Active SLED Opportunity · OKLAHOMA · CITY OF ENID
AI Summary
City of Enid seeks bids for relocating a waterline on South Tyler St. & Owen K. Garriott Road to support US 412 Highway improvements. The project includes pipe installation, fire hydrant work, concrete repairs, and traffic control. Bids due May 13, 2026.
This project relocated a waterline to accommodate US 412 Highway improvements being done by ODOT. **Project Type**: ITB - Invitation to Bid (Formal) **Source ID**: PU.AG.USA.1158120.C16639226 **Piggyback Contract**: No **Question Acceptance Deadline**: 05/01/2026 06:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic or Physical Bid Submission **Owner Organization**: City of Enid **Reference Number**: 0000420150 **Pricing**: Item Based **Bid Documents List**: | Question Name | Question Description | Mandatory | |---|---|---| | Calendar Days | Please enter in your calendar days. | Yes | **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Recommended | Event date: 04/29/2026 11:00 AM EDT | Location: Conference Room B & via Zoom | Event Note: Topic: Pre-Bid: South Tyler Street & US412 Waterline Relocation Time: Apr 29, 2026 10:00 AM Central Time (US and Canada) Join Zoom Meeting https://us02web.zoom.us/j/86179236923?pwd=8JlvagNboM3hphktyDtaA3gZ2NePsw.1 Meeting ID: 861 7923 6923 Passcode: 890021 **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Base Bid Next W-2604C-Base Bid Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 8" PVC DR 18 Materials Linear Foot/Feet 43 6 8" PVC DR 18 Installation by Trench (Complete in Place) Linear Foot/Feet 43 7 8" PVC DR 18 Interlocking Materials Linear Foot/Feet 33 8 8" PVC DR 18 Interlocking by Boring (Complete in Place) Linear Foot/Feet 33 9 *Fire Hydrant Assembly Complete in Place Each 1 10 Ductile Iron Fittings Pound 857 11 *Type A Aggregate Backfill Under Pavement Cubic Yard 110 12 *Single Short Service (1") Installation Each 1 13 *Single Long Service (1") Installation Each 1 14 *8" Gate Valve & Box Complete in Place Each 1 15 Pressure Testing and Disinfection Complete in Place Each 1 16 *Remove Fire Hydrant Each 1 17 Tie to Existing Waterline Each 2 18 *Concrete Street & Alley Repair, Complete in Place Square Yard 110 19 Concrete Sidewalk Repair, Complete in Place Square Yard 72 20 Solid Slab Sodding Square Yard 33 21 Construction Sign, Complete in Place Each 1 | Next W-2604C-Base Bid Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 8" PVC DR 18 Materials Linear Foot/Feet 43 6 8" PVC DR 18 Installation by Trench (Complete in Place) Linear Foot/Feet 43 7 8" PVC DR 18 Interlocking Materials Linear Foot/Feet 33 8 8" PVC DR 18 Interlocking by Boring (Complete in Place) Linear Foot/Feet 33 9 *Fire Hydrant Assembly Complete in Place Each 1 10 Ductile Iron Fittings Pound 857 11 *Type A Aggregate Backfill Under Pavement Cubic Yard 110 12 *Single Short Service (1") Installation Each 1 13 *Single Long Service (1") Installation Each 1 14 *8" Gate Valve & Box Complete in Place Each 1 15 Pressure Testing and Disinfection Complete in Place Each 1 16 *Remove Fire Hydrant Each 1 17 Tie to Existing Waterline Each 2 18 *Concrete Street & Alley Repair, Complete in Place Square Yard 110 19 Concrete Sidewalk Repair, Complete in Place Square Yard 72 20 Solid Slab Sodding Square Yard 33 21 Construction Sign, Complete in Place Each 1 | Code Description UOM Qty | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 