SLED Opportunity · NEW YORK · NEW YORK
AI Summary
Construction of a 250-foot long, 6-foot wide pressure treated wood boardwalk with wood framed stairs and concrete foundation in Perry Village, NY, starting Summer 2026.
The work will consist of furnishing all necessary labor, materials and equipment required for the installation of a boardwalk from the Village parking lot on Main Street to Borden Avenue. The work includes two sets of wood framed stairs on each end and a 6-foot wide, approximately 250-foot length boardwalk, made of pressure treated wood (posts, structure, railings, composite decking and foundation/concrete work required to complete the construction as shown on the plans, specified herein and directed by the Engineer.) Target construction start date would be Summer 2026. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.