Active SLED Opportunity · SOUTH CAROLINA · HORRY COUNTY GOVERNMENT
AI Summary
Horry County Government seeks bids for a comprehensive single family home rehabilitation at 90 11th Ave, Aynor, SC. The project includes window installation, flooring, cabinetry, plumbing, electrical, HVAC, ADA ramp construction, and painting. Mandatory pre-bid conference on April 23, 2026. Electronic bid submission due May 4, 2026.
Horry County Government is seeking bidders for single family rehabilitation home improvements at 90 11th Ave. Aynor, SC 29511. **Project Type**: IFB - Invitation for Bid (Formal) **Source ID**: PU.MU.USA.715279.C19521451 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/28/2026 02:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: Community Development **Reference Number**: 0000420200 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Required Forms | Required Form Packet | Yes | No | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Mandatory | Event date: 04/23/2026 10:00 AM EDT | Location: 90 11th Ave. Aynor, SC 29511 | Event Note: Non attendies will not be able to submit a bid **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Project 1 Next HOME-90 11th Ave Code Description UOM Qty Windows-2 Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Windows-3 Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Crawl Space-4 Materials to install CMU piers with poured footers Unit 10 Crawl Space-5 Labor to install CMU piers with poured footers Unit 10 Crawl Space-6 Materials to remove and install new vinyl underpinning , use vented panels as required Linear Foot/Feet 140 Crawl Space-7 Labor to remove and install new vinyl underpinning, use vented panels as required Linear Foot/Feet 140 Back Entry-8 Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Back Entry-9 Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Kitchen/Utility Rm-10 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-11 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-12 Materials to install treated 2"x10"x16' treated floor joists , 16" o/c Unit 14 Kitchen/Utility Rm-13 Labor to install treated 2"x10"x16' treated floor joists, 16" o/c Unit 14 Kitchen/Utility Rm-14 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-15 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-16 Materials to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-17 Labor to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-18 Materials to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-19 Labor to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-20 Materials to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-21 Labor to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-22 Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-23 Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-24 Materials to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-25 Labor to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-26 Materials to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-27 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-28 Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover Square Foot/Feet 608 Kitchen/Utility Rm-29 Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover Square Foot/Feet 608 Bathroom-30 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-31 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-32 Materials to install 2"x10"x16' treated floor joists Unit 8 Bathroom-33 Labor to install 2"x10"x16' treated floor joists Unit 8 Bathroom-34 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 42 Bathroom-35 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 42 Bathroom-36 Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-37 Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-38 Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-39 Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-40 Materials to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-41 Labor to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-42 Materials to install vinyl plank flooring Square Foot/Feet 42 Bathroom-43 Labor to install vinyl plank flooring Square Foot/Feet 42 Bathroom-44 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 26 Bathroom-45 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 26 Bathroom-46 Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-47 Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-48 Materials to prep and paint walls and base board , apply sufficient coats to cover Square Foot/Feet 208 Bathroom-49 Labor to prep and paint walls and base board apply sufficient coats to cover Square Foot/Feet 208 Back Bedroom-50 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-51 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-52 Materials to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-53 Labor to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-54 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 182 Back Bedroom-55 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 182 Back Bedroom-56 Materials to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-57 Labor to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-58 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 54 Back Bedrdoom-59 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Electrical-60 Materials to install a 200 amp interior breaker panel with breakers, as per current code Unit 1 Electrical-61 Labor to install a 200 amp breaker panel with breakers, as per current code Unit 1 Electrical-62 Materials to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Electrical-63 Labor to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Heating&Air-64 Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code Unit 1 Heating&Air-65 Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code Unit 1 Heating&Air-66 Materials to install 2 ton duct work, to include ceiling registers Unit 1 Heating&Air-67 Labor to install 2 ton duct work to include ceiling registers Unit 1 Heating&Air-68 Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-69 Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-70 Materials to install copper line set with cover Unit 1 Heating&Air-71 Labor to install copper line set with cover Unit 1 Plumbing-72 Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping Unit 1 Plumbing-73 Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping Unit 1 General Conditions-74 Materials to provide storage container/pod for homeowners belongings during construction Unit 1 General Conditions-75 Materials to provide trash removal Unit 1 General Conditions-76 Materials to provide a Porta-John Unit 1 General Conditions-77 Materials to provide a Permit Unit 1 | Next HOME-90 11th Ave Code Description UOM Qty Windows-2 Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Windows-3 Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Crawl Space-4 Materials to install CMU piers with poured footers Unit 10 Crawl Space-5 Labor to install CMU piers with poured footers Unit 10 Crawl Space-6 Materials to remove and install new vinyl underpinning , use vented panels as required Linear Foot/Feet 140 Crawl Space-7 Labor to remove and install new vinyl underpinning, use vented panels as required Linear Foot/Feet 140 Back Entry-8 Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Back Entry-9 Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Kitchen/Utility Rm-10 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-11 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-12 Materials to install treated 2"x10"x16' treated floor joists , 16" o/c Unit 14 Kitchen/Utility Rm-13 Labor to install treated 2"x10"x16' treated floor joists, 16" o/c Unit 14 Kitchen/Utility Rm-14 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-15 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-16 Materials to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-17 Labor to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-18 Materials to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-19 Labor to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-20 Materials to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-21 Labor to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-22 Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-23 Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-24 Materials to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-25 Labor to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-26 Materials to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-27 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-28 Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover Square Foot/Feet 608 Kitchen/Utility Rm-29 Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover Square Foot/Feet 608 Bathroom-30 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-31 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-32 Materials to install 2"x10"x16' treated floor joists Unit 8 Bathroom-33 Labor to install 2"x10"x16' treated floor joists Unit 8 Bathroom-34 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 42 Bathroom-35 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 42 Bathroom-36 Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-37 Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-38 Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-39 Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-40 Materials to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-41 Labor to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-42 Materials to install vinyl plank flooring Square Foot/Feet 42 Bathroom-43 Labor to install vinyl plank flooring Square Foot/Feet 42 Bathroom-44 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 26 Bathroom-45 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 26 Bathroom-46 Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-47 Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-48 Materials to prep and paint walls and base board , apply sufficient coats to cover Square Foot/Feet 208 Bathroom-49 Labor to prep and paint walls and base board apply sufficient coats to cover Square Foot/Feet 208 Back Bedroom-50 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-51 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-52 Materials to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-53 Labor to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-54 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 182 Back Bedroom-55 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 182 Back Bedroom-56 Materials to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-57 Labor to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-58 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 54 Back Bedrdoom-59 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Electrical-60 Materials to install a 200 amp interior breaker panel with breakers, as per current code Unit 1 Electrical-61 Labor to install a 200 amp breaker panel with breakers, as per current code Unit 1 Electrical-62 Materials to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Electrical-63 Labor to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Heating&Air-64 Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code Unit 1 Heating&Air-65 Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code Unit 1 Heating&Air-66 Materials to install 2 ton duct work, to include ceiling registers Unit 1 Heating&Air-67 Labor to install 2 ton duct work to include ceiling registers Unit 1 Heating&Air-68 Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-69 Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-70 Materials to install copper line set with cover Unit 1 Heating&Air-71 Labor to install copper line set with cover Unit 1 Plumbing-72 Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping Unit 1 Plumbing-73 Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping Unit 1 General Conditions-74 Materials to provide storage container/pod for homeowners belongings during construction Unit 1 General Conditions-75 Materials to provide trash removal Unit 1 General Conditions-76 Materials to provide a Porta-John Unit 1 General Conditions-77 Materials to provide a Permit Unit 1 | Code Description UOM Qty | Windows-2 Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Windows-3 Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Crawl Space-4 Materials to install CMU piers with poured footers Unit 10 Crawl Space-5 Labor to install CMU piers with poured footers Unit 10 Crawl Space-6 Materials to remove and install new vinyl underpinning , use vented panels as required Linear Foot/Feet 140 Crawl Space-7 Labor to remove and install new vinyl underpinning, use vented panels as required Linear Foot/Feet 140 Back Entry-8 Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Back Entry-9 Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Kitchen/Utility Rm-10 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-11 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-12 Materials to install treated 2"x10"x16' treated floor joists , 16" o/c Unit 14 Kitchen/Utility Rm-13 Labor to install treated 2"x10"x16' treated floor joists, 16" o/c Unit 14 Kitchen/Utility Rm-14 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-15 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-16 Materials to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-17 Labor to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-18 Materials to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-19 Labor to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-20 Materials to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-21 Labor to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-22 Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-23 Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-24 Materials to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-25 Labor to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-26 Materials to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-27 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-28 Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover Square Foot/Feet 608 Kitchen/Utility Rm-29 Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover Square Foot/Feet 608 Bathroom-30 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-31 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-32 Materials to install 2"x10"x16' treated floor joists