SLED Opportunity · FLORIDA · MIAMI DADE STRATEGIC PROCUREMENT DEPARTMENT
AI Summary
Installation of four ceiling fans and electrical improvements including new receptacles and fire alarm system at Shed E warehouse and kennel area, PortMiami.
The Work consists of furnishing all materials, labor, and equipment necessary to install four (4) ceiling fans within the warehouse area of Shed E at PortMiami. The project also includes the installation of three (3) new electrical receptacles, along with all associated electrical work, at the kennel location. The Work includes, but is not limited to, the following: • Installation of supplemental structural steel spanning between existing precast joists to support four (4) new large ceiling fans. • Removal of the existing photocell located in panel “R,” including conductors, conduits, and accessories, back to the source. • Removal of four (4) existing exterior disconnects, including associated receptacles, conductors, conduits, and accessories, back to the source. • Removal of four (4) existing breakers in panel “R” feeding the exterior disconnects. • Removal of receptacles and breakers providing power to the existing conveyor in panel “P3W,” circuits 8, 10, and 12. • Removal of four (4) existing 208V, 3-phase, 5-wire receptacles; cap wires and install blank covers. • Patching of all holes left after removal of existing equipment. • Three (3) new receptacles shall be installed near the kennel area and circuited to panel “P3W.” • Each receptacle shall be provided with a 20A, 1-pole breaker, individual neutrals, and approximately 100 feet of 3/4-inch EMT with steel set-screw fittings. Existing conduits may be reused where suitable. • Four (4) new 16-foot ceiling fans shall be installed and circuited back to panel “R.” • Each fan shall be provided with a 25A, 3-pole breaker in panel “R.” • Fan circuits shall utilize 3/4-inch EMT with steel set-screw fittings. • A fan controller shall be installed at a location to be determined by the Owner in coordination • with the end user, CBP. • Provide and install a new fire alarm system in full compliance with NFPA 101, NFPA 72, and all current requirements of the Authority Having Jurisdiction (AHJ). All work shall be performed in accordance with the Contract Documents.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.