SLED Opportunity · OREGON · CITY OF CORVALLIS (OR)
AI Summary
City of Corvallis seeks contractors for sewer and storm pipe replacement involving pipe bursting and open cut methods, including HDPE pipe installation, lateral reconnections, and related infrastructure work. Estimated cost approximately $970,000.
The work consists of all labor, equipment, and materials necessary to: • Pipe burst approximately 340 linear feet existing 10-inch concrete sewer/storm combination line and replacement with 10-inch HDPE pipe (Sch. A). • Pipe burst approximately 1466 linear feet existing 8-inch concrete sewer line and replacement with 8-inch HDPE pipe (Sch. B, C, D, E). • Open cut approximately 200 linear feet 8-inch ductile iron storm pipe and pipe bursting approximately 300 linear feet existing 8-inch concrete storm and replacement with 8-inch HDPE pipe (Sch F). • Video inspecting, locating and reconnecting, replacing or rerouting sewer service and storm drain laterals by open cut or pipe bursting, removal/construction of sewer and/or storm manholes, cleanouts, and catch basins, removal and replacement of sidewalks, driveways, asphalt paving, curb, and constructing required appurtenances and other work as shown on the plans. The Engineering estimate is $580,000 (Sch. A, B, C, and D), $175,000 (Sch. E), and $215,000 (Sch. F). The Prime Contractor shall provide a copy of their licensed installer documentation verifying that they are a licensed installer of the manufacturer’s pipe bursting system.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.