Unit 8 Bathroom-33 Labor to install 2"x10"x16' treated floor joists Unit 8 Bathroom-34 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 42 Bathroom-35 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 42 Bathroom-36 Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-37 Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-38 Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-39 Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-40 Materials to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-41 Labor to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-42 Materials to install vinyl plank flooring Square Foot/Feet 42 Bathroom-43 Labor to install vinyl plank flooring Square Foot/Feet 42 Bathroom-44 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 26 Bathroom-45 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 26 Bathroom-46 Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-47 Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-48 Materials to prep and paint walls and base board , apply sufficient coats to cover Square Foot/Feet 208 Bathroom-49 Labor to prep and paint walls and base board apply sufficient coats to cover Square Foot/Feet 208 Back Bedroom-50 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-51 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-52 Materials to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-53 Labor to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-54 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 182 Back Bedroom-55 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 182 Back Bedroom-56 Materials to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-57 Labor to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-58 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 54 Back Bedrdoom-59 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Electrical-60 Materials to install a 200 amp interior breaker panel with breakers, as per current code Unit 1 Electrical-61 Labor to install a 200 amp breaker panel with breakers, as per current code Unit 1 Electrical-62 Materials to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Electrical-63 Labor to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Heating&Air-64 Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code Unit 1 Heating&Air-65 Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code Unit 1 Heating&Air-66 Materials to install 2 ton duct work, to include ceiling registers Unit 1 Heating&Air-67 Labor to install 2 ton duct work to include ceiling registers Unit 1 Heating&Air-68 Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-69 Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-70 Materials to install copper line set with cover Unit 1 Heating&Air-71 Labor to install copper line set with cover Unit 1 Plumbing-72 Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping Unit 1 Plumbing-73 Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping Unit 1 General Conditions-74 Materials to provide storage container/pod for homeowners belongings during construction Unit 1 General Conditions-75 Materials to provide trash removal Unit 1 General Conditions-76 Materials to provide a Porta-John Unit 1 General Conditions-77 Materials to provide a Permit Unit 1 | Windows-2 | Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | Windows-3 | Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | Crawl Space-4 | Materials to install CMU piers with poured footers | Unit | 10 | Crawl Space-5 | Labor to install CMU piers with poured footers | Unit | 10 | Crawl Space-6 | Materials to remove and install new vinyl underpinning , use vented panels as required | Linear Foot/Feet | 140 | Crawl Space-7 | Labor to remove and install new vinyl underpinning, use vented panels as required | Linear Foot/Feet | 140 | Back Entry-8 | Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | Back Entry-9 | Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | Kitchen/Utility Rm-10 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | Kitchen/Utility Rm-11 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | Kitchen/Utility Rm-12 | Materials to install treated 2"x10"x16' treated floor joists , 16" o/c | Unit | 14 | Kitchen/Utility Rm-13 | Labor to install treated 2"x10"x16' treated floor joists, 16" o/c | Unit | 14 | Kitchen/Utility Rm-14 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 176 | Kitchen/Utility Rm-15 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 176 | Kitchen/Utility Rm-16 | Materials to install pre finished base cabinets | Linear Foot/Feet | 8 | Kitchen/Utility Rm-17 | Labor to install pre finished base cabinets | Linear Foot/Feet | 8 | Kitchen/Utility Rm-18 | Materials to install pre finished wall cabinets | Linear Foot/Feet | 4 | Kitchen/Utility Rm-19 | Labor to install pre finished wall cabinets | Linear Foot/Feet | 4 | Kitchen/Utility Rm-20 | Materials to install laminate countertops | Linear Foot/Feet | 8 | Kitchen/Utility Rm-21 | Labor to install laminate countertops | Linear Foot/Feet | 8 | Kitchen/Utility Rm-22 | Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | Kitchen/Utility Rm-23 | Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | Kitchen/Utility Rm-24 | Materials to install vinyl plank flooring | Square Foot/Feet | 176 | Kitchen/Utility Rm-25 | Labor to install vinyl plank flooring | Square Foot/Feet | 176 | Kitchen/Utility Rm-26 | Materials to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Kitchen/Utility Rm-27 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Kitchen/Utility Rm-28 | Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover | Square Foot/Feet | 608 | Kitchen/Utility Rm-29 | Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover | Square Foot/Feet | 608 | Bathroom-30 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | Bathroom-31 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | Bathroom-32 | Materials to install 2"x10"x16' treated floor joists | Unit | 8 | Bathroom-33 | Labor to install 2"x10"x16' treated floor joists | Unit | 8 | Bathroom-34 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 42 | Bathroom-35 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 42 | Bathroom-36 | Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | Bathroom-37 | Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | Bathroom-38 | Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | Bathroom-39 | Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | Bathroom-40 | Materials to install a comfort height commode, include new wax ring and supply line | Unit | 1 | Bathroom-41 | Labor to install a comfort height commode, include new wax ring and supply line | Unit | 1 | Bathroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 42 | Bathroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 42 | Bathroom-44 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 26 | Bathroom-45 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 26 | Bathroom-46 | Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | Bathroom-47 | Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | Bathroom-48 | Materials to prep and paint walls and base board , apply sufficient coats to cover | Square Foot/Feet | 208 | Bathroom-49 | Labor to prep and paint walls and base board apply sufficient coats to cover | Square Foot/Feet | 208 | Back Bedroom-50 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | Back Bedroom-51 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | Back Bedroom-52 | Materials to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | Back Bedroom-53 | Labor to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | Back Bedroom-54 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 182 | Back Bedroom-55 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 182 | Back Bedroom-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 182 | Back Bedroom-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 182 | Back Bedroom-58 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 54 | Back Bedrdoom-59 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Electrical-60 | Materials to install a 200 amp interior breaker panel with breakers, as per current code | Unit | 1 | Electrical-61 | Labor to install a 200 amp breaker panel with breakers, as per current code | Unit | 1 | Electrical-62 | Materials to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | Electrical-63 | Labor to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | Heating&Air-64 | Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code | Unit | 1 | Heating&Air-65 | Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code | Unit | 1 | Heating&Air-66 | Materials to install 2 ton duct work, to include ceiling registers | Unit | 1 | Heating&Air-67 | Labor to install 2 ton duct work to include ceiling registers | Unit | 1 | Heating&Air-68 | Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | Heating&Air-69 | Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | Heating&Air-70 | Materials to install copper line set with cover | Unit | 1 | Heating&Air-71 | Labor to install copper line set with cover | Unit | 1 | Plumbing-72 | Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping | Unit | 1 | Plumbing-73 | Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping | Unit | 1 | General Conditions-74 | Materials to provide storage container/pod for homeowners belongings during construction | Unit | 1 | General Conditions-75 | Materials to provide trash removal | Unit | 1 | General Conditions-76 | Materials to provide a Porta-John | Unit | 1 | General Conditions-77 | Materials to provide a Permit | Unit | 1 | | | | Next HOME-90 11th Ave Code Description UOM Qty Windows-2 Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Windows-3 Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Crawl Space-4 Materials to install CMU piers with poured footers Unit 10 Crawl Space-5 Labor to install CMU piers with poured footers Unit 10 Crawl Space-6 Materials to remove and install new vinyl underpinning , use vented panels as required Linear Foot/Feet 140 Crawl Space-7 Labor to remove and install new vinyl underpinning, use vented panels as required Linear Foot/Feet 140 Back Entry-8 Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Back Entry-9 Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Kitchen/Utility Rm-10 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-11 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-12 Materials to install treated 2"x10"x16' treated floor joists , 16" o/c Unit 14 Kitchen/Utility Rm-13 Labor to install treated 2"x10"x16' treated floor joists, 16" o/c Unit 14 Kitchen/Utility Rm-14 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-15 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-16 Materials to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-17 Labor to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-18 Materials to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-19 Labor to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-20 Materials to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-21 Labor to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-22 Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-23 Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-24 Materials to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-25 Labor to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-26 Materials to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-27 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-28 Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover Square Foot/Feet 608 Kitchen/Utility Rm-29 Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover Square Foot/Feet 608 Bathroom-30 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-31 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-32 Materials to install 2"x10"x16' treated floor joists Unit 8 Bathroom-33 Labor to install 2"x10"x16' treated floor joists Unit 8 Bathroom-34 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 42 Bathroom-35 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 42 Bathroom-36 Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-37 Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-38 Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-39 Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-40 Materials to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-41 Labor to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-42 Materials to install vinyl plank flooring Square Foot/Feet 42 Bathroom-43 Labor to install vinyl plank flooring Square Foot/Feet 42 Bathroom-44 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 26 Bathroom-45 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 26 Bathroom-46 Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-47 Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-48 Materials to prep and paint walls and base board , apply sufficient coats to cover Square Foot/Feet 208 Bathroom-49 Labor to prep and paint walls and base board apply sufficient coats to cover Square Foot/Feet 208 Back Bedroom-50 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-51 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-52 Materials to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-53 Labor to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-54 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 182 Back Bedroom-55 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 182 Back Bedroom-56 Materials to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-57 Labor to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-58 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 54 Back Bedrdoom-59 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Electrical-60 Materials to install a 200 amp interior breaker panel with breakers, as per current code Unit 1 Electrical-61 Labor to install a 200 amp breaker panel with breakers, as per current code Unit 1 Electrical-62 Materials to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Electrical-63 Labor to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Heating&Air-64 Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code Unit 1 Heating&Air-65 Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code Unit 1 Heating&Air-66 Materials to install 2 ton duct work, to include ceiling registers Unit 1 Heating&Air-67 Labor to install 2 ton duct work to include ceiling registers Unit 1 Heating&Air-68 Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-69 Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-70 Materials to install copper line set with cover Unit 1 Heating&Air-71 Labor to install copper line set with cover Unit 1 Plumbing-72 Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping Unit 1 Plumbing-73 Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping Unit 1 General Conditions-74 Materials to provide storage container/pod for homeowners belongings during construction Unit 1 General Conditions-75 Materials to provide trash removal Unit 1 General Conditions-76 Materials to provide a Porta-John Unit 1 General Conditions-77 Materials to provide a Permit Unit 1 | Code Description UOM Qty | Windows-2 Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Windows-3 Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Crawl Space-4 Materials to install CMU piers with poured footers Unit 10 Crawl Space-5 Labor to install CMU piers with poured footers Unit 10 Crawl Space-6 Materials to remove and install new vinyl underpinning , use vented panels as required Linear Foot/Feet 140 Crawl Space-7 Labor to remove and install new vinyl underpinning, use vented panels as required Linear Foot/Feet 140 Back Entry-8 Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Back Entry-9 Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Kitchen/Utility Rm-10 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-11 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-12 Materials to install treated 2"x10"x16' treated floor joists , 16" o/c Unit 14 Kitchen/Utility Rm-13 Labor to install treated 2"x10"x16' treated floor joists, 16" o/c Unit 14 Kitchen/Utility Rm-14 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-15 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-16 Materials to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-17 Labor to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-18 Materials to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-19 Labor to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-20 Materials to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-21 Labor to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-22 Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-23 Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-24 Materials to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-25 Labor to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-26 Materials to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-27 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-28 Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover Square Foot/Feet 608 Kitchen/Utility Rm-29 Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover Square Foot/Feet 608 Bathroom-30 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-31 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-32 Materials to install 2"x10"x16' treated floor joists Unit 8 Bathroom-33 Labor to install 2"x10"x16' treated floor joists Unit 8 Bathroom-34 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 42 Bathroom-35 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 42 Bathroom-36 Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-37 Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-38 Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-39 Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-40 Materials to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-41 Labor to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-42 Materials to install vinyl plank flooring Square Foot/Feet 42 Bathroom-43 Labor to install vinyl plank flooring Square Foot/Feet 42 Bathroom-44 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 26 Bathroom-45 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 26 Bathroom-46 Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-47 Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-48 Materials to prep and paint walls and base board , apply sufficient coats to cover Square Foot/Feet 208 Bathroom-49 Labor to prep and paint walls and base board apply sufficient coats to cover Square Foot/Feet 208 Back Bedroom-50 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-51 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-52 Materials to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-53 Labor to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-54 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 182 Back Bedroom-55 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 182 Back Bedroom-56 Materials to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-57 Labor to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-58 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 54 Back Bedrdoom-59 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Electrical-60 Materials to install a 200 amp interior breaker panel with breakers, as per current code Unit 1 Electrical-61 Labor to install a 200 amp breaker panel with breakers, as per current code Unit 1 Electrical-62 Materials to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Electrical-63 Labor to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Heating&Air-64 Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code Unit 1 Heating&Air-65 Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code Unit 1 Heating&Air-66 Materials to install 2 ton duct work, to include ceiling registers Unit 1 Heating&Air-67 Labor to install 2 ton duct work to include ceiling registers Unit 1 Heating&Air-68 Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-69 Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-70 Materials to install copper line set with cover Unit 1 Heating&Air-71 Labor to install copper line set with cover Unit 1 Plumbing-72 Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping Unit 1 Plumbing-73 Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping Unit 1 General Conditions-74 Materials to provide storage container/pod for homeowners belongings during construction Unit 1 General Conditions-75 Materials to provide trash removal Unit 1 General Conditions-76 Materials to provide a Porta-John Unit 1 General Conditions-77 Materials to provide a Permit Unit 1 | Windows-2 | Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | Windows-3 | Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | Crawl Space-4 | Materials to install CMU piers with poured footers | Unit | 10 | Crawl Space-5 | Labor to install CMU piers with poured footers | Unit | 10 | Crawl Space-6 | Materials to remove and install new vinyl underpinning , use vented panels as required | Linear Foot/Feet | 140 | Crawl Space-7 | Labor to remove and install new vinyl underpinning, use vented panels as required | Linear Foot/Feet | 140 | Back Entry-8 | Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | Back Entry-9 | Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | Kitchen/Utility Rm-10 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | Kitchen/Utility Rm-11 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | Kitchen/Utility Rm-12 | Materials to install treated 2"x10"x16' treated floor joists , 16" o/c | Unit | 14 | Kitchen/Utility Rm-13 | Labor to install treated 2"x10"x16' treated floor joists, 16" o/c | Unit | 14 | Kitchen/Utility Rm-14 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 176 | Kitchen/Utility Rm-15 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 176 | Kitchen/Utility Rm-16 | Materials to install pre finished base cabinets | Linear Foot/Feet | 8 | Kitchen/Utility Rm-17 | Labor to install pre finished base cabinets | Linear Foot/Feet | 8 | Kitchen/Utility Rm-18 | Materials to install pre finished wall cabinets | Linear Foot/Feet | 4 | Kitchen/Utility Rm-19 | Labor to install pre finished wall cabinets | Linear Foot/Feet | 4 | Kitchen/Utility Rm-20 | Materials to install laminate countertops | Linear Foot/Feet | 8 | Kitchen/Utility Rm-21 | Labor to install laminate countertops | Linear Foot/Feet | 8 | Kitchen/Utility Rm-22 | Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | Kitchen/Utility Rm-23 | Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | Kitchen/Utility Rm-24 | Materials to install vinyl plank flooring | Square Foot/Feet | 176 | Kitchen/Utility Rm-25 | Labor to install vinyl plank flooring | Square Foot/Feet | 176 | Kitchen/Utility Rm-26 | Materials to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Kitchen/Utility Rm-27 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Kitchen/Utility Rm-28 | Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover | Square Foot/Feet | 608 | Kitchen/Utility Rm-29 | Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover | Square Foot/Feet | 608 | Bathroom-30 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | Bathroom-31 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | Bathroom-32 | Materials to install 2"x10"x16' treated floor joists | Unit | 8 | Bathroom-33 | Labor to install 2"x10"x16' treated floor joists | Unit | 8 | Bathroom-34 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 42 | Bathroom-35 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 42 | Bathroom-36 | Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | Bathroom-37 | Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | Bathroom-38 | Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | Bathroom-39 | Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | Bathroom-40 | Materials to install a comfort height commode, include new wax ring and supply line | Unit | 1 | Bathroom-41 | Labor to install a comfort height commode, include new wax ring and supply line | Unit | 1 | Bathroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 42 | Bathroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 42 | Bathroom-44 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 26 | Bathroom-45 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 26 | Bathroom-46 | Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | Bathroom-47 | Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | Bathroom-48 | Materials to prep and paint walls and base board , apply sufficient coats to cover | Square Foot/Feet | 208 | Bathroom-49 | Labor to prep and paint walls and base board apply sufficient coats to cover | Square Foot/Feet | 208 | Back Bedroom-50 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | Back Bedroom-51 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | Back Bedroom-52 | Materials to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | Back Bedroom-53 | Labor to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | Back Bedroom-54 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 182 | Back Bedroom-55 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 182 | Back Bedroom-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 182 | Back Bedroom-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 182 | Back Bedroom-58 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 54 | Back Bedrdoom-59 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Electrical-60 | Materials to install a 200 amp interior breaker panel with breakers, as per current code | Unit | 1 | Electrical-61 | Labor to install a 200 amp breaker panel with breakers, as per current code | Unit | 1 | Electrical-62 | Materials to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | Electrical-63 | Labor to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | Heating&Air-64 | Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code | Unit | 1 | Heating&Air-65 | Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code | Unit | 1 | Heating&Air-66 | Materials to install 2 ton duct work, to include ceiling registers | Unit | 1 | Heating&Air-67 | Labor to install 2 ton duct work to include ceiling registers | Unit | 1 | Heating&Air-68 | Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | Heating&Air-69 | Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | Heating&Air-70 | Materials to install copper line set with cover | Unit | 1 | Heating&Air-71 | Labor to install copper line set with cover | Unit | 1 | Plumbing-72 | Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping | Unit | 1 | Plumbing-73 | Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping | Unit | 1 | General Conditions-74 | Materials to provide storage container/pod for homeowners belongings during construction | Unit | 1 | General Conditions-75 | Materials to provide trash removal | Unit | 1 | General Conditions-76 | Materials to provide a Porta-John | Unit | 1 | General Conditions-77 | Materials to provide a Permit | Unit | 1 | | | Code Description UOM Qty | | Windows-2 Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Windows-3 Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Crawl Space-4 Materials to install CMU piers with poured footers Unit 10 Crawl Space-5 Labor to install CMU piers with poured footers Unit 10 Crawl Space-6 Materials to remove and install new vinyl underpinning , use vented panels as required Linear Foot/Feet 140 Crawl Space-7 Labor to remove and install new vinyl underpinning, use vented panels as required Linear Foot/Feet 140 Back Entry-8 Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Back Entry-9 Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Kitchen/Utility Rm-10 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-11 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-12 Materials to install treated 2"x10"x16' treated floor joists , 16" o/c Unit 14 Kitchen/Utility Rm-13 Labor to install treated 2"x10"x16' treated floor joists, 16" o/c Unit 14 Kitchen/Utility Rm-14 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-15 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-16 Materials to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-17 Labor to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-18 Materials to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-19 Labor to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-20 Materials to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-21 Labor to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-22 Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-23 Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-24 Materials to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-25 Labor to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-26 Materials to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-27 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-28 Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover Square