Active SLED Opportunity · OKLAHOMA · THE CITY OF OKLAHOMA CITY AND TRUSTS

    Sanitary Sewer Rehabilitation

    Issued by The City of Oklahoma City and Trusts
    cityRFBThe City of Oklahoma City and TrustsSol. 8776701257
    Open · 13d remaining
    DAYS TO CLOSE
    13
    due May 27, 2026
    PUBLISHED
    May 6, 2026
    Posting date
    JURISDICTION
    The City
    city
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    The City of Oklahoma City seeks bids for sanitary sewer rehabilitation including trenchless construction, sewer service connections, CCTV inspections, and manhole rehabilitation. Mandatory pre-bid conference on May 14, 2026. Electronic bids due by May 27, 2026.

    Opportunity details

    Solicitation No.
    8776701257
    Type / RFx
    RFB
    Status
    Active
    Level
    city
    Published Date
    May 6, 2026
    Due Date
    May 27, 2026
    NAICS Code
    237110AI guide
    Agency
    The City of Oklahoma City and Trusts

    Description

    Prequallification Requirement is Wastewater Pipeline Contractor “C” OCWUT SC-1125, Sanitary Sewer Rehabilitation, SW 48th Street to SW 56th Street between Pennsylvania Avenue and Blackwelder Avenue **Project Type**: RFB - Request for Bid (Formal) **Source ID**: PU.MU.USA.2722754.C19106251 **Piggyback Contract**: No **Question Acceptance Deadline**: 05/19/2026 01:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: Oklahoma City Water Utilities Trust **Reference Number**: 0000421361 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Construction Business Relationship Affidavit | Attach Notarized Construction Business Relationship Affidavit | Yes | Yes | | Construction Anti Non-Collusion Affidavit | Attach Notarized Construction Anti-Collusion Affidavit | Yes | Yes | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Mandatory | Event date: 05/14/2026 11:30 AM EDT | Location: Utilities Department, 420 W Main St, 5th Floor, Conference Room B, Oklahoma City, Oklahoma 73102 | Event Note: 103.01.03 – MANDATORY PRE-BID CONFERENCE103.01.03.01 When specified in the Notice to Bidder, attendance at the Pre-Bid Conference is a prequalification requirement. If there is a virtual meeting option, the virtual address will be provided in the Notice to Bidders. When the Notice to Bidders specifies that the Pre-Bid Conference is mandatory, the contractor who plans to submit a bid must attend the Mandatory Pre Bid Conference. Failure of the prospective bidders to attend a Mandatory Pre-Bid Conference will cause the bidder’s submission to be rejected. Whenever required, a Mandatory Pre-Bid Conference is a prequalification requirement to bid on the contract. **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Project 1 Next Base Bid-SC-1125 Code Description UOM Qty 109 COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION Lump-Sum 1 212 TRENCH EXCAVATION AND BACKFILL (0'-10') Linear Foot/Feet 27 602 SEWER SERVICE CONNECTION Each 73 603 SEWER SERVICE LINE Linear Foot/Feet 730 604 ABANDONING SEWER Cubic Yard 9 605 TRENCHLESS CONSTRUCTION (8") Linear Foot/Feet 2363 605 TRENCHLESS CONSTRUCTION (10") Linear Foot/Feet 330 605 TRENCHLESS CONSTRUCTION (12") Linear Foot/Feet 1066 608 SEWER FLOW CONTROL Lump-Sum 1 609 PRECONSTRUCTION AND CLEANING (CCTV) Linear Foot/Feet 3567 612 POINT REPAIR Each 2 613 DEFLECTION TEST (8") Lump-Sum 1 614 POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) Linear Foot/Feet 3786 615 SEWER LEAKAGE TEST (<24") Lump-Sum 1 616 (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') Each 1 616 MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) Each 1 617 MANHOLE TESTING Each 1 618 SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) Vertical Feet 140 633 POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) Linear Foot/Feet 27 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 810 CLEARING AND GRUBBING Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6000 900 SILT FENCE Linear Foot/Feet 4830 | Next Base Bid-SC-1125 Code