8" PVC DR 18 Materials Linear Foot/Feet 43 6 8" PVC DR 18 Installation by Trench (Complete in Place) Linear Foot/Feet 43 7 8" PVC DR 18 Interlocking Materials Linear Foot/Feet 33 8 8" PVC DR 18 Interlocking by Boring (Complete in Place) Linear Foot/Feet 33 9 *Fire Hydrant Assembly Complete in Place Each 1 10 Ductile Iron Fittings Pound 857 11 *Type A Aggregate Backfill Under Pavement Cubic Yard 110 12 *Single Short Service (1") Installation Each 1 13 *Single Long Service (1") Installation Each 1 14 *8" Gate Valve & Box Complete in Place Each 1 15 Pressure Testing and Disinfection Complete in Place Each 1 16 *Remove Fire Hydrant Each 1 17 Tie to Existing Waterline Each 2 18 *Concrete Street & Alley Repair, Complete in Place Square Yard 110 19 Concrete Sidewalk Repair, Complete in Place Square Yard 72 20 Solid Slab Sodding Square Yard 33 21 Construction Sign, Complete in Place Each 1 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | 8" PVC DR 18 Materials | Linear Foot/Feet | 43 | 6 | 8" PVC DR 18 Installation by Trench (Complete in Place) | Linear Foot/Feet | 43 | 7 | 8" PVC DR 18 Interlocking Materials | Linear Foot/Feet | 33 | 8 | 8" PVC DR 18 Interlocking by Boring (Complete in Place) | Linear Foot/Feet | 33 | 9 | *Fire Hydrant Assembly Complete in Place | Each | 1 | 10 | Ductile Iron Fittings | Pound | 857 | 11 | *Type A Aggregate Backfill Under Pavement | Cubic Yard | 110 | 12 | *Single Short Service (1") Installation | Each | 1 | 13 | *Single Long Service (1") Installation | Each | 1 | 14 | *8" Gate Valve & Box Complete in Place | Each | 1 | 15 | Pressure Testing and Disinfection Complete in Place | Each | 1 | 16 | *Remove Fire Hydrant | Each | 1 | 17 | Tie to Existing Waterline | Each | 2 | 18 | *Concrete Street & Alley Repair, Complete in Place | Square Yard | 110 | 19 | Concrete Sidewalk Repair, Complete in Place | Square Yard | 72 | 20 | Solid Slab Sodding | Square Yard | 33 | 21 | Construction Sign, Complete in Place | Each | 1 | | | | Next W-2604C-Base Bid Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 8" PVC DR 18 Materials Linear Foot/Feet 43 6 8" PVC DR 18 Installation by Trench (Complete in Place) Linear Foot/Feet 43 7 8" PVC DR 18 Interlocking Materials Linear Foot/Feet 33 8 8" PVC DR 18 Interlocking by Boring (Complete in Place) Linear Foot/Feet 33 9 *Fire Hydrant Assembly Complete in Place Each 1 10 Ductile Iron Fittings Pound 857 11 *Type A Aggregate Backfill Under Pavement Cubic Yard 110 12 *Single Short Service (1") Installation Each 1 13 *Single Long Service (1") Installation Each 1 14 *8" Gate Valve & Box Complete in Place Each 1 15 Pressure Testing and Disinfection Complete in Place Each 1 16 *Remove Fire Hydrant Each 1 17 Tie to Existing Waterline Each 2 18 *Concrete Street & Alley Repair, Complete in Place Square Yard 110 19 Concrete Sidewalk Repair, Complete in Place Square Yard 72 20 Solid Slab Sodding Square Yard 33 21 Construction Sign, Complete in Place Each 1 | Code Description UOM Qty | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 8" PVC DR 18 Materials Linear Foot/Feet 43 6 8" PVC DR 18 Installation by Trench (Complete in Place) Linear Foot/Feet 43 7 8" PVC DR 18 Interlocking Materials Linear Foot/Feet 33 8 8" PVC DR 18 Interlocking by Boring (Complete in Place) Linear Foot/Feet 33 9 *Fire Hydrant Assembly Complete in Place Each 1 10 Ductile Iron Fittings Pound 857 11 *Type A Aggregate Backfill Under Pavement Cubic Yard 110 12 *Single Short Service (1") Installation Each 1 13 *Single Long Service (1") Installation Each 1 14 *8" Gate Valve & Box Complete in Place Each 1 15 Pressure Testing and Disinfection Complete in Place Each 1 16 *Remove Fire Hydrant Each 1 17 Tie to Existing Waterline Each 2 18 *Concrete Street & Alley Repair, Complete in Place Square Yard 110 19 Concrete Sidewalk Repair, Complete in Place Square Yard 72 20 Solid Slab Sodding Square Yard 33 21 Construction Sign, Complete in Place Each 1 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | 8" PVC DR 18 Materials | Linear Foot/Feet | 43 | 6 | 8" PVC DR 18 Installation by Trench (Complete in Place) | Linear Foot/Feet | 43 | 7 | 8" PVC DR 18 Interlocking Materials | Linear Foot/Feet | 33 | 8 | 8" PVC DR 18 Interlocking by Boring (Complete in Place) | Linear Foot/Feet | 33 | 9 | *Fire Hydrant Assembly Complete in Place | Each | 1 | 10 | Ductile Iron Fittings | Pound | 857 | 11 | *Type A Aggregate Backfill Under Pavement | Cubic Yard | 110 | 12 | *Single Short Service (1") Installation | Each | 1 | 13 | *Single Long Service (1") Installation | Each | 1 | 14 | *8" Gate Valve & Box Complete in Place | Each | 1 | 15 | Pressure Testing and Disinfection Complete in Place | Each | 1 | 16 | *Remove Fire Hydrant | Each | 1 | 17 | Tie to Existing Waterline | Each | 2 | 18 | *Concrete Street & Alley Repair, Complete in Place | Square Yard | 110 | 19 | Concrete Sidewalk Repair, Complete in Place | Square Yard | 72 | 20 | Solid Slab Sodding | Square Yard | 33 | 21 | Construction Sign, Complete in Place | Each | 1 | | | Code Description UOM Qty | | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 8" PVC DR 18 Materials Linear Foot/Feet 43 6 8" PVC DR 18 Installation by Trench (Complete in Place) Linear Foot/Feet 43 7 8" PVC DR 18 Interlocking Materials Linear Foot/Feet 33 8 8" PVC DR 18 Interlocking by Boring (Complete in Place) Linear Foot/Feet 33 9 *Fire Hydrant Assembly Complete in Place Each 1 10 Ductile Iron Fittings Pound 857 11 *Type A Aggregate Backfill Under Pavement Cubic Yard 110 12 *Single Short Service (1") Installation Each 1 13 *Single Long Service (1") Installation Each 1 14 *8" Gate Valve & Box Complete in Place Each 1 15 Pressure Testing and Disinfection Complete in Place Each 1 16 *Remove Fire Hydrant Each 1 17 Tie to Existing Waterline Each 2 18 *Concrete Street & Alley Repair, Complete in Place Square Yard 110 19 Concrete Sidewalk Repair, Complete in Place Square Yard 72 20 Solid Slab Sodding Square Yard 33 21 Construction Sign, Complete in Place Each 1 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | 8" PVC DR 18 Materials | Linear Foot/Feet | 43 | 6 | 8" PVC DR 18 Installation by Trench (Complete in Place) | Linear Foot/Feet | 43 | 7 | 8" PVC DR 18 Interlocking Materials | Linear Foot/Feet | 33 | 8 | 8" PVC DR 18 Interlocking by Boring (Complete in Place) | Linear Foot/Feet | 33 | 9 | *Fire Hydrant Assembly Complete in Place | Each | 1 | 10 | Ductile Iron Fittings | Pound | 857 | 11 | *Type A Aggregate Backfill Under Pavement | Cubic Yard | 110 | 12 | *Single Short Service (1") Installation | Each | 1 | 13 | *Single Long Service (1") Installation | Each | 1 | 14 | *8" Gate Valve & Box Complete in Place | Each | 1 | 15 | Pressure Testing and Disinfection Complete in Place | Each | 1 | 16 | *Remove Fire Hydrant | Each | 