE (CARRIER SIZE 8 inch) Linear Foot/Feet 60 635 BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) Linear Foot/Feet 512 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 809 MOBILIZATION Lump-Sum 1 811 STRUCTURE REMOVAL (MANHOLE) Each 2 811 STRUCTURE REMOVAL (BOLLARDS) Each 4 823 SIDEWALK REMOVAL Square Yard 50 814 PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) Square Yard 19 814 PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) Square Yard 77 823 SIDEWALK (4 inch) Square Yard 31 823 CURB RAMP (8 inch) Square Yard 16 823 TACTILE WARNING DEVICE Square Foot/Feet 30 823 CLASS C CONCRETE Cubic Yard 26 829 CURB AND GUTTER Linear Foot/Feet 52 829 INTEGRAL CURB Linear Foot/Feet 27 838 TEMPORARY EROSION CONTROL Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6750 SPEC. DEMOLISH LIFT STATION (SP) Lump-Sum 1 | Code Description UOM Qty | 109 COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 212 TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) Linear Foot/Feet 50 212 TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) Linear Foot/Feet 387 212 TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) Linear Foot/Feet 541 212 TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) Linear Foot/Feet 877 501 (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) Linear Foot/Feet 4 507 FIRE HYDRANT Each 1 508 REMOVAL OF FIRE HYDRANT Each 1 512 (6 inch) (TAPPING) VALVE AND VALVE BOX Each 1 513 HYDROSTATIC PRESSURE TESTING AND DISINFECTION Lump-Sum 1 520 (8 inch X 6 inch) TAPPING SLEEVE Each 1 601 SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) Linear Foot/Feet 377 601 SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) Linear Foot/Feet 1418 602 SEWER SERVICE CONNECTION Each 1 603 SEWER SERVICE LINE Linear Foot/Feet 30 604 ABANDONING SEWER Cubic Yard 39 608 SEWER FLOW CONTROL Lump-Sum 1 613 DEFLECTION TEST (<24 inch) Lump-Sum 1 614 TELEVISION INSPECTION (CCTV) (POST CONST.) Linear Foot/Feet 2367 615 SEWER LEAK TEST (<24 inch) Lump-Sum 1 616 (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 3 616 (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 9 616 (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 1 616 (4 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 21 616 (5 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 124 616 (6 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 10 616 MANHOLE DROP CONNECTION Each 2 618 SANITARY SEWER MANHOLE REHABILITATION Vertical Feet 21 629 ABANDONING MANHOLE Each 4 635 STEEL CASING PIPE (CARRIER SIZE 8 inch) Linear Foot/Feet 60 635 BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) Linear Foot/Feet 512 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 809 MOBILIZATION Lump-Sum 1 811 STRUCTURE REMOVAL (MANHOLE) Each 2 811 STRUCTURE REMOVAL (BOLLARDS) Each 4 823 SIDEWALK REMOVAL Square Yard 50 814 PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) Square Yard 19 814 PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) Square Yard 77 823 SIDEWALK (4 inch) Square Yard 31 823 CURB RAMP (8 inch) Square Yard 16 823 TACTILE WARNING DEVICE Square Foot/Feet 30 823 CLASS C CONCRETE Cubic Yard 26 829 CURB AND GUTTER Linear Foot/Feet 52 829 INTEGRAL CURB Linear Foot/Feet 27 838 TEMPORARY EROSION CONTROL Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6750 SPEC. DEMOLISH LIFT STATION (SP) Lump-Sum 1 | 109 | COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) | Lump-Sum | 1 | 204 | CLEARING AND GRUBBING | Lump-Sum | 1 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) | Linear Foot/Feet | 50 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) | Linear Foot/Feet | 387 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) | Linear Foot/Feet | 541 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) | Linear Foot/Feet | 877 | 501 | (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) | Linear Foot/Feet | 4 | 507 | FIRE HYDRANT | Each | 1 | 508 | REMOVAL OF FIRE HYDRANT | Each | 1 | 512 | (6 inch) (TAPPING) VALVE AND VALVE BOX | Each | 1 | 513 | HYDROSTATIC PRESSURE TESTING AND DISINFECTION | Lump-Sum | 1 | 520 | (8 inch X 6 inch) TAPPING SLEEVE | Each | 1 | 601 | SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) | Linear Foot/Feet | 377 | 601 | SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) | Linear Foot/Feet | 1418 | 602 | SEWER SERVICE CONNECTION | Each | 1 | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 30 | 604 | ABANDONING SEWER | Cubic Yard | 39 | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | 613 | DEFLECTION TEST (<24 inch) | Lump-Sum | 1 | 614 | TELEVISION INSPECTION (CCTV) (POST CONST.) | Linear Foot/Feet | 2367 | 615 | SEWER LEAK TEST (<24 inch) | Lump-Sum | 1 | 616 | (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 3 | 616 | (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 9 | 616 | (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 1 | 616 | (4 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 21 | 616 | (5 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 124 | 616 | (6 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 10 | 616 | MANHOLE DROP CONNECTION | Each | 2 | 618 | SANITARY SEWER MANHOLE REHABILITATION | Vertical Feet | 21 | 629 | ABANDONING MANHOLE | Each | 4 | 635 | STEEL CASING PIPE (CARRIER SIZE 8 inch) | Linear Foot/Feet | 60 | 635 | BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) | Linear Foot/Feet | 512 | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | 809 | MOBILIZATION | Lump-Sum | 1 | 811 | STRUCTURE REMOVAL (MANHOLE) | Each | 2 | 811 | STRUCTURE REMOVAL (BOLLARDS) | Each | 4 | 823 | SIDEWALK REMOVAL | Square Yard | 50 | 814 | PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) | Square Yard | 19 | 814 | PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) | Square Yard | 77 | 823 | SIDEWALK (4 inch) | Square Yard | 31 | 823 | CURB RAMP (8 inch) | Square Yard | 16 | 823 | TACTILE WARNING DEVICE | Square Foot/Feet | 30 | 823 | CLASS C CONCRETE | Cubic Yard | 26 | 829 | CURB AND GUTTER | Linear Foot/Feet | 52 | 829 | INTEGRAL CURB | Linear Foot/Feet | 27 | 838 | TEMPORARY EROSION CONTROL | Lump-Sum | 1 | 840 | SOLID SLAB SODDING | Square Yard | 6750 | SPEC. | DEMOLISH LIFT STATION (SP) | Lump-Sum | 1 | | | Code Description UOM Qty | | 109 COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 212 TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) Linear Foot/Feet 50 212 TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) Linear Foot/Feet 387 212 TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) Linear Foot/Feet 541 212 TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) Linear Foot/Feet 877 501 (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) Linear Foot/Feet 4 507 FIRE HYDRANT Each 1 508 REMOVAL OF FIRE HYDRANT Each 1 512 (6 inch) (TAPPING) VALVE AND VALVE BOX Each 1 513 HYDROSTATIC PRESSURE TESTING AND DISINFECTION Lump-Sum 1 520 (8 inch X 6 inch) TAPPING SLEEVE Each 1 601 SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) Linear Foot/Feet 377 601 SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) Linear Foot/Feet 1418 602 SEWER SERVICE CONNECTION Each 1 603 SEWER SERVICE LINE Linear Foot/Feet 30 604 ABANDONING SEWER Cubic Yard 39 608 SEWER FLOW CONTROL Lump-Sum 1 613 DEFLECTION TEST (<24 inch) Lump-Sum 1 614 TELEVISION INSPECTION (CCTV) (POST CONST.) Linear Foot/Feet 2367 615 SEWER LEAK TEST (<24 inch) Lump-Sum 1 616 (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 3 616 (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 9 616 (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 1 616 (4 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 21 616 (5 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 124 616 (6 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 10 616 MANHOLE DROP CONNECTION Each 2 618 SANITARY SEWER MANHOLE REHABILITATION Vertical Feet 21 629 ABANDONING MANHOLE Each 4 635 STEEL CASING PIPE (CARRIER SIZE 8 inch) Linear Foot/Feet 60 635 BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) Linear Foot/Feet 512 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 809 MOBILIZATION Lump-Sum 1 811 STRUCTURE REMOVAL (MANHOLE) Each 2 811 STRUCTURE REMOVAL (BOLLARDS) Each 4 823 SIDEWALK REMOVAL Square Yard 50 814 PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) Square Yard 19 814 PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) Square Yard 77 823 SIDEWALK (4 inch) Square Yard 31 823 CURB RAMP (8 inch) Square Yard 16 823 TACTILE WARNING DEVICE Square Foot/Feet 30 823 CLASS C CONCRETE Cubic Yard 26 829 CURB AND GUTTER Linear Foot/Feet 52 829 INTEGRAL CURB Linear Foot/Feet 27 838 TEMPORARY EROSION CONTROL Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6750 SPEC. DEMOLISH LIFT STATION (SP) Lump-Sum 1 | 109 | COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) | Lump-Sum | 1 | 204 | CLEARING AND GRUBBING | Lump-Sum | 1 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) | Linear Foot/Feet | 50 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) | Linear Foot/Feet | 387 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) | Linear Foot/Feet | 541 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) | Linear Foot/Feet | 877 | 501 | (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) | Linear Foot/Feet | 4 | 507 | FIRE HYDRANT | Each | 1 | 508 | REMOVAL OF FIRE HYDRANT | Each | 1 | 512 | (6 inch) (TAPPING) VALVE AND VALVE BOX | Each | 1 | 513 | HYDROSTATIC PRESSURE TESTING AND DISINFECTION | Lump-Sum | 1 | 520 | (8 inch X 6 inch) TAPPING SLEEVE | Each | 1 | 601 | SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) | Linear Foot/Feet | 377 | 601 | SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) | Linear Foot/Feet | 1418 | 602 | SEWER SERVICE CONNECTION | Each | 1 | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 30 | 604 | ABANDONING SEWER | Cubic Yard | 39 | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | 613 | DEFLECTION