Foot/Feet 608 Kitchen/Utility Rm-29 Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover Square Foot/Feet 608 Bathroom-30 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-31 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-32 Materials to install 2"x10"x16' treated floor joists Unit 8 Bathroom-33 Labor to install 2"x10"x16' treated floor joists Unit 8 Bathroom-34 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 42 Bathroom-35 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 42 Bathroom-36 Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-37 Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-38 Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-39 Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-40 Materials to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-41 Labor to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-42 Materials to install vinyl plank flooring Square Foot/Feet 42 Bathroom-43 Labor to install vinyl plank flooring Square Foot/Feet 42 Bathroom-44 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 26 Bathroom-45 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 26 Bathroom-46 Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-47 Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-48 Materials to prep and paint walls and base board , apply sufficient coats to cover Square Foot/Feet 208 Bathroom-49 Labor to prep and paint walls and base board apply sufficient coats to cover Square Foot/Feet 208 Back Bedroom-50 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-51 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-52 Materials to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-53 Labor to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-54 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 182 Back Bedroom-55 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 182 Back Bedroom-56 Materials to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-57 Labor to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-58 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 54 Back Bedrdoom-59 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Electrical-60 Materials to install a 200 amp interior breaker panel with breakers, as per current code Unit 1 Electrical-61 Labor to install a 200 amp breaker panel with breakers, as per current code Unit 1 Electrical-62 Materials to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Electrical-63 Labor to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Heating&Air-64 Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code Unit 1 Heating&Air-65 Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code Unit 1 Heating&Air-66 Materials to install 2 ton duct work, to include ceiling registers Unit 1 Heating&Air-67 Labor to install 2 ton duct work to include ceiling registers Unit 1 Heating&Air-68 Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-69 Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-70 Materials to install copper line set with cover Unit 1 Heating&Air-71 Labor to install copper line set with cover Unit 1 Plumbing-72 Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping Unit 1 Plumbing-73 Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping Unit 1 General Conditions-74 Materials to provide storage container/pod for homeowners belongings during construction Unit 1 General Conditions-75 Materials to provide trash removal Unit 1 General Conditions-76 Materials to provide a Porta-John Unit 1 General Conditions-77 Materials to provide a Permit Unit 1 | Windows-2 | Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | Windows-3 | Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | Crawl Space-4 | Materials to install CMU piers with poured footers | Unit | 10 | Crawl Space-5 | Labor to install CMU piers with poured footers | Unit | 10 | Crawl Space-6 | Materials to remove and install new vinyl underpinning , use vented panels as required | Linear Foot/Feet | 140 | Crawl Space-7 | Labor to remove and install new vinyl underpinning, use vented panels as required | Linear Foot/Feet | 140 | Back Entry-8 | Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | Back Entry-9 | Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | Kitchen/Utility Rm-10 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | Kitchen/Utility Rm-11 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | Kitchen/Utility Rm-12 | Materials to install treated 2"x10"x16' treated floor joists , 16" o/c | Unit | 14 | Kitchen/Utility Rm-13 | Labor to install treated 2"x10"x16' treated floor joists, 16" o/c | Unit | 14 | Kitchen/Utility Rm-14 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 176 | Kitchen/Utility Rm-15 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 176 | Kitchen/Utility Rm-16 | Materials to install pre finished base cabinets | Linear Foot/Feet | 8 | Kitchen/Utility Rm-17 | Labor to install pre finished base cabinets | Linear Foot/Feet | 8 | Kitchen/Utility Rm-18 | Materials to install pre finished wall cabinets | Linear Foot/Feet | 4 | Kitchen/Utility Rm-19 | Labor to install pre finished wall cabinets | Linear Foot/Feet | 4 | Kitchen/Utility Rm-20 | Materials to install laminate countertops | Linear Foot/Feet | 8 | Kitchen/Utility Rm-21 | Labor to install laminate countertops | Linear Foot/Feet | 8 | Kitchen/Utility Rm-22 | Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | Kitchen/Utility Rm-23 | Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | Kitchen/Utility Rm-24 | Materials to install vinyl plank flooring | Square Foot/Feet | 176 | Kitchen/Utility Rm-25 | Labor to install vinyl plank flooring | Square Foot/Feet | 176 | Kitchen/Utility Rm-26 | Materials to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Kitchen/Utility Rm-27 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Kitchen/Utility Rm-28 | Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover | Square Foot/Feet | 608 | Kitchen/Utility Rm-29 | Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover | Square Foot/Feet | 608 | Bathroom-30 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | Bathroom-31 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | Bathroom-32 | Materials to install 2"x10"x16' treated floor joists | Unit | 8 | Bathroom-33 | Labor to install 2"x10"x16' treated floor joists | Unit | 8 | Bathroom-34 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 42 | Bathroom-35 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 42 | Bathroom-36 | Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | Bathroom-37 | Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | Bathroom-38 | Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | Bathroom-39 | Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | Bathroom-40 | Materials to install a comfort height commode, include new wax ring and supply line | Unit | 1 | Bathroom-41 | Labor to install a comfort height commode, include new wax ring and supply line | Unit | 1 | Bathroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 42 | Bathroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 42 | Bathroom-44 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 26 | Bathroom-45 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 26 | Bathroom-46 | Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | Bathroom-47 | Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | Bathroom-48 | Materials to prep and paint walls and base board , apply sufficient coats to cover | Square Foot/Feet | 208 | Bathroom-49 | Labor to prep and paint walls and base board apply sufficient coats to cover | Square Foot/Feet | 208 | Back Bedroom-50 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | Back Bedroom-51 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | Back Bedroom-52 | Materials to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | Back Bedroom-53 | Labor to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | Back Bedroom-54 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 182 | Back Bedroom-55 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 182 | Back Bedroom-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 182 | Back Bedroom-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 182 | Back Bedroom-58 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 54 | Back Bedrdoom-59 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Electrical-60 | Materials to install a 200 amp interior breaker panel with breakers, as per current code | Unit | 1 | Electrical-61 | Labor to install a 200 amp breaker panel with breakers, as per current code | Unit | 1 | Electrical-62 | Materials to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | Electrical-63 | Labor to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | Heating&Air-64 | Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code | Unit | 1 | Heating&Air-65 | Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code | Unit | 1 | Heating&Air-66 | Materials to install 2 ton duct work, to include ceiling registers | Unit | 1 | Heating&Air-67 | Labor to install 2 ton duct work to include ceiling registers | Unit | 1 | Heating&Air-68 | Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | Heating&Air-69 | Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | Heating&Air-70 | Materials to install copper line set with cover | Unit | 1 | Heating&Air-71 | Labor to install copper line set with cover | Unit | 1 | Plumbing-72 | Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping | Unit | 1 | Plumbing-73 | Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping | Unit | 1 | General Conditions-74 | Materials to provide storage container/pod for homeowners belongings during construction | Unit | 1 | General Conditions-75 | Materials to provide trash removal | Unit | 1 | General Conditions-76 | Materials to provide a Porta-John | Unit | 1 | General Conditions-77 | Materials to provide a Permit | Unit | 1 | | | Windows-2 | Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | | Windows-3 | Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | | Crawl Space-4 | Materials to install CMU piers with poured footers | Unit | 10 | | Crawl Space-5 | Labor to install CMU piers with poured footers | Unit | 10 | | Crawl Space-6 | Materials to remove and install new vinyl underpinning , use vented panels as required | Linear Foot/Feet | 140 | | Crawl Space-7 | Labor to remove and install new vinyl underpinning, use vented panels as required | Linear Foot/Feet | 140 | | Back Entry-8 | Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | | Back Entry-9 | Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | | Kitchen/Utility Rm-10 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | | Kitchen/Utility Rm-11 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | | Kitchen/Utility Rm-12 | Materials to install treated 2"x10"x16' treated floor joists , 16" o/c | Unit | 14 | | Kitchen/Utility Rm-13 | Labor to install treated 2"x10"x16' treated floor joists, 16" o/c | Unit | 14 | | Kitchen/Utility Rm-14 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 176 | | Kitchen/Utility Rm-15 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 176 | | Kitchen/Utility Rm-16 | Materials to install pre finished base cabinets | Linear Foot/Feet | 8 | | Kitchen/Utility Rm-17 | Labor to install pre finished base cabinets | Linear Foot/Feet | 8 | | Kitchen/Utility Rm-18 | Materials to install pre finished wall cabinets | Linear Foot/Feet | 4 | | Kitchen/Utility Rm-19 | Labor to install pre finished wall cabinets | Linear Foot/Feet | 4 | | Kitchen/Utility Rm-20 | Materials to install laminate countertops | Linear Foot/Feet | 8 | | Kitchen/Utility Rm-21 | Labor to install laminate countertops | Linear Foot/Feet | 8 | | Kitchen/Utility Rm-22 | Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | | Kitchen/Utility Rm-23 | Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | | Kitchen/Utility Rm-24 | Materials to install vinyl plank flooring | Square Foot/Feet | 176 | | Kitchen/Utility Rm-25 | Labor to install vinyl plank flooring | Square Foot/Feet | 176 | | Kitchen/Utility Rm-26 | Materials to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | | Kitchen/Utility Rm-27 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | | Kitchen/Utility Rm-28 | Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover | Square Foot/Feet | 608 | | Kitchen/Utility Rm-29 | Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover | Square Foot/Feet | 608 | | Bathroom-30 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | | Bathroom-31 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | | Bathroom-32 | Materials to install 2"x10"x16' treated floor joists | Unit | 8 | | Bathroom-33 | Labor to install 2"x10"x16' treated floor joists | Unit | 8 | | Bathroom-34 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 42 | | Bathroom-35 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 42 | | Bathroom-36 | Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | | Bathroom-37 | Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | | Bathroom-38 | Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | | Bathroom-39 | Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | | Bathroom-40 | Materials to install a comfort height commode, include new wax ring and supply line | Unit | 1 | | Bathroom-41 | Labor to install a comfort height commode, include new wax ring and supply line | Unit | 1 | | Bathroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 42 | | Bathroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 42 | | Bathroom-44 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 26 | | Bathroom-45 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 26 | | Bathroom-46 | Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | | Bathroom-47 | Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | | Bathroom-48 | Materials to prep and paint walls and base board , apply sufficient coats to cover | Square Foot/Feet | 208 | | Bathroom-49 | Labor to prep and paint walls and base board apply sufficient coats to cover | Square Foot/Feet | 208 | | Back Bedroom-50 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | | Back Bedroom-51 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | | Back Bedroom-52 | Materials to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | | Back Bedroom-53 | Labor to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | | Back Bedroom-54 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 182 | | Back Bedroom-55 