Installation of 1,325 linear feet of 8-inch ductile iron water main pipe on Schoolmaster Lane, Dedham, MA, including culvert crossing with steel casing pipe and concrete piers. Project runs from 100 Schoolmaster Lane to Country Club Road.
The work consists of installation of approximately 1,325 linear feet of 8-inch ductile iron pipe, on Schoolmaster Lane in Dedham. The project will run from 100 Schoolmaster Lane to Country Club Road connecting to existing water mains at each end. Work also includes an above grade pier supported culvert crossing including but not limited to 18-inch steel casing pipe, concrete piers, pre-insulated 8-inch ductile iron pipe, and other ancillary items. Pre Bid Conference: N/A
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.