Description UOM Qty 109 COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION Lump-Sum 1 212 TRENCH EXCAVATION AND BACKFILL (0'-10') Linear Foot/Feet 27 602 SEWER SERVICE CONNECTION Each 73 603 SEWER SERVICE LINE Linear Foot/Feet 730 604 ABANDONING SEWER Cubic Yard 9 605 TRENCHLESS CONSTRUCTION (8") Linear Foot/Feet 2363 605 TRENCHLESS CONSTRUCTION (10") Linear Foot/Feet 330 605 TRENCHLESS CONSTRUCTION (12") Linear Foot/Feet 1066 608 SEWER FLOW CONTROL Lump-Sum 1 609 PRECONSTRUCTION AND CLEANING (CCTV) Linear Foot/Feet 3567 612 POINT REPAIR Each 2 613 DEFLECTION TEST (8") Lump-Sum 1 614 POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) Linear Foot/Feet 3786 615 SEWER LEAKAGE TEST (<24") Lump-Sum 1 616 (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') Each 1 616 MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) Each 1 617 MANHOLE TESTING Each 1 618 SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) Vertical Feet 140 633 POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) Linear Foot/Feet 27 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 810 CLEARING AND GRUBBING Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6000 900 SILT FENCE Linear Foot/Feet 4830 | Code Description UOM Qty | 109 COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION Lump-Sum 1 212 TRENCH EXCAVATION AND BACKFILL (0'-10') Linear Foot/Feet 27 602 SEWER SERVICE CONNECTION Each 73 603 SEWER SERVICE LINE Linear Foot/Feet 730 604 ABANDONING SEWER Cubic Yard 9 605 TRENCHLESS CONSTRUCTION (8") Linear Foot/Feet 2363 605 TRENCHLESS CONSTRUCTION (10") Linear Foot/Feet 330 605 TRENCHLESS CONSTRUCTION (12") Linear Foot/Feet 1066 608 SEWER FLOW CONTROL Lump-Sum 1 609 PRECONSTRUCTION AND CLEANING (CCTV) Linear Foot/Feet 3567 612 POINT REPAIR Each 2 613 DEFLECTION TEST (8") Lump-Sum 1 614 POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) Linear Foot/Feet 3786 615 SEWER LEAKAGE TEST (<24") Lump-Sum 1 616 (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') Each 1 616 MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) Each 1 617 MANHOLE TESTING Each 1 618 SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) Vertical Feet 140 633 POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) Linear Foot/Feet 27 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 810 CLEARING AND GRUBBING Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6000 900 SILT FENCE Linear Foot/Feet 4830 | 109 | COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION | Lump-Sum | 1 | 212 | TRENCH EXCAVATION AND BACKFILL (0'-10') | Linear Foot/Feet | 27 | 602 | SEWER SERVICE CONNECTION | Each | 73 | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 730 | 604 | ABANDONING SEWER | Cubic Yard | 9 | 605 | TRENCHLESS CONSTRUCTION (8") | Linear Foot/Feet | 2363 | 605 | TRENCHLESS CONSTRUCTION (10") | Linear Foot/Feet | 330 | 605 | TRENCHLESS CONSTRUCTION (12") | Linear Foot/Feet | 1066 | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | 609 | PRECONSTRUCTION AND CLEANING (CCTV) | Linear Foot/Feet | 3567 | 612 | POINT REPAIR | Each | 2 | 613 | DEFLECTION TEST (8") | Lump-Sum | 1 | 614 | POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) | Linear Foot/Feet | 3786 | 615 | SEWER LEAKAGE TEST (<24") | Lump-Sum | 1 | 616 | (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') | Each | 1 | 616 | MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) | Each | 1 | 617 | MANHOLE TESTING | Each | 1 | 618 | SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) | Vertical Feet | 140 | 633 | POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) | Linear Foot/Feet | 27 | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | 810 | CLEARING AND GRUBBING | Lump-Sum | 1 | 840 | SOLID SLAB SODDING | Square Yard | 6000 | 900 | SILT FENCE | Linear Foot/Feet | 4830 | | | | Next Base Bid-SC-1125 Code Description UOM Qty 109 COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION Lump-Sum 1 212 TRENCH EXCAVATION AND BACKFILL (0'-10') Linear