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 182 | | Back Bedroom-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 182 | | Back Bedroom-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 182 | | Back Bedroom-58 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 54 | | Back Bedrdoom-59 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | | Electrical-60 | Materials to install a 200 amp interior breaker panel with breakers, as per current code | Unit | 1 | | Electrical-61 | Labor to install a 200 amp breaker panel with breakers, as per current code | Unit | 1 | | Electrical-62 | Materials to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | | Electrical-63 | Labor to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | | Heating&Air-64 | Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code | Unit | 1 | | Heating&Air-65 | Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code | Unit | 1 | | Heating&Air-66 | Materials to install 2 ton duct work, to include ceiling registers | Unit | 1 | | Heating&Air-67 | Labor to install 2 ton duct work to include ceiling registers | Unit | 1 | | Heating&Air-68 | Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | | Heating&Air-69 | Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | | Heating&Air-70 | Materials to install copper line set with cover | Unit | 1 | | Heating&Air-71 | Labor to install copper line set with cover | Unit | 1 | | Plumbing-72 | Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping | Unit | 1 | | Plumbing-73 | Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping | Unit | 1 | | General Conditions-74 | Materials to provide storage container/pod for homeowners belongings during construction | Unit | 1 | | General Conditions-75 | Materials to provide trash removal | Unit | 1 | | General Conditions-76 | Materials to provide a Porta-John | Unit | 1 | | General Conditions-77 | Materials to provide a Permit | Unit | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next HOME-90 11th Ave Code Description UOM Qty Windows-2 Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Windows-3 Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Crawl Space-4 Materials to install CMU piers with poured footers Unit 10 Crawl Space-5 Labor to install CMU piers with poured footers Unit 10 Crawl Space-6 Materials to remove and install new vinyl underpinning , use vented panels as required Linear Foot/Feet 140 Crawl Space-7 Labor to remove and install new vinyl underpinning, use vented panels as required Linear Foot/Feet 140 Back Entry-8 Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Back Entry-9 Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Kitchen/Utility Rm-10 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-11 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-12 Materials to install treated 2"x10"x16' treated floor joists , 16" o/c Unit 14 Kitchen/Utility Rm-13 Labor to install treated 2"x10"x16' treated floor joists, 16" o/c Unit 14 Kitchen/Utility Rm-14 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-15 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-16 Materials to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-17 Labor to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-18 Materials to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-19 Labor to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-20 Materials to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-21 Labor to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-22 Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-23 Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-24 Materials to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-25 Labor to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-26 Materials to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-27 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-28 Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover Square Foot/Feet 608 Kitchen/Utility Rm-29 Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover Square Foot/Feet 608 Bathroom-30 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-31 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-32 Materials to install 2"x10"x16' treated floor joists Unit 8 Bathroom-33 Labor to install 2"x10"x16' treated floor joists Unit 8 Bathroom-34 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 42 Bathroom-35 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 42 Bathroom-36 Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-37 Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-38 Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-39 Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-40 Materials to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-41 Labor to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-42 Materials to install vinyl plank flooring Square Foot/Feet 42 Bathroom-43 Labor to install vinyl plank flooring Square Foot/Feet 42 Bathroom-44 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 26 Bathroom-45 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 26 Bathroom-46 Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-47 Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-48 Materials to prep and paint walls and base board , apply sufficient coats to cover Square Foot/Feet 208 Bathroom-49 Labor to prep and paint walls and base board apply sufficient coats to cover Square Foot/Feet 208 Back Bedroom-50 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-51 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-52 Materials to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-53 Labor to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-54 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 182 Back Bedroom-55 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 182 Back Bedroom-56 Materials to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-57 Labor to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-58 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 54 Back Bedrdoom-59 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Electrical-60 Materials to install a 200 amp interior breaker panel with breakers, as per current code Unit 1 Electrical-61 Labor to install a 200 amp breaker panel with breakers, as per current code Unit 1 Electrical-62 Materials to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Electrical-63 Labor to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Heating&Air-64 Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code Unit 1 Heating&Air-65 Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code Unit 1 Heating&Air-66 Materials to install 2 ton duct work, to include ceiling registers Unit 1 Heating&Air-67 Labor to install 2 ton duct work to include ceiling registers Unit 1 Heating&Air-68 Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-69 Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-70 Materials to install copper line set with cover Unit 1 Heating&Air-71 Labor to install copper line set with cover Unit 1 Plumbing-72 Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping Unit 1 Plumbing-73 Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping Unit 1 General Conditions-74 Materials to provide storage container/pod for homeowners belongings during construction Unit 1 General Conditions-75 Materials to provide trash removal Unit 1 General Conditions-76 Materials to provide a Porta-John Unit 1 General Conditions-77 Materials to provide a Permit Unit 1 | Code Description UOM Qty | Windows-2 Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Windows-3 Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Crawl Space-4 Materials to install CMU piers with poured footers Unit 10 Crawl Space-5 Labor to install CMU piers with poured footers Unit 10 Crawl Space-6 Materials to remove and install new vinyl underpinning , use vented panels as required Linear Foot/Feet 140 Crawl Space-7 Labor to remove and install new vinyl underpinning, use vented panels as required Linear Foot/Feet 140 Back Entry-8 Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Back Entry-9 Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Kitchen/Utility Rm-10 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-11 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-12 Materials to install treated 2"x10"x16' treated floor joists , 16" o/c Unit 14 Kitchen/Utility Rm-13 Labor to install treated 2"x10"x16' treated floor joists, 16" o/c Unit 14 Kitchen/Utility Rm-14 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-15 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-16 Materials to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-17 Labor to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-18 Materials to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-19 Labor to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-20 Materials to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-21 Labor to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-22 Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-23 Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-24 Materials to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-25 Labor to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-26 Materials to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-27 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-28 Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover Square Foot/Feet 608 Kitchen/Utility Rm-29 Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover Square Foot/Feet 608 Bathroom-30 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-31 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-32 Materials to install 2"x10"x16' treated floor joists Unit 8 Bathroom-33 Labor to install 2"x10"x16' treated floor joists Unit 8 Bathroom-34 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 42 Bathroom-35 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 42 Bathroom-36 Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-37 Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-38 Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-39 Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-40 Materials to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-41 Labor to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-42 Materials to install vinyl plank flooring Square Foot/Feet 42 Bathroom-43 Labor to install vinyl plank flooring Square Foot/Feet 42 Bathroom-44 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 26 Bathroom-45 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 26 Bathroom-46 Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-47 Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-48 Materials to prep and paint walls and base board , apply sufficient coats to cover Square Foot/Feet 208 Bathroom-49 Labor to prep and paint walls and base board apply sufficient coats to cover Square Foot/Feet 208 Back Bedroom-50 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-51 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-52 Materials to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-53 Labor to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-54 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 182 Back Bedroom-55 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 182 Back Bedroom-56 Materials to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-57 Labor to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-58 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 54 Back Bedrdoom-59 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Electrical-60 Materials to install a 200 amp interior breaker panel with breakers, as per current code Unit 1 Electrical-61 Labor to install a 200 amp breaker panel with breakers, as per current code Unit 1 Electrical-62 Materials to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Electrical-63 Labor to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Heating&Air-64 Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code Unit 1 Heating&Air-65 Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code Unit 1 Heating&Air-66 Materials to install 2 ton duct work, to include ceiling registers Unit 1 Heating&Air-67 Labor to install 2 ton duct work to include ceiling registers Unit 1 Heating&Air-68 Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-69 Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-70 Materials to install copper line set with cover Unit 1 Heating&Air-71 Labor to install copper line set with cover Unit 1 Plumbing-72 Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping Unit 1 Plumbing-73 Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping Unit 1 General Conditions-74 Materials to provide storage container/pod for homeowners belongings during construction Unit 1 General Conditions-75 Materials to provide trash removal Unit 1 General Conditions-76 Materials to provide a Porta-John Unit 1 General Conditions-77 Materials to provide a Permit Unit 1 | Windows-2 | Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | Windows-3 | Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | Crawl Space-4 | Materials to install CMU piers with poured footers | Unit | 10 | Crawl Space-5 | Labor to install CMU piers with poured footers | Unit | 10 | Crawl Space-6 | Materials to remove and install new vinyl underpinning , use vented panels as required | Linear Foot/Feet | 140 | Crawl Space-7 | Labor to remove and install new vinyl underpinning, use vented panels as required | Linear Foot/Feet | 140 | Back Entry-8 | Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | Back Entry-9 | Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | Kitchen/Utility Rm-10 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | Kitchen/Utility Rm-11 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | Kitchen/Utility Rm-12 | Materials to install treated 2"x10"x16' treated floor joists , 16" o/c | Unit | 14 | Kitchen/Utility Rm-13 | Labor to install treated 2"x10"x16' treated floor joists, 16" o/c | Unit | 14 | Kitchen/Utility Rm-14 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 176 | Kitchen/Utility Rm-15 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 176 | Kitchen/Utility Rm-16 | Materials to install pre finished base cabinets | Linear Foot/Feet | 8 | Kitchen/Utility Rm-17 | Labor to install pre finished base cabinets | Linear Foot/Feet | 8 | Kitchen/Utility Rm-18 | Materials to install pre finished