1 | 17 | Tie to Existing Waterline | Each | 2 | 18 | *Concrete Street & Alley Repair, Complete in Place | Square Yard | 110 | 19 | Concrete Sidewalk Repair, Complete in Place | Square Yard | 72 | 20 | Solid Slab Sodding | Square Yard | 33 | 21 | Construction Sign, Complete in Place | Each | 1 | | | 1 | Mobilization | Lump-Sum | 1 | | 2 | Bonds & Insurance | Lump-Sum | 1 | | 3 | Construction Staking | Lump-Sum | 1 | | 4 | Construction Traffic Control | Lump-Sum | 1 | | 5 | 8" PVC DR 18 Materials | Linear Foot/Feet | 43 | | 6 | 8" PVC DR 18 Installation by Trench (Complete in Place) | Linear Foot/Feet | 43 | | 7 | 8" PVC DR 18 Interlocking Materials | Linear Foot/Feet | 33 | | 8 | 8" PVC DR 18 Interlocking by Boring (Complete in Place) | Linear Foot/Feet | 33 | | 9 | *Fire Hydrant Assembly Complete in Place | Each | 1 | | 10 | Ductile Iron Fittings | Pound | 857 | | 11 | *Type A Aggregate Backfill Under Pavement | Cubic Yard | 110 | | 12 | *Single Short Service (1") Installation | Each | 1 | | 13 | *Single Long Service (1") Installation | Each | 1 | | 14 | *8" Gate Valve & Box Complete in Place | Each | 1 | | 15 | Pressure Testing and Disinfection Complete in Place | Each | 1 | | 16 | *Remove Fire Hydrant | Each | 1 | | 17 | Tie to Existing Waterline | Each | 2 | | 18 | *Concrete Street & Alley Repair, Complete in Place | Square Yard | 110 | | 19 | Concrete Sidewalk Repair, Complete in Place | Square Yard | 72 | | 20 | Solid Slab Sodding | Square Yard | 33 | | 21 | Construction Sign, Complete in Place | Each | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next W-2604C-Base Bid Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 8" PVC DR 18 Materials Linear Foot/Feet 43 6 8" PVC DR 18 Installation by Trench (Complete in Place) Linear Foot/Feet 43 7 8" PVC DR 18 Interlocking Materials Linear Foot/Feet 33 8 8" PVC DR 18 Interlocking by Boring (Complete in Place) Linear Foot/Feet 33 9 *Fire Hydrant Assembly Complete in Place Each 1 10 Ductile Iron Fittings Pound 857 11 *Type A Aggregate Backfill Under Pavement Cubic Yard 110 12 *Single Short Service (1") Installation Each 1 13 *Single Long Service (1") Installation Each 1 14 *8" Gate Valve & Box Complete in Place Each 1 15 Pressure Testing and Disinfection Complete in Place Each 1 16 *Remove Fire Hydrant Each 1 17 Tie to Existing Waterline Each 2 18 *Concrete Street & Alley Repair, Complete in Place Square Yard 110 19 Concrete Sidewalk Repair, Complete in Place Square Yard 72 20 Solid Slab Sodding Square Yard 33 21 Construction Sign, Complete in Place Each 1 | Code Description UOM Qty | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 8" PVC DR 18 Materials Linear Foot/Feet 43 6 8" PVC DR 18 Installation by Trench (Complete in Place) Linear Foot/Feet 43 7 8" PVC DR 18 Interlocking Materials Linear Foot/Feet 33 8 8" PVC DR 18 Interlocking by Boring (Complete in Place) Linear Foot/Feet 33 9 *Fire Hydrant Assembly Complete in Place Each 1 10 Ductile Iron Fittings Pound 857 11 *Type A Aggregate Backfill Under Pavement Cubic Yard 110 12 *Single Short Service (1") Installation Each 1 13 *Single Long Service (1") Installation Each 1 14 *8" Gate Valve & Box Complete in Place Each 1 15 Pressure Testing and Disinfection Complete in Place Each 1 16 *Remove Fire Hydrant Each 1 17 Tie to Existing Waterline Each 2 18 *Concrete Street & Alley Repair, Complete in Place Square Yard 110 19 Concrete