TEST (<24 inch) | Lump-Sum | 1 | 614 | TELEVISION INSPECTION (CCTV) (POST CONST.) | Linear Foot/Feet | 2367 | 615 | SEWER LEAK TEST (<24 inch) | Lump-Sum | 1 | 616 | (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 3 | 616 | (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 9 | 616 | (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 1 | 616 | (4 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 21 | 616 | (5 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 124 | 616 | (6 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 10 | 616 | MANHOLE DROP CONNECTION | Each | 2 | 618 | SANITARY SEWER MANHOLE REHABILITATION | Vertical Feet | 21 | 629 | ABANDONING MANHOLE | Each | 4 | 635 | STEEL CASING PIPE (CARRIER SIZE 8 inch) | Linear Foot/Feet | 60 | 635 | BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) | Linear Foot/Feet | 512 | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | 809 | MOBILIZATION | Lump-Sum | 1 | 811 | STRUCTURE REMOVAL (MANHOLE) | Each | 2 | 811 | STRUCTURE REMOVAL (BOLLARDS) | Each | 4 | 823 | SIDEWALK REMOVAL | Square Yard | 50 | 814 | PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) | Square Yard | 19 | 814 | PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) | Square Yard | 77 | 823 | SIDEWALK (4 inch) | Square Yard | 31 | 823 | CURB RAMP (8 inch) | Square Yard | 16 | 823 | TACTILE WARNING DEVICE | Square Foot/Feet | 30 | 823 | CLASS C CONCRETE | Cubic Yard | 26 | 829 | CURB AND GUTTER | Linear Foot/Feet | 52 | 829 | INTEGRAL CURB | Linear Foot/Feet | 27 | 838 | TEMPORARY EROSION CONTROL | Lump-Sum | 1 | 840 | SOLID SLAB SODDING | Square Yard | 6750 | SPEC. | DEMOLISH LIFT STATION (SP) | Lump-Sum | 1 | | | 109 | COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) | Lump-Sum | 1 | | 204 | CLEARING AND GRUBBING | Lump-Sum | 1 | | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) | Linear Foot/Feet | 50 | | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) | Linear Foot/Feet | 387 | | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) | Linear Foot/Feet | 541 | | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) | Linear Foot/Feet | 877 | | 501 | (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) | Linear Foot/Feet | 4 | | 507 | FIRE HYDRANT | Each | 1 | | 508 | REMOVAL OF FIRE HYDRANT | Each | 1 | | 512 | (6 inch) (TAPPING) VALVE AND VALVE BOX | Each | 1 | | 513 | HYDROSTATIC PRESSURE TESTING AND DISINFECTION | Lump-Sum | 1 | | 520 | (8 inch X 6 inch) TAPPING SLEEVE | Each | 1 | | 601 | SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) | Linear Foot/Feet | 377 | | 601 | SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) | Linear Foot/Feet | 1418 | | 602 | SEWER SERVICE CONNECTION | Each | 1 | | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 30 | | 604 | ABANDONING SEWER | Cubic Yard | 39 | | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | | 613 | DEFLECTION TEST (<24 inch) | Lump-Sum | 1 | | 614 | TELEVISION INSPECTION (CCTV) (POST CONST.) | Linear Foot/Feet | 2367 | | 615 | SEWER LEAK TEST (<24 inch) | Lump-Sum | 1 | | 616 | (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 3 | | 616 | (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 9 | | 616 | (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 1 | | 616 | (4 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 21 | | 616 | (5 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 124 | | 616 | (6 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 10 | | 616 | MANHOLE DROP CONNECTION | Each | 2 | | 618 | SANITARY SEWER MANHOLE REHABILITATION | Vertical Feet | 21 | | 629 | ABANDONING MANHOLE | Each | 4 | | 635 | STEEL CASING PIPE (CARRIER SIZE 8 inch) | Linear Foot/Feet | 60 | | 635 | BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) | Linear Foot/Feet | 512 | | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | | 809 | MOBILIZATION | Lump-Sum | 1 | | 811 | STRUCTURE REMOVAL (MANHOLE) | Each | 2 | | 811 | STRUCTURE REMOVAL (BOLLARDS) | Each | 4 | | 823 | SIDEWALK REMOVAL | Square Yard | 50 | | 814 | PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) | Square Yard | 19 | | 814 | PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) | Square Yard | 77 | | 823 | SIDEWALK (4 inch) | Square Yard | 31 | | 823 | CURB RAMP (8 inch) | Square Yard | 16 | | 823 | TACTILE WARNING DEVICE | Square Foot/Feet | 30 | | 823 | CLASS C CONCRETE | Cubic Yard | 26 | | 829 | CURB AND GUTTER | Linear Foot/Feet | 52 | | 829 | INTEGRAL CURB | Linear Foot/Feet | 27 | | 838 | TEMPORARY EROSION CONTROL | Lump-Sum | 1 | | 840 | SOLID SLAB SODDING | Square Yard | 6750 | | SPEC. | DEMOLISH LIFT STATION (SP) | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next 1-Base Bid Code Description UOM Qty 109 COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 212 TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) Linear Foot/Feet 50 212 TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) Linear Foot/Feet 387 