Foot/Feet 27 602 SEWER SERVICE CONNECTION Each 73 603 SEWER SERVICE LINE Linear Foot/Feet 730 604 ABANDONING SEWER Cubic Yard 9 605 TRENCHLESS CONSTRUCTION (8") Linear Foot/Feet 2363 605 TRENCHLESS CONSTRUCTION (10") Linear Foot/Feet 330 605 TRENCHLESS CONSTRUCTION (12") Linear Foot/Feet 1066 608 SEWER FLOW CONTROL Lump-Sum 1 609 PRECONSTRUCTION AND CLEANING (CCTV) Linear Foot/Feet 3567 612 POINT REPAIR Each 2 613 DEFLECTION TEST (8") Lump-Sum 1 614 POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) Linear Foot/Feet 3786 615 SEWER LEAKAGE TEST (<24") Lump-Sum 1 616 (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') Each 1 616 MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) Each 1 617 MANHOLE TESTING Each 1 618 SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) Vertical Feet 140 633 POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) Linear Foot/Feet 27 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 810 CLEARING AND GRUBBING Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6000 900 SILT FENCE Linear Foot/Feet 4830 | Code Description UOM Qty | 109 COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION Lump-Sum 1 212 TRENCH EXCAVATION AND BACKFILL (0'-10') Linear Foot/Feet 27 602 SEWER SERVICE CONNECTION Each 73 603 SEWER SERVICE LINE Linear Foot/Feet 730 604 ABANDONING SEWER Cubic Yard 9 605 TRENCHLESS CONSTRUCTION (8") Linear Foot/Feet 2363 605 TRENCHLESS CONSTRUCTION (10") Linear Foot/Feet 330 605 TRENCHLESS CONSTRUCTION (12") Linear Foot/Feet 1066 608 SEWER FLOW CONTROL Lump-Sum 1 609 PRECONSTRUCTION AND CLEANING (CCTV) Linear Foot/Feet 3567 612 POINT REPAIR Each 2 613 DEFLECTION TEST (8") Lump-Sum 1 614 POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) Linear Foot/Feet 3786 615 SEWER LEAKAGE TEST (<24") Lump-Sum 1 616 (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') Each 1 616 MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) Each 1 617 MANHOLE TESTING Each 1 618 SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) Vertical Feet 140 633 POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) Linear Foot/Feet 27 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 810 CLEARING AND GRUBBING Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6000 900 SILT FENCE Linear Foot/Feet 4830 | 109 | COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION | Lump-Sum | 1 | 212 | TRENCH EXCAVATION AND BACKFILL (0'-10') | Linear Foot/Feet | 27 | 602 | SEWER SERVICE CONNECTION | Each | 73 | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 730 | 604 | ABANDONING SEWER | Cubic Yard | 9 | 605 | TRENCHLESS CONSTRUCTION (8") | Linear Foot/Feet | 2363 | 605 | TRENCHLESS CONSTRUCTION (10") | Linear Foot/Feet | 330 | 605 | TRENCHLESS CONSTRUCTION (12") | Linear Foot/Feet | 1066 | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | 609 | PRECONSTRUCTION AND CLEANING (CCTV) | Linear Foot/Feet | 3567 | 612 | POINT REPAIR | Each | 2 | 613 | DEFLECTION TEST (8") | Lump-Sum | 1 | 614 | POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) | Linear Foot/Feet | 3786 | 615 | SEWER LEAKAGE TEST (<24") | Lump-Sum | 1 | 616 | (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') | Each | 1 | 616 | MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) | Each | 1 | 617 | MANHOLE TESTING | Each | 1 | 618 | SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) | Vertical Feet | 140 | 633 | POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) | Linear Foot/Feet | 27 | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | 810 | CLEARING AND GRUBBING | Lump-Sum | 1 | 840 | SOLID SLAB SODDING | Square Yard | 6000 | 900 | SILT FENCE | Linear Foot/Feet | 4830 | | | Code Description UOM Qty | | 109 COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION Lump-Sum 1 212 TRENCH EXCAVATION AND BACKFILL (0'-10') Linear Foot/Feet 27 602 SEWER SERVICE CONNECTION Each 73 603 SEWER SERVICE LINE Linear Foot/Feet 730 604 ABANDONING SEWER Cubic Yard 9 605 TRENCHLESS CONSTRUCTION (8") Linear