wall cabinets | Linear Foot/Feet | 4 | Kitchen/Utility Rm-19 | Labor to install pre finished wall cabinets | Linear Foot/Feet | 4 | Kitchen/Utility Rm-20 | Materials to install laminate countertops | Linear Foot/Feet | 8 | Kitchen/Utility Rm-21 | Labor to install laminate countertops | Linear Foot/Feet | 8 | Kitchen/Utility Rm-22 | Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | Kitchen/Utility Rm-23 | Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | Kitchen/Utility Rm-24 | Materials to install vinyl plank flooring | Square Foot/Feet | 176 | Kitchen/Utility Rm-25 | Labor to install vinyl plank flooring | Square Foot/Feet | 176 | Kitchen/Utility Rm-26 | Materials to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Kitchen/Utility Rm-27 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Kitchen/Utility Rm-28 | Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover | Square Foot/Feet | 608 | Kitchen/Utility Rm-29 | Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover | Square Foot/Feet | 608 | Bathroom-30 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | Bathroom-31 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | Bathroom-32 | Materials to install 2"x10"x16' treated floor joists | Unit | 8 | Bathroom-33 | Labor to install 2"x10"x16' treated floor joists | Unit | 8 | Bathroom-34 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 42 | Bathroom-35 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 42 | Bathroom-36 | Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | Bathroom-37 | Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | Bathroom-38 | Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | Bathroom-39 | Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | Bathroom-40 | Materials to install a comfort height commode, include new wax ring and supply line | Unit | 1 | Bathroom-41 | Labor to install a comfort height commode, include new wax ring and supply line | Unit | 1 | Bathroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 42 | Bathroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 42 | Bathroom-44 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 26 | Bathroom-45 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 26 | Bathroom-46 | Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | Bathroom-47 | Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | Bathroom-48 | Materials to prep and paint walls and base board , apply sufficient coats to cover | Square Foot/Feet | 208 | Bathroom-49 | Labor to prep and paint walls and base board apply sufficient coats to cover | Square Foot/Feet | 208 | Back Bedroom-50 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | Back Bedroom-51 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | Back Bedroom-52 | Materials to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | Back Bedroom-53 | Labor to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | Back Bedroom-54 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 182 | Back Bedroom-55 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 182 | Back Bedroom-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 182 | Back Bedroom-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 182 | Back Bedroom-58 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 54 | Back Bedrdoom-59 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Electrical-60 | Materials to install a 200 amp interior breaker panel with breakers, as per current code | Unit | 1 | Electrical-61 | Labor to install a 200 amp breaker panel with breakers, as per current code | Unit | 1 | Electrical-62 | Materials to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | Electrical-63 | Labor to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | Heating&Air-64 | Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code | Unit | 1 | Heating&Air-65 | Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code | Unit | 1 | Heating&Air-66 | Materials to install 2 ton duct work, to include ceiling registers | Unit | 1 | Heating&Air-67 | Labor to install 2 ton duct work to include ceiling registers | Unit | 1 | Heating&Air-68 | Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | Heating&Air-69 | Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | Heating&Air-70 | Materials to install copper line set with cover | Unit | 1 | Heating&Air-71 | Labor to install copper line set with cover | Unit | 1 | Plumbing-72 | Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping | Unit | 1 | Plumbing-73 | Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping | Unit | 1 | General Conditions-74 | Materials to provide storage container/pod for homeowners belongings during construction | Unit | 1 | General Conditions-75 | Materials to provide trash removal | Unit | 1 | General Conditions-76 | Materials to provide a Porta-John | Unit | 1 | General Conditions-77 | Materials to provide a Permit | Unit | 1 | | | Code Description UOM Qty | | Windows-2 Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Windows-3 Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Crawl Space-4 Materials to install CMU piers with poured footers Unit 10 Crawl Space-5 Labor to install CMU piers with poured footers Unit 10 Crawl Space-6 Materials to remove and install new vinyl underpinning , use vented panels as required Linear Foot/Feet 140 Crawl Space-7 Labor to remove and install new vinyl underpinning, use vented panels as required Linear Foot/Feet 140 Back Entry-8 Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Back Entry-9 Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Kitchen/Utility Rm-10 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-11 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-12 Materials to install treated 2"x10"x16' treated floor joists , 16" o/c Unit 14 Kitchen/Utility Rm-13 Labor to install treated 2"x10"x16' treated floor joists, 16" o/c Unit 14 Kitchen/Utility Rm-14 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-15 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-16 Materials to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-17 Labor to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-18 Materials to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-19 Labor to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-20 Materials to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-21 Labor to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-22 Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-23 Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-24 Materials to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-25 Labor to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-26 Materials to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-27 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-28 Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover Square Foot/Feet 608 Kitchen/Utility Rm-29 Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover Square Foot/Feet 608 Bathroom-30 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-31 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-32 Materials to install 2"x10"x16' treated floor joists Unit 8 Bathroom-33 Labor to install 2"x10"x16' treated floor joists Unit 8 Bathroom-34 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 42 Bathroom-35 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 42 Bathroom-36 Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-37 Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-38 Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-39 Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-40 Materials to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-41 Labor to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-42 Materials to install vinyl plank flooring Square Foot/Feet 42 Bathroom-43 Labor to install vinyl plank flooring Square Foot/Feet 42 Bathroom-44 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 26 Bathroom-45 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 26 Bathroom-46 Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-47 Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-48 Materials to prep and paint walls and base board , apply sufficient coats to cover Square Foot/Feet 208 Bathroom-49 Labor to prep and paint walls and base board apply sufficient coats to cover Square Foot/Feet 208 Back Bedroom-50 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-51 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-52 Materials to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-53 Labor to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-54 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 182 Back Bedroom-55 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 182 Back Bedroom-56 Materials to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-57 Labor to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-58 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 54 Back Bedrdoom-59 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Electrical-60 Materials to install a 200 amp interior breaker panel with breakers, as per current code Unit 1 Electrical-61 Labor to install a 200 amp breaker panel with breakers, as per current code Unit 1 Electrical-62 Materials to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Electrical-63 Labor to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Heating&Air-64 Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code Unit 1 Heating&Air-65 Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code Unit 1 Heating&Air-66 Materials to install 2 ton duct work, to include ceiling registers Unit 1 Heating&Air-67 Labor to install 2 ton duct work to include ceiling registers Unit 1 Heating&Air-68 Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-69 Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-70 Materials to install copper line set with cover Unit 1 Heating&Air-71 Labor to install copper line set with cover Unit 1 Plumbing-72 Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping Unit 1 Plumbing-73 Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping Unit 1 General Conditions-74 Materials to provide storage container/pod for homeowners belongings during construction Unit 1 General Conditions-75 Materials to provide trash removal Unit 1 General Conditions-76 Materials to provide a Porta-John Unit 1 General Conditions-77 Materials to provide a Permit Unit 1 | Windows-2 | Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | Windows-3 | Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | Crawl Space-4 | Materials to install CMU piers with poured footers | Unit | 10 | Crawl Space-5 | Labor to install CMU piers with poured footers | Unit | 10 | Crawl Space-6 | Materials to remove and install new vinyl underpinning , use vented panels as required | Linear Foot/Feet | 140 | Crawl Space-7 | Labor to remove and install new vinyl underpinning, use vented panels as required | Linear Foot/Feet | 140 | Back Entry-8 | Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | Back Entry-9 | Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | Kitchen/Utility Rm-10 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | Kitchen/Utility Rm-11 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | Kitchen/Utility Rm-12 | Materials to install treated 2"x10"x16' treated floor joists , 16" o/c | Unit | 14 | Kitchen/Utility Rm-13 | Labor to install treated 2"x10"x16' treated floor joists, 16" o/c | Unit | 14 | Kitchen/Utility Rm-14 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 176 | Kitchen/Utility Rm-15 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 176 | Kitchen/Utility Rm-16 | Materials to install pre finished base cabinets | Linear Foot/Feet | 8 | Kitchen/Utility Rm-17 | Labor to install pre finished base cabinets | Linear Foot/Feet | 8 | Kitchen/Utility Rm-18 | Materials to install pre finished wall cabinets | Linear Foot/Feet | 4 | Kitchen/Utility Rm-19 | Labor to install pre finished wall cabinets | Linear Foot/Feet | 4 | Kitchen/Utility Rm-20 | Materials to install laminate countertops | Linear Foot/Feet | 8 | Kitchen/Utility Rm-21 | Labor to install laminate countertops | Linear Foot/Feet | 8 | Kitchen/Utility Rm-22 | Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | Kitchen/Utility Rm-23 | Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | Kitchen/Utility Rm-24 | Materials to install vinyl plank flooring | Square Foot/Feet | 176 | Kitchen/Utility Rm-25 | Labor to install vinyl plank flooring | Square Foot/Feet | 176 | Kitchen/Utility Rm-26 | Materials to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Kitchen/Utility Rm-27 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Kitchen/Utility Rm-28 | Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover | Square Foot/Feet | 608 | Kitchen/Utility Rm-29 | Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover | Square Foot/Feet | 608 | Bathroom-30 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | Bathroom-31 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | Bathroom-32 | Materials to install 2"x10"x16' treated floor joists | Unit | 8 | Bathroom-33 | Labor to install 2"x10"x16' treated floor joists | Unit | 8 | Bathroom-34 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 42 | Bathroom-35 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 42 | Bathroom-36 | Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | Bathroom-37 | Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | Bathroom-38 | Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | Bathroom-39 | Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | Bathroom-40 | Materials to install a comfort height commode, include new wax ring and supply line | Unit | 1 | Bathroom-41 | Labor to install a comfort height commode, include new wax ring and supply line | Unit | 1 | Bathroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 42 | Bathroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 42 | Bathroom-44 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 26 | Bathroom-45 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 26 | Bathroom-46 | Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | Bathroom-47 | Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | Bathroom-48 | Materials to prep and paint walls and base board , apply sufficient coats to cover | Square Foot/Feet | 208 | Bathroom-49 | Labor to prep and paint walls and base board apply sufficient coats to cover | Square Foot/Feet | 208 | Back Bedroom-50 