212 TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) Linear Foot/Feet 541 212 TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) Linear Foot/Feet 877 501 (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) Linear Foot/Feet 4 507 FIRE HYDRANT Each 1 508 REMOVAL OF FIRE HYDRANT Each 1 512 (6 inch) (TAPPING) VALVE AND VALVE BOX Each 1 513 HYDROSTATIC PRESSURE TESTING AND DISINFECTION Lump-Sum 1 520 (8 inch X 6 inch) TAPPING SLEEVE Each 1 601 SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) Linear Foot/Feet 377 601 SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) Linear Foot/Feet 1418 602 SEWER SERVICE CONNECTION Each 1 603 SEWER SERVICE LINE Linear Foot/Feet 30 604 ABANDONING SEWER Cubic Yard 39 608 SEWER FLOW CONTROL Lump-Sum 1 613 DEFLECTION TEST (<24 inch) Lump-Sum 1 614 TELEVISION INSPECTION (CCTV) (POST CONST.) Linear Foot/Feet 2367 615 SEWER LEAK TEST (<24 inch) Lump-Sum 1 616 (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 3 616 (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 9 616 (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 1 616 (4 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 21 616 (5 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 124 616 (6 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 10 616 MANHOLE DROP CONNECTION Each 2 618 SANITARY SEWER MANHOLE REHABILITATION Vertical Feet 21 629 ABANDONING MANHOLE Each 4 635 STEEL CASING PIPE (CARRIER SIZE 8 inch) Linear Foot/Feet 60 635 BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) Linear Foot/Feet 512 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 809 MOBILIZATION Lump-Sum 1 811 STRUCTURE REMOVAL (MANHOLE) Each 2 811 STRUCTURE REMOVAL (BOLLARDS) Each 4 823 SIDEWALK REMOVAL Square Yard 50 814 PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) Square Yard 19 814 PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) Square Yard 77 823 SIDEWALK (4 inch) Square Yard 31 823 CURB RAMP (8 inch) Square Yard 16 823 TACTILE WARNING DEVICE Square Foot/Feet 30 823 CLASS C CONCRETE Cubic Yard 26 829 CURB AND GUTTER Linear Foot/Feet 52 829 INTEGRAL CURB Linear Foot/Feet 27 838 TEMPORARY EROSION CONTROL Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6750 SPEC. DEMOLISH LIFT STATION (SP) Lump-Sum 1 | Code Description UOM Qty | 109 COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 212 TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) Linear Foot/Feet 50 212 TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) Linear Foot/Feet 387 212 TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) Linear Foot/Feet 541 212 TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) Linear Foot/Feet 877 501 (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) Linear Foot/Feet 4 507 FIRE HYDRANT Each 1 508 REMOVAL OF FIRE HYDRANT Each 1 512 (6 inch) (TAPPING) VALVE AND VALVE BOX Each 1 513 HYDROSTATIC PRESSURE TESTING AND DISINFECTION Lump-Sum 1 520 (8 inch X 6 inch) TAPPING SLEEVE Each 1 601 SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) Linear Foot/Feet 377 601 SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) Linear Foot/Feet 1418 602 SEWER SERVICE CONNECTION Each 1 603 SEWER SERVICE LINE Linear Foot/Feet 30 604 ABANDONING SEWER Cubic Yard 39 608 SEWER FLOW CONTROL Lump-Sum 1 613 DEFLECTION TEST (<24 inch) Lump-Sum 1 614 TELEVISION INSPECTION (CCTV) (POST CONST.) Linear Foot/Feet 2367 615 SEWER LEAK TEST (<24 inch) Lump-Sum 1 616 (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 3 616 (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 9 616 (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 1 616 (4 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 21 616 (5 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 124 616 (6 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 10 616 MANHOLE DROP CONNECTION Each 2 618 SANITARY SEWER MANHOLE REHABILITATION Vertical Feet 21 629 ABANDONING MANHOLE Each 4 635 STEEL CASING PIPE (CARRIER SIZE 8 inch) Linear Foot/Feet 60 635 BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) Linear Foot/Feet 512 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 809 MOBILIZATION Lump-Sum 1 811 STRUCTURE REMOVAL (MANHOLE) Each 2 811 STRUCTURE REMOVAL (BOLLARDS) Each 4 823 SIDEWALK REMOVAL Square Yard 50 814 PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) Square Yard 19 814 PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) Square Yard 77 823 SIDEWALK (4 inch) Square Yard 31 823 CURB RAMP (8 inch) Square Yard 16 823 TACTILE WARNING DEVICE Square Foot/Feet 30 823 CLASS C CONCRETE Cubic Yard 26 829 CURB AND GUTTER Linear Foot/Feet 52 829 INTEGRAL CURB Linear Foot/Feet 27 838 TEMPORARY EROSION CONTROL Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6750 SPEC. DEMOLISH LIFT STATION (SP) Lump-Sum 1 | 109 | COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) | Lump-Sum | 1 | 204 | CLEARING AND GRUBBING | Lump-Sum | 1 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) | Linear