Foot/Feet 2363 605 TRENCHLESS CONSTRUCTION (10") Linear Foot/Feet 330 605 TRENCHLESS CONSTRUCTION (12") Linear Foot/Feet 1066 608 SEWER FLOW CONTROL Lump-Sum 1 609 PRECONSTRUCTION AND CLEANING (CCTV) Linear Foot/Feet 3567 612 POINT REPAIR Each 2 613 DEFLECTION TEST (8") Lump-Sum 1 614 POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) Linear Foot/Feet 3786 615 SEWER LEAKAGE TEST (<24") Lump-Sum 1 616 (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') Each 1 616 MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) Each 1 617 MANHOLE TESTING Each 1 618 SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) Vertical Feet 140 633 POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) Linear Foot/Feet 27 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 810 CLEARING AND GRUBBING Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6000 900 SILT FENCE Linear Foot/Feet 4830 | 109 | COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION | Lump-Sum | 1 | 212 | TRENCH EXCAVATION AND BACKFILL (0'-10') | Linear Foot/Feet | 27 | 602 | SEWER SERVICE CONNECTION | Each | 73 | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 730 | 604 | ABANDONING SEWER | Cubic Yard | 9 | 605 | TRENCHLESS CONSTRUCTION (8") | Linear Foot/Feet | 2363 | 605 | TRENCHLESS CONSTRUCTION (10") | Linear Foot/Feet | 330 | 605 | TRENCHLESS CONSTRUCTION (12") | Linear Foot/Feet | 1066 | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | 609 | PRECONSTRUCTION AND CLEANING (CCTV) | Linear Foot/Feet | 3567 | 612 | POINT REPAIR | Each | 2 | 613 | DEFLECTION TEST (8") | Lump-Sum | 1 | 614 | POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) | Linear Foot/Feet | 3786 | 615 | SEWER LEAKAGE TEST (<24") | Lump-Sum | 1 | 616 | (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') | Each | 1 | 616 | MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) | Each | 1 | 617 | MANHOLE TESTING | Each | 1 | 618 | SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) | Vertical Feet | 140 | 633 | POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) | Linear Foot/Feet | 27 | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | 810 | CLEARING AND GRUBBING | Lump-Sum | 1 | 840 | SOLID SLAB SODDING | Square Yard | 6000 | 900 | SILT FENCE | Linear Foot/Feet | 4830 | | | 109 | COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION | Lump-Sum | 1 | | 212 | TRENCH EXCAVATION AND BACKFILL (0'-10') | Linear Foot/Feet | 27 | | 602 | SEWER SERVICE CONNECTION | Each | 73 | | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 730 | | 604 | ABANDONING SEWER | Cubic Yard | 9 | | 605 | TRENCHLESS CONSTRUCTION (8") | Linear Foot/Feet | 2363 | | 605 | TRENCHLESS CONSTRUCTION (10") | Linear Foot/Feet | 330 | | 605 | TRENCHLESS CONSTRUCTION (12") | Linear Foot/Feet | 1066 | | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | | 609 | PRECONSTRUCTION AND CLEANING (CCTV) | Linear Foot/Feet | 3567 | | 612 | POINT REPAIR | Each | 2 | | 613 | DEFLECTION TEST (8") | Lump-Sum | 1 | | 614 | POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) | Linear Foot/Feet | 3786 | | 615 | SEWER LEAKAGE TEST (<24") | Lump-Sum | 1 | | 616 | (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') | Each | 1 | | 616 | MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) | Each | 1 | | 617 | MANHOLE TESTING | Each | 1 | | 618 | SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) | Vertical Feet | 140 | | 633 | POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) | Linear Foot/Feet | 27 | | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | | 810 | CLEARING AND GRUBBING | Lump-Sum | 1 | | 840 | SOLID SLAB SODDING | Square Yard | 6000 | | 900 | SILT FENCE | Linear Foot/Feet | 4830 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Base Bid-SC-1125 Code Description UOM Qty 109 COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION Lump-Sum 1 212 TRENCH EXCAVATION AND BACKFILL (0'-10') Linear Foot/Feet 27 602 SEWER SERVICE CONNECTION Each 73 603 SEWER SERVICE