Active SLED Opportunity · OKLAHOMA · THE CITY OF OKLAHOMA CITY AND TRUSTS
AI Summary
The City of Oklahoma City seeks bids for sanitary sewer line replacement at four locations. Requires Wastewater Pipeline Contractor "C" prequalification. Mandatory pre-bid conference on July 30, 2026. Electronic bids due August 12, 2026.
Prequalification Requirement is Wastewater Pipeline Contractor “C”. OCWUT SC-1170, Sanitary Sewer Line Replacement, Four Locations **Project Type**: RFB - Request for Bid (Formal) **Source ID**: PU.MU.USA.2722754.C19106251 **Piggyback Contract**: No **Question Acceptance Deadline**: 08/04/2026 11:00 AM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: Oklahoma City Water Utilities Trust **Reference Number**: 0000429302 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Construction Business Relationship Affidavit | Attach Notarized Construction Business Relationship Affidavit | Yes | Yes | | Construction Anti Non-Collusion Affidavit | Attach Notarized Construction Anti-Collusion Affidavit | Yes | Yes | **Pre-Bidding Events**: Event: Prebid Conference | Date: 07/30/2026 03:00 PM EDT | Location: Utilities Department, 420 W. Main 5th Fl Conf Rm B-521, Oklahoma City, Oklahoma 73102 | Mandatory: True **Line Items**: | description | quantity | uom | |---|---|---| | Next 1-Base Bid Code Description UOM Qty 109 COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) Lump-Sum 1 109 SEDIMENT AND EROSION CONTROL Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 212 TRENCH EXCAVATION & BACKFILL (0 TO 15FT) Linear Foot/Feet 146 601 SANITARY SEWER PIPE (8IN) (PVC) (SDR-26) Linear Foot/Feet 190 605 TRENCHLESS CONSTRUCTION (12IN) Linear Foot/Feet 220 608 SEWER FLOW CONTROL Lump-Sum 1 609 PRE-CONSTRUCTION CLEANING AND TELEVISION INSPECTION (CCTV) Linear Foot/Feet 220 613 DEFLECTION TEST (<24IN) Linear Foot/Feet 410 614 POST-CONSTRUCTION CLEANING AND TELEVISION INSPECTION (CCTV) Linear Foot/Feet 410 615 SEWER LEAK TEST (<24IN) Linear Foot/Feet 410 616 (4FT) SANITARY SEWER MANHOLE (0-6FT) Each 1 616 (4FT) EXTRA DEPTH MANHOLE WALL Vertical Feet 4 616 (6FT) SANITARY SEWER MANHOLE (0-6FT) Each 1 616 (6FT) EXTRA DEPTH MANHOLE WALL Vertical Feet 9 616 REMOVING MANHOLE Each 2 616 INSIDE DROP CONNECTION Each 4 617 MANHOLE TESTING Each 6 618 SANITARY SEWER MANHOLE REHABILITATION (4-FT DIA) Vertical Feet 38 635 STEEL CASING PIPE BY OPEN TRENCH (8-IN CARRIER EXLUDING PIPE) Linear Foot/Feet 61 641 PIERS (TYPE I) Vertical Feet 12 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 809 MOBILIZATION Lump-Sum 1 825 TYPE VI GROUTED RIP RAP Square Yard 83 840 SOLID SLAB SODDING Square Yard 626 | 109.0 | Code Description UOM Qty | | Code Description UOM Qty | 109.0 | 109 COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) Lump-Sum 1 109 SEDIMENT AND EROSION CONTROL Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 