Foot/Feet | 50 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) | Linear Foot/Feet | 387 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) | Linear Foot/Feet | 541 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) | Linear Foot/Feet | 877 | 501 | (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) | Linear Foot/Feet | 4 | 507 | FIRE HYDRANT | Each | 1 | 508 | REMOVAL OF FIRE HYDRANT | Each | 1 | 512 | (6 inch) (TAPPING) VALVE AND VALVE BOX | Each | 1 | 513 | HYDROSTATIC PRESSURE TESTING AND DISINFECTION | Lump-Sum | 1 | 520 | (8 inch X 6 inch) TAPPING SLEEVE | Each | 1 | 601 | SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) | Linear Foot/Feet | 377 | 601 | SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) | Linear Foot/Feet | 1418 | 602 | SEWER SERVICE CONNECTION | Each | 1 | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 30 | 604 | ABANDONING SEWER | Cubic Yard | 39 | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | 613 | DEFLECTION TEST (<24 inch) | Lump-Sum | 1 | 614 | TELEVISION INSPECTION (CCTV) (POST CONST.) | Linear Foot/Feet | 2367 | 615 | SEWER LEAK TEST (<24 inch) | Lump-Sum | 1 | 616 | (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 3 | 616 | (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 9 | 616 | (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 1 | 616 | (4 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 21 | 616 | (5 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 124 | 616 | (6 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 10 | 616 | MANHOLE DROP CONNECTION | Each | 2 | 618 | SANITARY SEWER MANHOLE REHABILITATION | Vertical Feet | 21 | 629 | ABANDONING MANHOLE | Each | 4 | 635 | STEEL CASING PIPE (CARRIER SIZE 8 inch) | Linear Foot/Feet | 60 | 635 | BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) | Linear Foot/Feet | 512 | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | 809 | MOBILIZATION | Lump-Sum | 1 | 811 | STRUCTURE REMOVAL (MANHOLE) | Each | 2 | 811 | STRUCTURE REMOVAL (BOLLARDS) | Each | 4 | 823 | SIDEWALK REMOVAL | Square Yard | 50 | 814 | PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) | Square Yard | 19 | 814 | PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) | Square Yard | 77 | 823 | SIDEWALK (4 inch) | Square Yard | 31 | 823 | CURB RAMP (8 inch) | Square Yard | 16 | 823 | TACTILE WARNING DEVICE | Square Foot/Feet | 30 | 823 | CLASS C CONCRETE | Cubic Yard | 26 | 829 | CURB AND GUTTER | Linear Foot/Feet | 52 | 829 | INTEGRAL CURB | Linear Foot/Feet | 27 | 838 | TEMPORARY EROSION CONTROL | Lump-Sum | 1 | 840 | SOLID SLAB SODDING | Square Yard | 6750 | SPEC. | DEMOLISH LIFT STATION (SP) | Lump-Sum | 1 | | | Code Description UOM Qty | | 109 COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 212 TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) Linear Foot/Feet 50 212 TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) Linear Foot/Feet 387 212 TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) Linear Foot/Feet 541 212 TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) Linear Foot/Feet 877 501 (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) Linear Foot/Feet 4 507 FIRE HYDRANT Each 1 508 REMOVAL OF FIRE HYDRANT Each 1 512 (6 inch) (TAPPING) VALVE AND VALVE BOX Each 1 513 HYDROSTATIC PRESSURE TESTING AND DISINFECTION Lump-Sum 1 520 (8 inch X 6 inch) TAPPING SLEEVE Each 1 601 SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) Linear Foot/Feet 377 601 SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) Linear Foot/Feet 1418 602 SEWER SERVICE CONNECTION Each 1 603 SEWER SERVICE LINE Linear Foot/Feet 30 604 ABANDONING SEWER Cubic Yard 39 608 SEWER FLOW CONTROL Lump-Sum 1 613 DEFLECTION TEST (<24 inch) Lump-Sum 1 614 TELEVISION INSPECTION (CCTV) (POST CONST.) Linear Foot/Feet 2367 615 SEWER LEAK TEST (<24 inch) Lump-Sum 1 616 (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 3 616 (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 9 616 (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 1 616 (4 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 21 616 (5 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 124 616 (6 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 10 616 MANHOLE DROP CONNECTION Each 2 618 SANITARY SEWER MANHOLE REHABILITATION Vertical Feet 21 629 ABANDONING MANHOLE Each 4 635 STEEL CASING PIPE (CARRIER SIZE 8 inch) Linear Foot/Feet 60 635 BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) Linear Foot/Feet 512 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 809 MOBILIZATION Lump-Sum 1 811 STRUCTURE REMOVAL (MANHOLE) Each 2 811 STRUCTURE REMOVAL (BOLLARDS) Each 4 823 SIDEWALK REMOVAL Square Yard 50 814 PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) Square Yard 19 814 PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) Square Yard 77 823 SIDEWALK (4 inch) Square Yard 31 823 CURB RAMP (8 inch) Square Yard 16 823 TACTILE WARNING DEVICE Square