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | Back Bedroom-51 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | Back Bedroom-52 | Materials to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | Back Bedroom-53 | Labor to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | Back Bedroom-54 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 182 | Back Bedroom-55 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 182 | Back Bedroom-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 182 | Back Bedroom-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 182 | Back Bedroom-58 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 54 | Back Bedrdoom-59 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Electrical-60 | Materials to install a 200 amp interior breaker panel with breakers, as per current code | Unit | 1 | Electrical-61 | Labor to install a 200 amp breaker panel with breakers, as per current code | Unit | 1 | Electrical-62 | Materials to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | Electrical-63 | Labor to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | Heating&Air-64 | Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code | Unit | 1 | Heating&Air-65 | Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code | Unit | 1 | Heating&Air-66 | Materials to install 2 ton duct work, to include ceiling registers | Unit | 1 | Heating&Air-67 | Labor to install 2 ton duct work to include ceiling registers | Unit | 1 | Heating&Air-68 | Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | Heating&Air-69 | Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | Heating&Air-70 | Materials to install copper line set with cover | Unit | 1 | Heating&Air-71 | Labor to install copper line set with cover | Unit | 1 | Plumbing-72 | Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping | Unit | 1 | Plumbing-73 | Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping | Unit | 1 | General Conditions-74 | Materials to provide storage container/pod for homeowners belongings during construction | Unit | 1 | General Conditions-75 | Materials to provide trash removal | Unit | 1 | General Conditions-76 | Materials to provide a Porta-John | Unit | 1 | General Conditions-77 | Materials to provide a Permit | Unit | 1 | | | Windows-2 | Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | | Windows-3 | Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | | Crawl Space-4 | Materials to install CMU piers with poured footers | Unit | 10 | | Crawl Space-5 | Labor to install CMU piers with poured footers | Unit | 10 | | Crawl Space-6 | Materials to remove and install new vinyl underpinning , use vented panels as required | Linear Foot/Feet | 140 | | Crawl Space-7 | Labor to remove and install new vinyl underpinning, use vented panels as required | Linear Foot/Feet | 140 | | Back Entry-8 | Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | | Back Entry-9 | Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | | Kitchen/Utility Rm-10 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | | Kitchen/Utility Rm-11 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | | Kitchen/Utility Rm-12 | Materials to install treated 2"x10"x16' treated floor joists , 16" o/c | Unit | 14 | | Kitchen/Utility Rm-13 | Labor to install treated 2"x10"x16' treated floor joists, 16" o/c | Unit | 14 | | Kitchen/Utility Rm-14 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 176 | | Kitchen/Utility Rm-15 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 176 | | Kitchen/Utility Rm-16 | Materials to install pre finished base cabinets | Linear Foot/Feet | 8 | | Kitchen/Utility Rm-17 | Labor to install pre finished base cabinets | Linear Foot/Feet | 8 | | Kitchen/Utility Rm-18 | Materials to install pre finished wall cabinets | Linear Foot/Feet | 4 | | Kitchen/Utility Rm-19 | Labor to install pre finished wall cabinets | Linear Foot/Feet | 4 | | Kitchen/Utility Rm-20 | Materials to install laminate countertops | Linear Foot/Feet | 8 | | Kitchen/Utility Rm-21 | Labor to install laminate countertops | Linear Foot/Feet | 8 | | Kitchen/Utility Rm-22 | Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | | Kitchen/Utility Rm-23 | Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | | Kitchen/Utility Rm-24 | Materials to install vinyl plank flooring | Square Foot/Feet | 176 | | Kitchen/Utility Rm-25 | Labor to install vinyl plank flooring | Square Foot/Feet | 176 | | Kitchen/Utility Rm-26 | Materials to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | | Kitchen/Utility Rm-27 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | | Kitchen/Utility Rm-28 | Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover | Square Foot/Feet | 608 | | Kitchen/Utility Rm-29 | Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover | Square Foot/Feet | 608 | | Bathroom-30 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | | Bathroom-31 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | | Bathroom-32 | Materials to install 2"x10"x16' treated floor joists | Unit | 8 | | Bathroom-33 | Labor to install 2"x10"x16' treated floor joists | Unit | 8 | | Bathroom-34 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 42 | | Bathroom-35 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 42 | | Bathroom-36 | Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | | Bathroom-37 | Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | | Bathroom-38 | Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | | Bathroom-39 | Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | | Bathroom-40 | Materials to install a comfort height commode, include new wax ring and supply line | Unit | 1 | | Bathroom-41 | Labor to install a comfort height commode, include new wax ring and supply line | Unit | 1 | | Bathroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 42 | | Bathroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 42 | | Bathroom-44 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 26 | | Bathroom-45 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 26 | | Bathroom-46 | Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | | Bathroom-47 | Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | | Bathroom-48 | Materials to prep and paint walls and base board , apply sufficient coats to cover | Square Foot/Feet | 208 | | Bathroom-49 | Labor to prep and paint walls and base board apply sufficient coats to cover | Square Foot/Feet | 208 | | Back Bedroom-50 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | | Back Bedroom-51 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | | Back Bedroom-52 | Materials to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | | Back Bedroom-53 | Labor to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | | Back Bedroom-54 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 182 | | Back Bedroom-55 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 182 | | Back Bedroom-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 182 | | Back Bedroom-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 182 | | Back Bedroom-58 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 54 | | Back Bedrdoom-59 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | | Electrical-60 | Materials to install a 200 amp interior breaker panel with breakers, as per current code | Unit | 1 | | Electrical-61 | Labor to install a 200 amp breaker panel with breakers, as per current code | Unit | 1 | | Electrical-62 | Materials to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | | Electrical-63 | Labor to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | | Heating&Air-64 | Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code | Unit | 1 | | Heating&Air-65 | Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code | Unit | 1 | | Heating&Air-66 | Materials to install 2 ton duct work, to include ceiling registers | Unit | 1 | | Heating&Air-67 | Labor to install 2 ton duct work to include ceiling registers | Unit | 1 | | Heating&Air-68 | Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | | Heating&Air-69 | Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | | Heating&Air-70 | Materials to install copper line set with cover | Unit | 1 | | Heating&Air-71 | Labor to install copper line set with cover | Unit | 1 | | Plumbing-72 | Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping | Unit | 1 | | Plumbing-73 | Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping | Unit | 1 | | General Conditions-74 | Materials to provide storage container/pod for homeowners belongings during construction | Unit | 1 | | General Conditions-75 | Materials to provide trash removal | Unit | 1 | | General Conditions-76 | Materials to provide a Porta-John | Unit | 1 | | General Conditions-77 | Materials to provide a Permit | Unit | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Code Description UOM Qty | | Windows-2 Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Windows-3 Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed Unit 9 Crawl Space-4 Materials to install CMU piers with poured footers Unit 10 Crawl Space-5 Labor to install CMU piers with poured footers Unit 10 Crawl Space-6 Materials to remove and install new vinyl underpinning , use vented panels as required Linear Foot/Feet 140 Crawl Space-7 Labor to remove and install new vinyl underpinning, use vented panels as required Linear Foot/Feet 140 Back Entry-8 Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Back Entry-9 Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps Linear Foot/Feet 14 Kitchen/Utility Rm-10 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-11 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 176 Kitchen/Utility Rm-12 Materials to install treated 2"x10"x16' treated floor joists , 16" o/c Unit 14 Kitchen/Utility Rm-13 Labor to install treated 2"x10"x16' treated floor joists, 16" o/c Unit 14 Kitchen/Utility Rm-14 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-15 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 176 Kitchen/Utility Rm-16 Materials to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-17 Labor to install pre finished base cabinets Linear Foot/Feet 8 Kitchen/Utility Rm-18 Materials to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-19 Labor to install pre finished wall cabinets Linear Foot/Feet 4 Kitchen/Utility Rm-20 Materials to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-21 Labor to install laminate countertops Linear Foot/Feet 8 Kitchen/Utility Rm-22 Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-23 Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly Unit 1 Kitchen/Utility Rm-24 Materials to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-25 Labor to install vinyl plank flooring Square Foot/Feet 176 Kitchen/Utility Rm-26 Materials to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-27 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Kitchen/Utility Rm-28 Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover Square Foot/Feet 608 Kitchen/Utility Rm-29 Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover Square Foot/Feet 608 Bathroom-30 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-31 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 42 Bathroom-32 Materials to install 2"x10"x16' treated floor joists Unit 8 Bathroom-33 Labor to install 2"x10"x16' treated floor joists Unit 8 Bathroom-34 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 42 Bathroom-35 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 42 Bathroom-36 Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-37 Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications Unit 1 Bathroom-38 Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-39 Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines Unit 1 Bathroom-40 Materials to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-41 Labor to install a comfort height commode, include new wax ring and supply line Unit 1 Bathroom-42 Materials to install vinyl plank flooring Square Foot/Feet 42 Bathroom-43 Labor to install vinyl plank flooring Square Foot/Feet 42 Bathroom-44 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 26 Bathroom-45 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 26 Bathroom-46 Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-47 Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior Unit 1 Bathroom-48 Materials to prep and paint walls and base board , apply sufficient coats to cover Square Foot/Feet 208 Bathroom-49 Labor to prep and paint walls and base board apply sufficient coats to cover Square Foot/Feet 208 Back Bedroom-50 Materials to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-51 Labor to demo to joist , remove floor covering and sub-floor Square Foot/Feet 182 Back Bedroom-52 Materials to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-53 Labor to install 2"x10"x16' treated floor joists 16" o/c Unit 12 Back Bedroom-54 Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent Square Foot/Feet 182 Back Bedroom-55 Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent Square Foot/Feet 182 Back Bedroom-56 Materials to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-57 Labor to install vinyl plank flooring Square Foot/Feet 182 Back Bedroom-58 Materials to install 3-1/4" base with 3/4" round trim Linear Foot/Feet 54 Back Bedrdoom-59 Labor to install 3-1/4" base board with 3/4" round trim Linear Foot/Feet 54 Electrical-60 Materials to install a 200 amp interior breaker panel with breakers, as per current code Unit 1 Electrical-61 Labor to install a 200 amp breaker panel with breakers, as per current code Unit 1 Electrical-62 Materials to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Electrical-63 Labor to install a 13" flush mount ceiling fixture in the back bedroom Unit 1 Heating&Air-64 Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code Unit 1 Heating&Air-65 Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code Unit 1 Heating&Air-66 Materials to install 2 ton duct work, to include ceiling registers Unit 1 Heating&Air-67 Labor to install 2 ton duct work to include ceiling registers Unit 1 Heating&Air-68 Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-69 Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat Unit 1 Heating&Air-70 Materials to install copper line set with cover Unit 1 Heating&Air-71 Labor to install copper line set with cover Unit 1 Plumbing-72 Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping Unit 1 Plumbing-73 Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping Unit 1 General Conditions-74 Materials to provide storage container/pod for homeowners belongings during construction Unit 1 General Conditions-75 Materials to provide trash removal Unit 1 General Conditions-76 Materials to provide a Porta-John Unit 1 General Conditions-77 Materials to provide a Permit Unit 1 | Windows-2 | Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | Windows-3 | Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | Crawl Space-4 | Materials to install CMU piers with poured footers | Unit | 10 | Crawl Space-5 | Labor to install CMU piers with poured footers | Unit | 10 | Crawl Space-6 | Materials to remove and install new vinyl underpinning , use vented panels as required | Linear Foot/Feet | 140 | Crawl Space-7 | Labor to remove and install new vinyl underpinning, use vented panels as required | Linear Foot/Feet | 140 | Back Entry-8 | Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | Back Entry-9 | Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | Kitchen/Utility Rm-10 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | Kitchen/Utility Rm-11 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | Kitchen/Utility Rm-12 | Materials to install treated 2"x10"x16' treated floor joists , 16" o/c | Unit | 14 | Kitchen/Utility Rm-13 | Labor to install treated 2"x10"x16' treated floor joists, 16" o/c | Unit | 14 | Kitchen/Utility Rm-14 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 176 | Kitchen/Utility Rm-15 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 176 | Kitchen/Utility Rm-16 | Materials to install pre finished base cabinets | Linear Foot/Feet | 8 | Kitchen/Utility Rm-17 | Labor to install pre finished base cabinets | Linear Foot/Feet | 8 | Kitchen/Utility Rm-18 | Materials to install pre finished wall cabinets | Linear Foot/Feet | 4 | Kitchen/Utility Rm-19 | Labor to install pre finished wall cabinets | Linear Foot/Feet | 4 | Kitchen/Utility Rm-20 | Materials to install laminate countertops | Linear Foot/Feet | 8 | Kitchen/Utility Rm-21 | Labor to install laminate countertops | Linear Foot/Feet | 8 | Kitchen/Utility Rm-22 | Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | Kitchen/Utility Rm-23 | Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | Kitchen/Utility Rm-24 | Materials to install vinyl plank flooring | Square Foot/Feet | 176 | Kitchen/Utility Rm-25 | Labor to install vinyl plank flooring | Square Foot/Feet | 176 | Kitchen/Utility Rm-26 | Materials to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Kitchen/Utility Rm-27 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Kitchen/Utility Rm-28 | Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover | Square Foot/Feet | 608 | Kitchen/Utility Rm-29 | Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover | Square Foot/Feet | 608 | Bathroom-30 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | Bathroom-31 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | Bathroom-32 | Materials to install 2"x10"x16' treated floor joists | Unit | 8 | Bathroom-33 | Labor to install 2"x10"x16' treated floor joists | Unit | 8 | Bathroom-34 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 42 | Bathroom-35 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 42 | Bathroom-36 | Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | Bathroom-37 | Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | Bathroom-38 | Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | Bathroom-39 | Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | Bathroom-40 | Materials to install a comfort height commode, include new wax ring and supply line | Unit | 1 | Bathroom-41 | Labor to install a comfort height commode, include new wax ring and supply line | Unit | 1 | Bathroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 42 | Bathroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 42 | Bathroom-44 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 26 | Bathroom-45 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 26 | Bathroom-46 | Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | Bathroom-47 | Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | Bathroom-48 | Materials to prep and paint walls and base board , apply sufficient coats to cover | Square Foot/Feet | 208 | Bathroom-49 | Labor to prep and paint walls and base board apply sufficient coats to cover | Square Foot/Feet | 208 | Back Bedroom-50 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | Back Bedroom-51 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | Back Bedroom-52 | Materials to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | Back Bedroom-53 | Labor to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | Back Bedroom-54 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 182 | Back Bedroom-55 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 182 | Back Bedroom-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 182 | Back Bedroom-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 182 | Back Bedroom-58 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 54 | Back Bedrdoom-59 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | Electrical-60 | Materials to install a 200 amp interior breaker panel with breakers, as per current code | Unit | 1 | Electrical-61 | Labor to install a 200 amp breaker panel with breakers, as per current code | Unit | 1 | Electrical-62 | Materials to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | Electrical-63 | Labor to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | Heating&Air-64 | Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code | Unit | 1 | Heating&Air-65 | Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code | Unit | 1 | Heating&Air-66 | Materials to install 2 ton duct work, to include ceiling registers | Unit | 1 | Heating&Air-67 | Labor to install 2 ton duct work to include ceiling registers | Unit | 1 | Heating&Air-68 | Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | Heating&Air-69 | Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | Heating&Air-70 | Materials to install copper line set with cover | Unit | 1 | Heating&Air-71 | Labor to install copper line set with cover | Unit | 1 | Plumbing-72 | Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping | Unit | 1 | Plumbing-73 | Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping | Unit | 1 | General Conditions-74 | Materials to provide storage container/pod for homeowners belongings during construction | Unit | 1 | General Conditions-75 | Materials to provide trash removal | Unit | 1 | General Conditions-76 | Materials to provide a Porta-John | Unit | 1 | General Conditions-77 | Materials to provide a Permit | Unit | 1 | | | Windows-2 | Materials to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | | Windows-3 | Labor to install single hung vinyl windows w/ screens . Wrap exterior exposed wood with aluminum trim coil/Install additional trim on interior as needed to close up gaps as needed | Unit | 9 | | Crawl Space-4 | Materials to install CMU piers with poured footers | Unit | 10 | | Crawl Space-5 | Labor to install CMU piers with poured footers | Unit | 10 | | Crawl Space-6 | Materials to remove and install new vinyl underpinning , use vented panels as required | Linear Foot/Feet | 140 | | Crawl Space-7 | Labor to remove and install new vinyl underpinning, use vented panels as required | Linear Foot/Feet | 140 | | Back Entry-8 | Materials to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | | Back Entry-9 | Labor to remove existing hand rails and build an ADA compliant ramp using treated lumber to include a 5'x5' landing w/ steps | Linear Foot/Feet | 14 | | Kitchen/Utility Rm-10 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | | Kitchen/Utility Rm-11 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 176 | | Kitchen/Utility Rm-12 | Materials to install treated 2"x10"x16' treated floor joists , 16" o/c | Unit | 14 | | Kitchen/Utility Rm-13 | Labor to install treated 2"x10"x16' treated floor joists, 16" o/c | Unit | 14 | | Kitchen/Utility Rm-14 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 176 | | Kitchen/Utility Rm-15 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 176 | | Kitchen/Utility Rm-16 | Materials to install pre finished base cabinets | Linear Foot/Feet | 8 | | Kitchen/Utility Rm-17 | Labor to install pre finished base cabinets | Linear Foot/Feet | 8 | | Kitchen/Utility Rm-18 | Materials to install pre finished wall cabinets | Linear Foot/Feet | 4 | | Kitchen/Utility Rm-19 | Labor to install pre finished wall cabinets | Linear Foot/Feet | 4 | | Kitchen/Utility Rm-20 | Materials to install laminate countertops | Linear Foot/Feet | 8 | | Kitchen/Utility Rm-21 | Labor to install laminate countertops | Linear Foot/Feet | 8 | | Kitchen/Utility Rm-22 | Materials to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | | Kitchen/Utility Rm-23 | Labor to install a DBL. Bowl stainless sink with single lever faucet, include supply lines and drain assembly | Unit | 1 | | Kitchen/Utility Rm-24 | Materials to install vinyl plank flooring | Square Foot/Feet | 176 | | Kitchen/Utility Rm-25 | Labor to install vinyl plank flooring | Square Foot/Feet | 176 | | Kitchen/Utility Rm-26 | Materials to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | | Kitchen/Utility Rm-27 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | | Kitchen/Utility Rm-28 | Materials to prep and paint walls, ceiling and baseboard with sufficient coats of paint to cover | Square Foot/Feet | 608 | | Kitchen/Utility Rm-29 | Labor to prep and paint walls, ceiling and baseboard with sufficient coast of paint to cover | Square Foot/Feet | 608 | | Bathroom-30 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | | Bathroom-31 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 42 | | Bathroom-32 | Materials to install 2"x10"x16' treated floor joists | Unit | 8 | | Bathroom-33 | Labor to install 2"x10"x16' treated floor joists | Unit | 8 | | Bathroom-34 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 42 | | Bathroom-35 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 42 | | Bathroom-36 | Materials to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | | Bathroom-37 | Labor to install a low threshold fiberglass shower with seat, include new fixtures and plumbing modifications | Unit | 1 | | Bathroom-38 | Materials to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | | Bathroom-39 | Labor to install a 24" vanity with top, integrated sink and faucet include new drain and supply lines | Unit | 1 | | Bathroom-40 | Materials to install a comfort height commode, include new wax ring and supply line | Unit | 1 | | Bathroom-41 | Labor to install a comfort height commode, include new wax ring and supply line | Unit | 1 | | Bathroom-42 | Materials to install vinyl plank flooring | Square Foot/Feet | 42 | | Bathroom-43 | Labor to install vinyl plank flooring | Square Foot/Feet | 42 | | Bathroom-44 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 26 | | Bathroom-45 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 26 | | Bathroom-46 | Materials to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | | Bathroom-47 | Labor to remove window, frame and finish on both sides. Insulate wall cavity , install sheetrock and vinyl siding on exterior | Unit | 1 | | Bathroom-48 | Materials to prep and paint walls and base board , apply sufficient coats to cover | Square Foot/Feet | 208 | | Bathroom-49 | Labor to prep and paint walls and base board apply sufficient coats to cover | Square Foot/Feet | 208 | | Back Bedroom-50 | Materials to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | | Back Bedroom-51 | Labor to demo to joist , remove floor covering and sub-floor | Square Foot/Feet | 182 | | Back Bedroom-52 | Materials to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | | Back Bedroom-53 | Labor to install 2"x10"x16' treated floor joists 16" o/c | Unit | 12 | | Back Bedroom-54 | Materials to install 3/4" T&G plywood sub-floor , use advantech or equivalent | Square Foot/Feet | 182 | | Back Bedroom-55 | Labor to install 3/4" T&G plywood sub-floor, use advantech or equivalent | Square Foot/Feet | 182 | | Back Bedroom-56 | Materials to install vinyl plank flooring | Square Foot/Feet | 182 | | Back Bedroom-57 | Labor to install vinyl plank flooring | Square Foot/Feet | 182 | | Back Bedroom-58 | Materials to install 3-1/4" base with 3/4" round trim | Linear Foot/Feet | 54 | | Back Bedrdoom-59 | Labor to install 3-1/4" base board with 3/4" round trim | Linear Foot/Feet | 54 | | Electrical-60 | Materials to install a 200 amp interior breaker panel with breakers, as per current code | Unit | 1 | | Electrical-61 | Labor to install a 200 amp breaker panel with breakers, as per current code | Unit | 1 | | Electrical-62 | Materials to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | | Electrical-63 | Labor to install a 13" flush mount ceiling fixture in the back bedroom | Unit | 1 | | Heating&Air-64 | Materials to install a 2 ton HVAC system include new equipment pad, air handler pan . Per Code | Unit | 1 | | Heating&Air-65 | Labor to install a 2 ton HVAC system include new equipment pad, air handler pan. Per Code | Unit | 1 | | Heating&Air-66 | Materials to install 2 ton duct work, to include ceiling registers | Unit | 1 | | Heating&Air-67 | Labor to install 2 ton duct work to include ceiling registers | Unit | 1 | | Heating&Air-68 | Materials to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | | Heating&Air-69 | Labor to install electrical for HVAC system, breakers, disconnect, wiring and thermostat | Unit | 1 | | Heating&Air-70 | Materials to install copper line set with cover | Unit | 1 | | Heating&Air-71 | Labor to install copper line set with cover | Unit | 1 | | Plumbing-72 | Materials to install a washing machine drain box with new supply lines , include 8' of supply line for both hot and cold piping | Unit | 1 | | Plumbing-73 | Labor to install a washing machine drain box with new supply lines, include 8' of supply line for both hot and cold piping | Unit | 1 | | General Conditions-74 | Materials to provide storage container/pod for homeowners belongings during construction | Unit | 1 | | General Conditions-75 | Materials to provide trash removal | Unit | 1 | | General Conditions-76 | Materials to provide a Porta-John | Unit | 1 | | General Conditions-77 | Materials to provide a Permit | Unit | 1 |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.