212 TRENCH EXCAVATION & BACKFILL (0 TO 15FT) Linear Foot/Feet 146 601 SANITARY SEWER PIPE (8IN) (PVC) (SDR-26) Linear Foot/Feet 190 605 TRENCHLESS CONSTRUCTION (12IN) Linear Foot/Feet 220 608 SEWER FLOW CONTROL Lump-Sum 1 609 PRE-CONSTRUCTION CLEANING AND TELEVISION INSPECTION (CCTV) Linear Foot/Feet 220 613 DEFLECTION TEST (<24IN) Linear Foot/Feet 410 614 POST-CONSTRUCTION CLEANING AND TELEVISION INSPECTION (CCTV) Linear Foot/Feet 410 615 SEWER LEAK TEST (<24IN) Linear Foot/Feet 410 616 (4FT) SANITARY SEWER MANHOLE (0-6FT) Each 1 616 (4FT) EXTRA DEPTH MANHOLE WALL Vertical Feet 4 616 (6FT) SANITARY SEWER MANHOLE (0-6FT) Each 1 616 (6FT) EXTRA DEPTH MANHOLE WALL Vertical Feet 9 616 REMOVING MANHOLE Each 2 616 INSIDE DROP CONNECTION Each 4 617 MANHOLE TESTING Each 6 618 SANITARY SEWER MANHOLE REHABILITATION (4-FT DIA) Vertical Feet 38 635 STEEL CASING PIPE BY OPEN TRENCH (8-IN CARRIER EXLUDING PIPE) Linear Foot/Feet 61 641 PIERS (TYPE I) Vertical Feet 12 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 809 MOBILIZATION Lump-Sum 1 825 TYPE VI GROUTED RIP RAP Square Yard 83 840 SOLID SLAB SODDING Square Yard 626 | | 109 | | COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) | | COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION (RECORDED DIGITALLY ON DVD) | 1.0 | Lump-Sum | | SEDIMENT AND EROSION CONTROL | 1.0 | Lump-Sum | | CLEARING AND GRUBBING | 1.0 | Lump-Sum | | TRENCH EXCAVATION & BACKFILL (0 TO 15FT) | 146.0 | Linear Foot/Feet | | SANITARY SEWER PIPE (8IN) (PVC) (SDR-26) | 190.0 | Linear Foot/Feet | | TRENCHLESS CONSTRUCTION (12IN) | 220.0 | Linear Foot/Feet | | SEWER FLOW CONTROL | 1.0 | Lump-Sum | | PRE-CONSTRUCTION CLEANING AND TELEVISION INSPECTION (CCTV) | 220.0 | Linear Foot/Feet | | DEFLECTION TEST (<24IN) | 410.0 | Linear Foot/Feet | | POST-CONSTRUCTION CLEANING AND TELEVISION INSPECTION (CCTV) | 410.0 | Linear Foot/Feet | | SEWER LEAK TEST (<24IN) | 410.0 | Linear Foot/Feet | | (4FT) SANITARY SEWER MANHOLE (0-6FT) | 1.0 | Each | | (4FT) EXTRA DEPTH MANHOLE WALL | 4.0 | Vertical Feet | | (6FT) SANITARY SEWER MANHOLE (0-6FT) | 1.0 | Each | | (6FT) EXTRA DEPTH MANHOLE WALL | 9.0 | Vertical Feet | | REMOVING MANHOLE | 2.0 | Each | | INSIDE DROP CONNECTION | 4.0 | Each | | MANHOLE TESTING | 6.0 | Each | | SANITARY SEWER MANHOLE REHABILITATION (4-FT DIA) | 38.0 | Vertical Feet | | STEEL CASING PIPE BY OPEN TRENCH (8-IN CARRIER EXLUDING PIPE) | 61.0 | Linear Foot/Feet | | PIERS (TYPE I) | 12.0 | Vertical Feet | | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | 1.0 | Lump-Sum | | GPS "AS-BUILT" SURVEY | 1.0 | Lump-Sum | | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | 1.0 | Lump-Sum | | MOBILIZATION | 1.0 | Lump-Sum | | TYPE VI GROUTED RIP RAP | 83.0 | Square Yard | | SOLID SLAB SODDING | 626.0 | Square Yard |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.