Active SLED Opportunity · NEW YORK · COUNTY OF ONTARIO

    Sole Source Intent - Vertiv Corporation - Replacement of Liebert UPS Batteries

    Issued by County of Ontario
    countySource SoughtCounty of OntarioSol. 286714
    Open · 1d remaining
    DAYS TO CLOSE
    1
    due Aug 6, 2026
    PUBLISHED
    Jul 23, 2026
    Posting date
    JURISDICTION
    County of
    county
    NAICS CODE
    561210
    AI-classified industry

    AI Summary

    County of Ontario seeks sole source award to Vertiv Corporation for replacement and maintenance of Liebert UPS batteries critical to IT and 911 operations. Vertiv's exclusive factory-trained engineers and proprietary support ensure warranty compliance and system reliability. Anticipated cost $41,000. Not a competitive bid.

    Opportunity details

    Solicitation No.
    286714
    Type / RFx
    Source Sought
    Status
    open
    Level
    county
    Published Date
    July 23, 2026
    Due Date
    August 6, 2026
    NAICS Code
    561210AI guide
    Jurisdiction
    County of Ontario
    Agency
    County of Ontario

    Description

    THIS IS NOT A COMPETITIVE BID

    The County of Ontario intends to recommend the issuance of a Sole Source award to Vertiv Corporation for SERVICE PERFORMED 1. Ensure the battery system is disconnected from UPS and battery system is safe to be worked with. 2. Verify the integrity of the battery rack/cabinet. 3. Remove all modules. 4. Measure and record all open circuit voltages for all units to ensure they can be placed in the string(s) and online. 5. Replace with new units in the exact same orientation as the old units. 6. Replace hardware if supplied with the new batteries. If not supplied, inspect, clean and neutralize the existing cables and clean the racks/trays from any possible leaking batteries. 7. Clean any corrosion from cables if re-using existing cables and clean the racks/trays from any possible leaking batteries. 8. Add a thin coat of anti-corrosion inhibitor to the face of the connector and to the contact surface of the battery terminal or as directed by the battery manufacturer. 9. Install tab washers for battery monitoring senses leads. 10. Torque all connections to the specific “inch pound” requirement specified by the manufacturer of the battery. 11. Ensure all battery monitoring wires are connected properly, if battery monitoring is present. 12. Verify that no ground faults exist prior to energizing the battery. 13. Return the battery system to normal float per the manufacturer’s guidelines. 14. Measure and record the total battery float voltage (at the battery). 15. Measure and record charging current. 16. Measure and record the overall AC ripple voltage. 17. Measure and record the overall AC ripple current. 18. Measure and record the ambient temperature. 19. Measure and record 100% of the jar temperatures. 20. Measure and record the float voltage of all jars. 21. Commission the Alber monitor (if present) following the standard commissioning procedures. 22. Provide the battery the proper Freshening charge per the manufacturer’s guidelines. 23. Clean the site of any foreign materials left behind. 24. Prepare batteries for recycling and transportation (wrap the batteries with plastic wrap to secure them to the pallets) Any purchase order resulting from this proposed sole source will be made in accordance with the laws governing the purchasing processes of the County of Ontario. Any responses received as a result of this Notice of Intent shall be considered solely for the purpose of determining whether to conduct a competitive procurement in the future. Responses will not be considered as proposals, bids, or quotes.

    The Purchasing Department has received a request to make the following sole-source procurement:

    Requesting Department/Office: Department of Public Works

    Product and/or services to be purchased: SERVICE PERFORMED 1. Ensure the battery system is disconnected from UPS and battery system is safe to be worked with. 2. Verify the integrity of the battery rack/cabinet. 3. Remove all modules. 4. Measure and record all open circuit voltages for all units to ensure they can be placed in the string(s) and online. 5. Replace with new units in the exact same orientation as the old units. 6. Replace hardware if supplied with the new batteries. If not supplied, inspect, clean and neutralize the existing cables and clean the racks/trays from any possible leaking batteries. 7. Clean any corrosion from cables if re-using existing cables and clean the racks/trays from any possible leaking batteries. 8. Add a thin coat of anti-corrosion inhibitor to the face of the connector and to the contact surface of the battery terminal or as directed by the battery manufacturer. 9. Install tab washers for battery monitoring senses leads. 10. Torque all connections to the specific “inch pound” requirement specified by the manufacturer of the battery. 11. Ensure all battery monitoring wires are connected properly, if battery monitoring is present. 12. Verify that no ground faults exist prior to energizing the battery. 13. Return the battery system to normal float per the manufacturer’s guidelines. 14. Measure and record the total battery float voltage (at the battery). 15. Measure and record charging current. 16. Measure and record the overall AC ripple voltage. 17. Measure and record the overall AC ripple current. 18. Measure and record the ambient temperature. 19. Measure and record 100% of the jar temperatures. 20. Measure and record the float voltage of all jars. 21. Commission the Alber monitor (if present) following the standard commissioning procedures. 22. Provide the battery the proper Freshening charge per the manufacturer’s guidelines. 23. Clean the site of any foreign materials left behind. 24. Prepare batteries for recycling and transportation (wrap the batteries with plastic wrap to secure them to the pallets)

    Anticipated Cost: $41,000

    Sole Source Justification: Factory Training • Vertiv Services’ customer engineers (CEs) are required to have completed a two-part comprehensive training program before entering a customer’s site. • This program includes more than 110 hours of core training such as fundamentals of data center applications, and electrical and personal safety; more than 400 hours of product-specific and structured on-the-job training; and at least another 200 hours of training on elective topics. • Vertiv Services’ CEs keep their level of training up to date by participation in at least 20 hours of new and refresher training courses each year. • No other organization is authorized to have their field technicians participate in maintenance training programs for Liebert solutions. Startup Services • The standard factory warranty for Liebert three-phase UPS units is active for 12 months from the date of startup and is only valid with startup by a Vertiv Services CE. • Startup performed by an outside service organization reduces the equipment warranty to 90 days with coverage for parts only. Maintenance and Troubleshooting Information • Vertiv Services’ CEs have instant access to Technical Knowledge Online (TKO). This database includes the latest in maintenance and troubleshooting techniques specific to Liebert equipment. • The information available through TKO is only accessible to Vertiv Services’ CEs and includes proprietary information like equipment schematics and assembly drawings. • Access to the proprietary software used in Liebert UPS units allows Vertiv Services’ CEs to properly configure your UPS and to be more informed for a superior level of service. • Through Power Technical Support (PTS), Vertiv Services’ CEs have access to the engineers who designed and built your power equipment. Part Availability • Part support is available to all customers and service providers. • Part priority is given to Vertiv Services’ contract customers to make certain that contractual obligations are met. • To guarantee availability for contract customers, standard lead times apply for all part orders from non-contract customers and outside service providers. Technical Support • PTS exists solely to support Vertiv’s field service organization and is not available to outside service organizations. • PTS is comprised of long-tenured factory engineers who are experts in servicing, troubleshooting, and maintaining Liebert equipment. PTS engineers engage in complex startup activities, support the Vertiv Services CE in difficult troubleshooting situations, and develop equipment modifications that improve system performance. Field Modifications – Field Change Notice (FCN) • The FCN process for Liebert equipment is managed by PTS and factory personnel, and is not available to outside service organizations. • The FCN process allows for engineering improvements to be made to the equipment as soon as an enhancement has been identified. These FCNs enhance the safety and reliability of Liebert power systems. • Safety related FCNs are distributed to the Vertiv customer contact on file. Contract customers are automatically notified and scheduled for installation. • Technical FCN enhancements are only available, at no charge, to Vertiv contract customers We have a current maintenance and warranty contract with Vertiv for our IT and 911 Operations UPS systems. Vertiv will only cover the warranty if the batteries are purchased and installed by them.

    Background

    This item is replacement of parts, for a UPS, that is critical to our IT and 911 operations.  We currently have a warranty and service contract that does not cover this, but do not wish to void any warranty with this equipment. 