LINE Linear Foot/Feet 730 604 ABANDONING SEWER Cubic Yard 9 605 TRENCHLESS CONSTRUCTION (8") Linear Foot/Feet 2363 605 TRENCHLESS CONSTRUCTION (10") Linear Foot/Feet 330 605 TRENCHLESS CONSTRUCTION (12") Linear Foot/Feet 1066 608 SEWER FLOW CONTROL Lump-Sum 1 609 PRECONSTRUCTION AND CLEANING (CCTV) Linear Foot/Feet 3567 612 POINT REPAIR Each 2 613 DEFLECTION TEST (8") Lump-Sum 1 614 POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) Linear Foot/Feet 3786 615 SEWER LEAKAGE TEST (<24") Lump-Sum 1 616 (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') Each 1 616 MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) Each 1 617 MANHOLE TESTING Each 1 618 SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) Vertical Feet 140 633 POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) Linear Foot/Feet 27 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 810 CLEARING AND GRUBBING Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6000 900 SILT FENCE Linear Foot/Feet 4830 | Code Description UOM Qty | 109 COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION Lump-Sum 1 212 TRENCH EXCAVATION AND BACKFILL (0'-10') Linear Foot/Feet 27 602 SEWER SERVICE CONNECTION Each 73 603 SEWER SERVICE LINE Linear Foot/Feet 730 604 ABANDONING SEWER Cubic Yard 9 605 TRENCHLESS CONSTRUCTION (8") Linear Foot/Feet 2363 605 TRENCHLESS CONSTRUCTION (10") Linear Foot/Feet 330 605 TRENCHLESS CONSTRUCTION (12") Linear Foot/Feet 1066 608 SEWER FLOW CONTROL Lump-Sum 1 609 PRECONSTRUCTION AND CLEANING (CCTV) Linear Foot/Feet 3567 612 POINT REPAIR Each 2 613 DEFLECTION TEST (8") Lump-Sum 1 614 POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) Linear Foot/Feet 3786 615 SEWER LEAKAGE TEST (<24") Lump-Sum 1 616 (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') Each 1 616 MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) Each 1 617 MANHOLE TESTING Each 1 618 SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) Vertical Feet 140 633 POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) Linear Foot/Feet 27 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 810 CLEARING AND GRUBBING Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6000 900 SILT FENCE Linear Foot/Feet 4830 | 109 | COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION | Lump-Sum | 1 | 212 | TRENCH EXCAVATION AND BACKFILL (0'-10') | Linear Foot/Feet | 27 | 602 | SEWER SERVICE CONNECTION | Each | 73 | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 730 | 604 | ABANDONING SEWER | Cubic Yard | 9 | 605 | TRENCHLESS CONSTRUCTION (8") | Linear Foot/Feet | 2363 | 605 | TRENCHLESS CONSTRUCTION (10") | Linear Foot/Feet | 330 | 605 | TRENCHLESS CONSTRUCTION (12") | Linear Foot/Feet | 1066 | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | 609 | PRECONSTRUCTION AND CLEANING (CCTV) | Linear Foot/Feet | 3567 | 612 | POINT REPAIR | Each | 2 | 613 | DEFLECTION TEST (8") | Lump-Sum | 1 | 614 | POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) | Linear Foot/Feet | 3786 | 615 | SEWER LEAKAGE TEST (<24") | Lump-Sum | 1 | 616 | (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') | Each | 1 | 616 | MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) | Each | 1 | 617 | MANHOLE TESTING | Each | 1 | 618 | SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) | Vertical Feet | 140 | 633 | POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) | Linear Foot/Feet | 27 | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | 810 | CLEARING AND GRUBBING | Lump-Sum | 1 | 840 | SOLID SLAB SODDING | Square Yard | 6000 | 900 | SILT FENCE | Linear Foot/Feet | 4830 | | | Code Description UOM Qty | | 109 COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION Lump-Sum 1 212 TRENCH EXCAVATION AND BACKFILL (0'-10') Linear Foot/Feet 27 602 SEWER SERVICE CONNECTION Each 73 603 SEWER SERVICE LINE Linear Foot/Feet 730 604 ABANDONING SEWER Cubic Yard 9 605 TRENCHLESS CONSTRUCTION (8") Linear Foot/Feet 2363 605 TRENCHLESS CONSTRUCTION (10") Linear Foot/Feet 330 