Foot/Feet 30 823 CLASS C CONCRETE Cubic Yard 26 829 CURB AND GUTTER Linear Foot/Feet 52 829 INTEGRAL CURB Linear Foot/Feet 27 838 TEMPORARY EROSION CONTROL Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6750 SPEC. DEMOLISH LIFT STATION (SP) Lump-Sum 1 | 109 | COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) | Lump-Sum | 1 | 204 | CLEARING AND GRUBBING | Lump-Sum | 1 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) | Linear Foot/Feet | 50 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) | Linear Foot/Feet | 387 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) | Linear Foot/Feet | 541 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) | Linear Foot/Feet | 877 | 501 | (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) | Linear Foot/Feet | 4 | 507 | FIRE HYDRANT | Each | 1 | 508 | REMOVAL OF FIRE HYDRANT | Each | 1 | 512 | (6 inch) (TAPPING) VALVE AND VALVE BOX | Each | 1 | 513 | HYDROSTATIC PRESSURE TESTING AND DISINFECTION | Lump-Sum | 1 | 520 | (8 inch X 6 inch) TAPPING SLEEVE | Each | 1 | 601 | SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) | Linear Foot/Feet | 377 | 601 | SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) | Linear Foot/Feet | 1418 | 602 | SEWER SERVICE CONNECTION | Each | 1 | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 30 | 604 | ABANDONING SEWER | Cubic Yard | 39 | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | 613 | DEFLECTION TEST (<24 inch) | Lump-Sum | 1 | 614 | TELEVISION INSPECTION (CCTV) (POST CONST.) | Linear Foot/Feet | 2367 | 615 | SEWER LEAK TEST (<24 inch) | Lump-Sum | 1 | 616 | (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 3 | 616 | (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 9 | 616 | (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 1 | 616 | (4 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 21 | 616 | (5 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 124 | 616 | (6 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 10 | 616 | MANHOLE DROP CONNECTION | Each | 2 | 618 | SANITARY SEWER MANHOLE REHABILITATION | Vertical Feet | 21 | 629 | ABANDONING MANHOLE | Each | 4 | 635 | STEEL CASING PIPE (CARRIER SIZE 8 inch) | Linear Foot/Feet | 60 | 635 | BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) | Linear Foot/Feet | 512 | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | 809 | MOBILIZATION | Lump-Sum | 1 | 811 | STRUCTURE REMOVAL (MANHOLE) | Each | 2 | 811 | STRUCTURE REMOVAL (BOLLARDS) | Each | 4 | 823 | SIDEWALK REMOVAL | Square Yard | 50 | 814 | PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) | Square Yard | 19 | 814 | PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) | Square Yard | 77 | 823 | SIDEWALK (4 inch) | Square Yard | 31 | 823 | CURB RAMP (8 inch) | Square Yard | 16 | 823 | TACTILE WARNING DEVICE | Square Foot/Feet | 30 | 823 | CLASS C CONCRETE | Cubic Yard | 26 | 829 | CURB AND GUTTER | Linear Foot/Feet | 52 | 829 | INTEGRAL CURB | Linear Foot/Feet | 27 | 838 | TEMPORARY EROSION CONTROL | Lump-Sum | 1 | 840 | SOLID SLAB SODDING | Square Yard | 6750 | SPEC. | DEMOLISH LIFT STATION (SP) | Lump-Sum | 1 | | | 109 | COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) | Lump-Sum | 1 | | 204 | CLEARING AND GRUBBING | Lump-Sum | 1 | | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) | Linear Foot/Feet | 50 | | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) | Linear Foot/Feet | 387 | | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) | Linear Foot/Feet | 541 | | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) | Linear Foot/Feet | 877 | | 501 | (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) | Linear Foot/Feet | 4 | | 507 | FIRE HYDRANT | Each | 1 | | 508 | REMOVAL OF FIRE HYDRANT | Each | 1 | | 512 | (6 inch) (TAPPING) VALVE AND VALVE BOX | Each | 1 | | 513 | HYDROSTATIC PRESSURE TESTING AND DISINFECTION | Lump-Sum | 1 | | 520 | (8 inch X 6 inch) TAPPING SLEEVE | Each | 1 | | 601 | SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) | Linear Foot/Feet | 377 | | 601 | SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) | Linear Foot/Feet | 1418 | | 602 | SEWER SERVICE CONNECTION | Each | 1 | | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 30 | | 604 | ABANDONING SEWER | Cubic Yard | 39 | | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | | 613 | DEFLECTION TEST (<24 inch) | Lump-Sum | 1 | | 614 | TELEVISION INSPECTION (CCTV) (POST CONST.) | Linear Foot/Feet | 2367 | | 615 | SEWER LEAK TEST (<24 inch) | Lump-Sum | 1 | | 616 | (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 3 | | 616 | (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 9 | | 616 | (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 1 | | 616 | (4 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 21 | | 616 | (5 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 124 | | 616 | (6 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 10 | | 616 | MANHOLE DROP CONNECTION | Each | 2 | | 618 | SANITARY SEWER MANHOLE REHABILITATION | Vertical Feet | 21 | | 629 | ABANDONING MANHOLE | Each | 4 | | 635 | STEEL CASING PIPE (CARRIER SIZE 8 inch) | Linear Foot/Feet | 60 | | 635 | BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) | Linear Foot/Feet | 512 | | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | | 809 | MOBILIZATION | Lump-Sum | 1 | | 811 | STRUCTURE REMOVAL (MANHOLE) | Each | 2 | | 811 | STRUCTURE REMOVAL (BOLLARDS) | Each | 4 | | 823 | SIDEWALK REMOVAL | Square Yard | 50 | | 814 | PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) | Square Yard | 19 | | 814 | PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) | Square Yard | 77 | | 823 | SIDEWALK (4 inch) | Square Yard | 31 | | 823 | CURB RAMP (8 inch) | Square Yard | 16 | | 823 | TACTILE WARNING DEVICE | Square Foot/Feet | 30 | | 823 | CLASS C CONCRETE | Cubic Yard | 26 | | 829 | CURB AND GUTTER | Linear Foot/Feet | 52 | | 829 | INTEGRAL CURB | Linear Foot/Feet | 27 | | 838 | TEMPORARY EROSION CONTROL | Lump-Sum | 1 | | 840 | SOLID SLAB SODDING | Square Yard | 6750 | | SPEC. | DEMOLISH LIFT STATION (SP) | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Code Description UOM Qty | | 109 COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 212 TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) Linear Foot/Feet 50 212 TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) Linear Foot/Feet 387 212 TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) Linear Foot/Feet 541 212 TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) Linear Foot/Feet 877 501 (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) Linear Foot/Feet 4 507 FIRE HYDRANT Each 1 508 REMOVAL OF FIRE HYDRANT Each 1 512 (6 inch) (TAPPING) VALVE AND VALVE BOX Each 1 513 HYDROSTATIC PRESSURE TESTING AND DISINFECTION Lump-Sum 1 520 (8 inch X 6 inch) TAPPING SLEEVE Each 1 601 SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) Linear Foot/Feet 377 601 SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) Linear Foot/Feet 1418 602 SEWER SERVICE CONNECTION Each 1 603 SEWER SERVICE LINE Linear Foot/Feet 30 604 ABANDONING SEWER Cubic Yard 39 608 SEWER FLOW CONTROL Lump-Sum 1 613 DEFLECTION TEST (<24 inch) Lump-Sum 1 614 TELEVISION INSPECTION (CCTV) (POST CONST.) Linear Foot/Feet 2367 615 SEWER LEAK TEST (<24 inch) Lump-Sum 1 616 (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 3 616 (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 9 616 (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) Each 1 616 (4 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 21 616 (5 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 124 616 (6 ft.) EXTRA DEPTH MANHOLE WALL Vertical Feet 10 616 MANHOLE DROP CONNECTION Each 2 618 SANITARY SEWER MANHOLE REHABILITATION Vertical Feet 21 629 ABANDONING MANHOLE Each 4 635 STEEL CASING PIPE (CARRIER SIZE 8 inch) Linear Foot/Feet 60 635 BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) Linear Foot/Feet 512 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 809 MOBILIZATION Lump-Sum 1 811 STRUCTURE REMOVAL (MANHOLE) Each 2 811 STRUCTURE REMOVAL (BOLLARDS) Each 4 823 SIDEWALK REMOVAL Square Yard 50 814 PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) Square Yard 19 814 PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) Square Yard 77 823 SIDEWALK (4 inch) Square Yard 31 823 CURB RAMP (8 inch) Square Yard 16 823 TACTILE WARNING DEVICE Square Foot/Feet 30 823 CLASS C CONCRETE Cubic Yard 26 829 CURB AND GUTTER Linear Foot/Feet 52 829 INTEGRAL CURB Linear Foot/Feet 27 838 TEMPORARY EROSION CONTROL Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6750 SPEC. DEMOLISH LIFT STATION (SP) Lump-Sum 1 | 109 | COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) | Lump-Sum | 1 | 204 | CLEARING AND GRUBBING | Lump-Sum | 1 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) | Linear Foot/Feet | 50 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) | Linear Foot/Feet | 387 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) | Linear Foot/Feet | 541 | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) | Linear Foot/Feet | 877 | 501 | (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) | Linear Foot/Feet | 4 | 507 | FIRE HYDRANT | Each | 1 | 508 | REMOVAL OF FIRE HYDRANT | Each | 1 | 512 | (6 inch) (TAPPING) VALVE AND VALVE BOX | Each | 1 | 513 | HYDROSTATIC PRESSURE TESTING AND DISINFECTION | Lump-Sum | 1 | 520 | (8 inch X 6 inch) TAPPING SLEEVE | Each | 1 | 601 | SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) | Linear Foot/Feet | 377 | 601 | SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) | Linear Foot/Feet | 1418 | 602 | SEWER SERVICE CONNECTION | Each | 1 | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 30 | 604 | ABANDONING SEWER | Cubic Yard | 39 | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | 613 | DEFLECTION TEST (<24 inch) | Lump-Sum | 1 | 614 | TELEVISION INSPECTION (CCTV) (POST CONST.) | Linear