Construction of a shared-use pathway and a prefabricated pedestrian bridge in Bennington, VT. Bidders must be pre-qualified by VTRANS. Project follows Vermont Agency of Transportation 2018 standards.
Ninja Path – Phase 2 Stage 2– Bennington STP BP(15) 2 & Bennington TAP TA22(9): Construction of a shared-use pathway starting from the southern end of Hannaford Square Plaza and continuing to a connection point at the existing Ninja Path at the Vermont 279 overpass and the construction of one prefabricated galvanized pedestrian bridge. All bidders shall be on the current VTRANS Contract Administration pre-qualified list “Contractors List of Bike and/or Pedestrian Path, Bridge Construction Category” VT Agency of Transportation 2018 Standard Specifications for Construction shall apply to this contract. Owner: Town of Bennington Bennington Town Office 205 South Street Bennington, VT 05201
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.