SLED Opportunity · IOWA · IOWA
AI Summary
Shoreline restoration project at East Okoboji Lake including tree clearing, stump grinding, coir log installation, riprap armoring, seeding, and mulching. Requires environmental permits. Bids close January 22, 2026.
This project is located on the shore of East Okoboji Lake at Isthmus Park and the Spirit Lake Fish Hatchery. It includes tree and brush clearing, stump grinding in Isthmus Park, 860 linear (shoreline) feet of coir logs, and 222 tons of shoreline riprap armoring. It includes 1.5 acres of turf grass seeding, 1 acre of native seeding and 2.5 acres of mulching. A NPDES Permit #2 and SWPPP are required. Project documents, including plans, specifications, proposal forms, and addenda for this project are available at Beeline and Blue, 2507 Ingersoll Ave, Des Moines, IA 50312. Please visit www.beelineandblue.com or contact (515) 244-1611 for more information. PROJECT ENGINEER: Jeff Felts CONTACT: 515-250-3712 or jeff.felts@dnr.iowa.gov BID CLOSING DATE AND TIME: 1/22/2026 AT 11:00 AM CST
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.