605 TRENCHLESS CONSTRUCTION (12") Linear Foot/Feet 1066 608 SEWER FLOW CONTROL Lump-Sum 1 609 PRECONSTRUCTION AND CLEANING (CCTV) Linear Foot/Feet 3567 612 POINT REPAIR Each 2 613 DEFLECTION TEST (8") Lump-Sum 1 614 POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) Linear Foot/Feet 3786 615 SEWER LEAKAGE TEST (<24") Lump-Sum 1 616 (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') Each 1 616 MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) Each 1 617 MANHOLE TESTING Each 1 618 SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) Vertical Feet 140 633 POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) Linear Foot/Feet 27 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 810 CLEARING AND GRUBBING Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6000 900 SILT FENCE Linear Foot/Feet 4830 | 109 | COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION | Lump-Sum | 1 | 212 | TRENCH EXCAVATION AND BACKFILL (0'-10') | Linear Foot/Feet | 27 | 602 | SEWER SERVICE CONNECTION | Each | 73 | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 730 | 604 | ABANDONING SEWER | Cubic Yard | 9 | 605 | TRENCHLESS CONSTRUCTION (8") | Linear Foot/Feet | 2363 | 605 | TRENCHLESS CONSTRUCTION (10") | Linear Foot/Feet | 330 | 605 | TRENCHLESS CONSTRUCTION (12") | Linear Foot/Feet | 1066 | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | 609 | PRECONSTRUCTION AND CLEANING (CCTV) | Linear Foot/Feet | 3567 | 612 | POINT REPAIR | Each | 2 | 613 | DEFLECTION TEST (8") | Lump-Sum | 1 | 614 | POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) | Linear Foot/Feet | 3786 | 615 | SEWER LEAKAGE TEST (<24") | Lump-Sum | 1 | 616 | (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') | Each | 1 | 616 | MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) | Each | 1 | 617 | MANHOLE TESTING | Each | 1 | 618 | SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) | Vertical Feet | 140 | 633 | POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) | Linear Foot/Feet | 27 | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | 810 | CLEARING AND GRUBBING | Lump-Sum | 1 | 840 | SOLID SLAB SODDING | Square Yard | 6000 | 900 | SILT FENCE | Linear Foot/Feet | 4830 | | | 109 | COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION | Lump-Sum | 1 | | 212 | TRENCH EXCAVATION AND BACKFILL (0'-10') | Linear Foot/Feet | 27 | | 602 | SEWER SERVICE CONNECTION | Each | 73 | | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 730 | | 604 | ABANDONING SEWER | Cubic Yard | 9 | | 605 | TRENCHLESS CONSTRUCTION (8") | Linear Foot/Feet | 2363 | | 605 | TRENCHLESS CONSTRUCTION (10") | Linear Foot/Feet | 330 | | 605 | TRENCHLESS CONSTRUCTION (12") | Linear Foot/Feet | 1066 | | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | | 609 | PRECONSTRUCTION AND CLEANING (CCTV) | Linear Foot/Feet | 3567 | | 612 | POINT REPAIR | Each | 2 | | 613 | DEFLECTION TEST (8") | Lump-Sum | 1 | | 614 | POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) | Linear Foot/Feet | 3786 | | 615 | SEWER LEAKAGE TEST (<24") | Lump-Sum | 1 | | 616 | (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') | Each | 1 | | 616 | MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) | Each | 1 | | 617 | MANHOLE TESTING | Each | 1 | | 618 | SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) | Vertical Feet | 140 | | 633 | POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) | Linear Foot/Feet | 27 | | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | | 810 | CLEARING AND GRUBBING | Lump-Sum | 1 | | 840 | SOLID SLAB SODDING | Square Yard | 6000 | | 900 | SILT FENCE | Linear Foot/Feet | 4830 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Code Description UOM Qty | | 109 COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION Lump-Sum 1 212 TRENCH EXCAVATION AND BACKFILL (0'-10') Linear Foot/Feet 27 602 SEWER SERVICE CONNECTION Each 73 603 SEWER SERVICE LINE Linear Foot/Feet 730 604 ABANDONING SEWER Cubic Yard 9 605 TRENCHLESS