SLED Opportunity · CONNECTICUT · CONNECTICUT AIRPORT AUTHORITY
AI Summary
Sanitary sewer replacement project at Bradley International Airport involving removal and installation of an 8-inch sewer line, manholes, trenchless installation, site restoration, and traffic control. Completion within 49 days.
The project consists of: The replacement of an existing failing 8-inch clay sewer pipe. Work includes removal of the existing pipe and associated manholes, followed by abandonment of the old line using Controlled Low-Strength Material (CLSM). A new 8-inch sewer line-approximately 1,060 linear feet in length-will be installed along the existing airport fence line. Construction activities include trenchless installation beneath the Genesee & Wyoming Railroad, concrete-encased pipe installation beneath a future Taxiway, and the placement of three new manholes and two doghouse structures to connect to existing infrastructure. Site restoration and environmental protection measures are incorporated into the project, including erosion and sedimentation controls, trench pavement restoration, limited pavement marking, and loaming and seeding of disturbed areas. Traffic control measures will be implemented throughout the duration of the work to maintain safe operations. The contract time for completion of all work is within forty nine (49) calendar days from the date specified in the "Notice to Proceed".
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.