    Project Details

    • Reference ID: Sole Source-26-018
    • Department: Department of Public Works
    • Department Head: Christopher Day (Commissioner of Public Works)

    Important Dates

    • Questions Due: 2026-08-03T04:00:00.000Z

    Evaluation Criteria

    • Summary

      THIS IS NOT A COMPETITIVE BID

      The County of Ontario intends to recommend the issuance of a Sole Source award to Vertiv Corporation for SERVICE PERFORMED 1. Ensure the battery system is disconnected from UPS and battery system is safe to be worked with. 2. Verify the integrity of the battery rack/cabinet. 3. Remove all modules. 4. Measure and record all open circuit voltages for all units to ensure they can be placed in the string(s) and online. 5. Replace with new units in the exact same orientation as the old units. 6. Replace hardware if supplied with the new batteries. If not supplied, inspect, clean and neutralize the existing cables and clean the racks/trays from any possible leaking batteries. 7. Clean any corrosion from cables if re-using existing cables and clean the racks/trays from any possible leaking batteries. 8. Add a thin coat of anti-corrosion inhibitor to the face of the connector and to the contact surface of the battery terminal or as directed by the battery manufacturer. 9. Install tab washers for battery monitoring senses leads. 10. Torque all connections to the specific “inch pound” requirement specified by the manufacturer of the battery. 11. Ensure all battery monitoring wires are connected properly, if battery monitoring is present. 12. Verify that no ground faults exist prior to energizing the battery. 13. Return the battery system to normal float per the manufacturer’s guidelines. 14. Measure and record the total battery float voltage (at the battery). 15. Measure and record charging current. 16. Measure and record the overall AC ripple voltage. 17. Measure and record the overall AC ripple current. 18. Measure and record the ambient temperature. 19. Measure and record 100% of the jar temperatures. 20. Measure and record the float voltage of all jars. 21. Commission the Alber monitor (if present) following the standard commissioning procedures. 22. Provide the battery the proper Freshening charge per the manufacturer’s guidelines. 23. Clean the site of any foreign materials left behind. 24. Prepare batteries for recycling and transportation (wrap the batteries with plastic wrap to secure them to the pallets) Any purchase order resulting from this proposed sole source will be made in accordance with the laws governing the purchasing processes of the County of Ontario. Any responses received as a result of this Notice of Intent shall be considered solely for the purpose of determining whether to conduct a competitive procurement in the future. Responses will not be considered as proposals, bids, or quotes.

      The Purchasing Department has received a request to make the following sole-source procurement:

      Requesting Department/Office: Department of Public Works

      Product and/or services to be purchased: SERVICE PERFORMED 1. Ensure the battery system is disconnected from UPS and battery system is safe to be worked with. 2. Verify the integrity of the battery rack/cabinet. 3. Remove all modules. 4. Measure and record all open circuit voltages for all units to ensure they can be placed in the string(s) and online. 5. Replace with new units in the exact same orientation as the old units. 6. Replace hardware if supplied with the new batteries. If not supplied, inspect, clean and neutralize the existing cables and clean the racks/trays from any possible leaking batteries. 7. Clean any corrosion from cables if re-using existing cables and clean the racks/trays from any possible leaking batteries. 8. Add a thin coat of anti-corrosion inhibitor to the face of the connector and to the contact surface of the battery terminal or as directed by the battery manufacturer. 9. Install tab washers for battery monitoring senses leads. 10. Torque all connections to the specific “inch pound” requirement specified by the manufacturer of the battery. 11. Ensure all battery monitoring wires are connected properly, if battery monitoring is present. 12. Verify that no ground faults exist prior to energizing the battery. 13. Return the battery system to normal float per the manufacturer’s guidelines. 14. Measure and record the total battery float voltage (at the battery). 15. Measure and record charging current. 16. Measure and record the overall AC ripple voltage. 17. Measure and record the overall AC ripple current. 18. Measure and record the ambient temperature. 19. Measure and record 100% of the jar temperatures. 20. Measure and record the float voltage of all jars. 21. Commission the Alber monitor (if present) following the standard commissioning procedures. 22. Provide the battery the proper Freshening charge per the manufacturer’s guidelines. 23. Clean the site of any foreign materials left behind. 24. Prepare batteries for recycling and transportation (wrap the batteries with plastic wrap to secure them to the pallets)