Foot/Feet | 2367 | 615 | SEWER LEAK TEST (<24 inch) | Lump-Sum | 1 | 616 | (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 3 | 616 | (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 9 | 616 | (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 1 | 616 | (4 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 21 | 616 | (5 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 124 | 616 | (6 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 10 | 616 | MANHOLE DROP CONNECTION | Each | 2 | 618 | SANITARY SEWER MANHOLE REHABILITATION | Vertical Feet | 21 | 629 | ABANDONING MANHOLE | Each | 4 | 635 | STEEL CASING PIPE (CARRIER SIZE 8 inch) | Linear Foot/Feet | 60 | 635 | BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) | Linear Foot/Feet | 512 | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | 809 | MOBILIZATION | Lump-Sum | 1 | 811 | STRUCTURE REMOVAL (MANHOLE) | Each | 2 | 811 | STRUCTURE REMOVAL (BOLLARDS) | Each | 4 | 823 | SIDEWALK REMOVAL | Square Yard | 50 | 814 | PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) | Square Yard | 19 | 814 | PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) | Square Yard | 77 | 823 | SIDEWALK (4 inch) | Square Yard | 31 | 823 | CURB RAMP (8 inch) | Square Yard | 16 | 823 | TACTILE WARNING DEVICE | Square Foot/Feet | 30 | 823 | CLASS C CONCRETE | Cubic Yard | 26 | 829 | CURB AND GUTTER | Linear Foot/Feet | 52 | 829 | INTEGRAL CURB | Linear Foot/Feet | 27 | 838 | TEMPORARY EROSION CONTROL | Lump-Sum | 1 | 840 | SOLID SLAB SODDING | Square Yard | 6750 | SPEC. | DEMOLISH LIFT STATION (SP) | Lump-Sum | 1 | | | 109 | COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) | Lump-Sum | 1 | | 204 | CLEARING AND GRUBBING | Lump-Sum | 1 | | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 10 ft.) | Linear Foot/Feet | 50 | | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 15 ft.) | Linear Foot/Feet | 387 | | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 20 ft.) | Linear Foot/Feet | 541 | | 212 | TRENCH EXCAVATION & BACKFILL (0 TO 25 ft.) | Linear Foot/Feet | 877 | | 501 | (6 inch) (PVC) WATERLINE PIPE (RESTRAINED JOINT) (DR-14) | Linear Foot/Feet | 4 | | 507 | FIRE HYDRANT | Each | 1 | | 508 | REMOVAL OF FIRE HYDRANT | Each | 1 | | 512 | (6 inch) (TAPPING) VALVE AND VALVE BOX | Each | 1 | | 513 | HYDROSTATIC PRESSURE TESTING AND DISINFECTION | Lump-Sum | 1 | | 520 | (8 inch X 6 inch) TAPPING SLEEVE | Each | 1 | | 601 | SANITARY SEWER PIPE (8 inch) (PVC) (SDR-26) | Linear Foot/Feet | 377 | | 601 | SANITARY SEWER PIPE (15 inch) (PVC) (SDR-26) | Linear Foot/Feet | 1418 | | 602 | SEWER SERVICE CONNECTION | Each | 1 | | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 30 | | 604 | ABANDONING SEWER | Cubic Yard | 39 | | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | | 613 | DEFLECTION TEST (<24 inch) | Lump-Sum | 1 | | 614 | TELEVISION INSPECTION (CCTV) (POST CONST.) | Linear Foot/Feet | 2367 | | 615 | SEWER LEAK TEST (<24 inch) | Lump-Sum | 1 | | 616 | (4 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 3 | | 616 | (5 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 9 | | 616 | (6 ft.) SANITARY SEWER MANHOLE (0-6 ft.) | Each | 1 | | 616 | (4 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 21 | | 616 | (5 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 124 | | 616 | (6 ft.) EXTRA DEPTH MANHOLE WALL | Vertical Feet | 10 | | 616 | MANHOLE DROP CONNECTION | Each | 2 | | 618 | SANITARY SEWER MANHOLE REHABILITATION | Vertical Feet | 21 | | 629 | ABANDONING MANHOLE | Each | 4 | | 635 | STEEL CASING PIPE (CARRIER SIZE 8 inch) | Linear Foot/Feet | 60 | | 635 | BORE AND STEEL ENCASEMENT (CARRIER SIZE 15 inch) | Linear Foot/Feet | 512 | | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | | 809 | MOBILIZATION | Lump-Sum | 1 | | 811 | STRUCTURE REMOVAL (MANHOLE) | Each | 2 | | 811 | STRUCTURE REMOVAL (BOLLARDS) | Each | 4 | | 823 | SIDEWALK REMOVAL | Square Yard | 50 | | 814 | PAVEMENT CUT AND PERMANENT REPAIR (ASPHALT) | Square Yard | 19 | | 814 | PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) | Square Yard | 77 | | 823 | SIDEWALK (4 inch) | Square Yard | 31 | | 823 | CURB RAMP (8 inch) | Square Yard | 16 | | 823 | TACTILE WARNING DEVICE | Square Foot/Feet | 30 | | 823 | CLASS C CONCRETE | Cubic Yard | 26 | | 829 | CURB AND GUTTER | Linear Foot/Feet | 52 | | 829 | INTEGRAL CURB | Linear Foot/Feet | 27 | | 838 | TEMPORARY EROSION CONTROL | Lump-Sum | 1 | | 840 | SOLID SLAB SODDING | Square Yard | 6750 | | SPEC. | DEMOLISH LIFT STATION (SP) | Lump-Sum | 1 | **Questions and Answers**: - Q1 Arrow Right Question: Allocated time for project How many contract days are this project? Arrow Right Answer: Unofficial answer: This contract will be for 180 calendar days (see NTB and page 4 of specs). The official answer will be via Addendum #1, scheduled for publication the week of 4/7/26. 03/25/2026 01:32 PM EDT 03/25/2026 02:03 PM EDT
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.