CONSTRUCTION (8") Linear Foot/Feet 2363 605 TRENCHLESS CONSTRUCTION (10") Linear Foot/Feet 330 605 TRENCHLESS CONSTRUCTION (12") Linear Foot/Feet 1066 608 SEWER FLOW CONTROL Lump-Sum 1 609 PRECONSTRUCTION AND CLEANING (CCTV) Linear Foot/Feet 3567 612 POINT REPAIR Each 2 613 DEFLECTION TEST (8") Lump-Sum 1 614 POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) Linear Foot/Feet 3786 615 SEWER LEAKAGE TEST (<24") Lump-Sum 1 616 (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') Each 1 616 MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) Each 1 617 MANHOLE TESTING Each 1 618 SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) Vertical Feet 140 633 POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) Linear Foot/Feet 27 801 CONSTRUCTION STAKING (CONSTRUCTION SURVEY) Lump-Sum 1 801 GPS "AS-BUILT" SURVEY Lump-Sum 1 802 CONSTRUCTION SIGNING AND TRAFFIC CONTROL Lump-Sum 1 810 CLEARING AND GRUBBING Lump-Sum 1 840 SOLID SLAB SODDING Square Yard 6000 900 SILT FENCE Linear Foot/Feet 4830 | 109 | COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION | Lump-Sum | 1 | 212 | TRENCH EXCAVATION AND BACKFILL (0'-10') | Linear Foot/Feet | 27 | 602 | SEWER SERVICE CONNECTION | Each | 73 | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 730 | 604 | ABANDONING SEWER | Cubic Yard | 9 | 605 | TRENCHLESS CONSTRUCTION (8") | Linear Foot/Feet | 2363 | 605 | TRENCHLESS CONSTRUCTION (10") | Linear Foot/Feet | 330 | 605 | TRENCHLESS CONSTRUCTION (12") | Linear Foot/Feet | 1066 | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | 609 | PRECONSTRUCTION AND CLEANING (CCTV) | Linear Foot/Feet | 3567 | 612 | POINT REPAIR | Each | 2 | 613 | DEFLECTION TEST (8") | Lump-Sum | 1 | 614 | POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) | Linear Foot/Feet | 3786 | 615 | SEWER LEAKAGE TEST (<24") | Lump-Sum | 1 | 616 | (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') | Each | 1 | 616 | MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) | Each | 1 | 617 | MANHOLE TESTING | Each | 1 | 618 | SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) | Vertical Feet | 140 | 633 | POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) | Linear Foot/Feet | 27 | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | 810 | CLEARING AND GRUBBING | Lump-Sum | 1 | 840 | SOLID SLAB SODDING | Square Yard | 6000 | 900 | SILT FENCE | Linear Foot/Feet | 4830 | | | 109 | COLOR AUDIO/VIDEO RECORDING, PRE AND POST CONSTRUCTION | Lump-Sum | 1 | | 212 | TRENCH EXCAVATION AND BACKFILL (0'-10') | Linear Foot/Feet | 27 | | 602 | SEWER SERVICE CONNECTION | Each | 73 | | 603 | SEWER SERVICE LINE | Linear Foot/Feet | 730 | | 604 | ABANDONING SEWER | Cubic Yard | 9 | | 605 | TRENCHLESS CONSTRUCTION (8") | Linear Foot/Feet | 2363 | | 605 | TRENCHLESS CONSTRUCTION (10") | Linear Foot/Feet | 330 | | 605 | TRENCHLESS CONSTRUCTION (12") | Linear Foot/Feet | 1066 | | 608 | SEWER FLOW CONTROL | Lump-Sum | 1 | | 609 | PRECONSTRUCTION AND CLEANING (CCTV) | Linear Foot/Feet | 3567 | | 612 | POINT REPAIR | Each | 2 | | 613 | DEFLECTION TEST (8") | Lump-Sum | 1 | | 614 | POST-CONSTRUCTION TELEVISION INSPECTION (CCTV) | Linear Foot/Feet | 3786 | | 615 | SEWER LEAKAGE TEST (<24") | Lump-Sum | 1 | | 616 | (4' DIAMETER) SANITARY SEWER MANHOLE (0'-6') | Each | 1 | | 616 | MANHOLE FRAME AND LID REPLACEMENT (ON REHABILITATED MANHOLE) | Each | 1 | | 617 | MANHOLE TESTING | Each | 1 | | 618 | SANITARY SEWER MANHOLE REHABILITATION (4' MANHOLE) | Vertical Feet | 140 | | 633 | POLYVINYL CHLORIDE (PVC)(8 INCH)(SDR 35) | Linear Foot/Feet | 27 | | 801 | CONSTRUCTION STAKING (CONSTRUCTION SURVEY) | Lump-Sum | 1 | | 801 | GPS "AS-BUILT" SURVEY | Lump-Sum | 1 | | 802 | CONSTRUCTION SIGNING AND TRAFFIC CONTROL | Lump-Sum | 1 | | 810 | CLEARING AND GRUBBING | Lump-Sum | 1 | | 840 | SOLID SLAB SODDING | Square Yard | 6000 | | 900 | SILT FENCE | Linear Foot/Feet | 4830 |

    Key dates

    1. May 6, 2026Published
    2. May 27, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.