      Anticipated Cost: $41,000

      Sole Source Justification: Factory Training • Vertiv Services’ customer engineers (CEs) are required to have completed a two-part comprehensive training program before entering a customer’s site. • This program includes more than 110 hours of core training such as fundamentals of data center applications, and electrical and personal safety; more than 400 hours of product-specific and structured on-the-job training; and at least another 200 hours of training on elective topics. • Vertiv Services’ CEs keep their level of training up to date by participation in at least 20 hours of new and refresher training courses each year. • No other organization is authorized to have their field technicians participate in maintenance training programs for Liebert solutions. Startup Services • The standard factory warranty for Liebert three-phase UPS units is active for 12 months from the date of startup and is only valid with startup by a Vertiv Services CE. • Startup performed by an outside service organization reduces the equipment warranty to 90 days with coverage for parts only. Maintenance and Troubleshooting Information • Vertiv Services’ CEs have instant access to Technical Knowledge Online (TKO). This database includes the latest in maintenance and troubleshooting techniques specific to Liebert equipment. • The information available through TKO is only accessible to Vertiv Services’ CEs and includes proprietary information like equipment schematics and assembly drawings. • Access to the proprietary software used in Liebert UPS units allows Vertiv Services’ CEs to properly configure your UPS and to be more informed for a superior level of service. • Through Power Technical Support (PTS), Vertiv Services’ CEs have access to the engineers who designed and built your power equipment. Part Availability • Part support is available to all customers and service providers. • Part priority is given to Vertiv Services’ contract customers to make certain that contractual obligations are met. • To guarantee availability for contract customers, standard lead times apply for all part orders from non-contract customers and outside service providers. Technical Support • PTS exists solely to support Vertiv’s field service organization and is not available to outside service organizations. • PTS is comprised of long-tenured factory engineers who are experts in servicing, troubleshooting, and maintaining Liebert equipment. PTS engineers engage in complex startup activities, support the Vertiv Services CE in difficult troubleshooting situations, and develop equipment modifications that improve system performance. Field Modifications – Field Change Notice (FCN) • The FCN process for Liebert equipment is managed by PTS and factory personnel, and is not available to outside service organizations. • The FCN process allows for engineering improvements to be made to the equipment as soon as an enhancement has been identified. These FCNs enhance the safety and reliability of Liebert power systems. • Safety related FCNs are distributed to the Vertiv customer contact on file. Contract customers are automatically notified and scheduled for installation. • Technical FCN enhancements are only available, at no charge, to Vertiv contract customers We have a current maintenance and warranty contract with Vertiv for our IT and 911 Operations UPS systems. Vertiv will only cover the warranty if the batteries are purchased and installed by them.

    • Important Instructions for Submittal

      Action To Be Taken:

      No action is required if you agree this proposed purchase is a valid sole-source. If you do not agree that this proposed purchase is a sole source, you may respond with a statement regarding capability to provide the specified procurement. Interested firms will be considered only if they respond with clear and convincing documentation that they are capable of meeting or exceeding the requirements stated herein.

      Please do not submit a bid for this public posting.

    • Vertiv sole source justification

      This item is replacement of parts, for a UPS, that is critical to our IT and 911 operations.  We currently have a warranty and service contract that does not cover this, but do not wish to void any warranty with this equipment. 

    • Contact Information

      Jenifer Langer

      Purchasing Director

      jenifer.langer@ontariocountyny.gov

      (585) 396-4444

    • Timeline

      Thursday, July 23, 2026

      Thursday, August 6, 2026, at 4:00 pm

    Submission Requirements

    • Response (required)

      If your firm feels it can provide this type of good/service, explain in this field.

    • What is the name of the Sole Source Vendor? (required)
    • What is the product or service being purchased? (required)
    • Which department is requesting this Sole Source? (required)
    • What is the anticipated cost of this purchase? (required)
    • What is the sole source justification? (required)

    Key dates

    1. July 23, 2026Published
    2. August 6, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.