Sidewalk Repair, Complete in Place Square Yard 72 20 Solid Slab Sodding Square Yard 33 21 Construction Sign, Complete in Place Each 1 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | 8" PVC DR 18 Materials | Linear Foot/Feet | 43 | 6 | 8" PVC DR 18 Installation by Trench (Complete in Place) | Linear Foot/Feet | 43 | 7 | 8" PVC DR 18 Interlocking Materials | Linear Foot/Feet | 33 | 8 | 8" PVC DR 18 Interlocking by Boring (Complete in Place) | Linear Foot/Feet | 33 | 9 | *Fire Hydrant Assembly Complete in Place | Each | 1 | 10 | Ductile Iron Fittings | Pound | 857 | 11 | *Type A Aggregate Backfill Under Pavement | Cubic Yard | 110 | 12 | *Single Short Service (1") Installation | Each | 1 | 13 | *Single Long Service (1") Installation | Each | 1 | 14 | *8" Gate Valve & Box Complete in Place | Each | 1 | 15 | Pressure Testing and Disinfection Complete in Place | Each | 1 | 16 | *Remove Fire Hydrant | Each | 1 | 17 | Tie to Existing Waterline | Each | 2 | 18 | *Concrete Street & Alley Repair, Complete in Place | Square Yard | 110 | 19 | Concrete Sidewalk Repair, Complete in Place | Square Yard | 72 | 20 | Solid Slab Sodding | Square Yard | 33 | 21 | Construction Sign, Complete in Place | Each | 1 | | | Code Description UOM Qty | | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 8" PVC DR 18 Materials Linear Foot/Feet 43 6 8" PVC DR 18 Installation by Trench (Complete in Place) Linear Foot/Feet 43 7 8" PVC DR 18 Interlocking Materials Linear Foot/Feet 33 8 8" PVC DR 18 Interlocking by Boring (Complete in Place) Linear Foot/Feet 33 9 *Fire Hydrant Assembly Complete in Place Each 1 10 Ductile Iron Fittings Pound 857 11 *Type A Aggregate Backfill Under Pavement Cubic Yard 110 12 *Single Short Service (1") Installation Each 1 13 *Single Long Service (1") Installation Each 1 14 *8" Gate Valve & Box Complete in Place Each 1 15 Pressure Testing and Disinfection Complete in Place Each 1 16 *Remove Fire Hydrant Each 1 17 Tie to Existing Waterline Each 2 18 *Concrete Street & Alley Repair, Complete in Place Square Yard 110 19 Concrete Sidewalk Repair, Complete in Place Square Yard 72 20 Solid Slab Sodding Square Yard 33 21 Construction Sign, Complete in Place Each 1 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | 8" PVC DR 18 Materials | Linear Foot/Feet | 43 | 6 | 8" PVC DR 18 Installation by Trench (Complete in Place) | Linear Foot/Feet | 43 | 7 | 8" PVC DR 18 Interlocking Materials | Linear Foot/Feet | 33 | 8 | 8" PVC DR 18 Interlocking by Boring (Complete in Place) | Linear Foot/Feet | 33 | 9 | *Fire Hydrant Assembly Complete in Place | Each | 1 | 10 | Ductile Iron Fittings | Pound | 857 | 11 | *Type A Aggregate Backfill Under Pavement | Cubic Yard | 110 | 12 | *Single Short Service (1") Installation | Each | 1 | 13 | *Single Long Service (1") Installation | Each | 1 | 14 | *8" Gate Valve & Box Complete in Place | Each | 1 | 15 | Pressure Testing and Disinfection Complete in Place | Each | 1 | 16 | *Remove Fire Hydrant | Each | 1 | 17 | Tie to Existing Waterline | Each | 2 | 18 | *Concrete Street & Alley Repair, Complete in Place | Square Yard | 110 | 19 | Concrete Sidewalk Repair, Complete in Place | Square Yard | 72 | 20 | Solid Slab Sodding | Square Yard | 33 | 21 | Construction Sign, Complete in Place | Each | 1 | | | 1 | Mobilization | Lump-Sum | 1 | | 2 | Bonds & Insurance | Lump-Sum | 1 | | 3 | Construction Staking | Lump-Sum | 1 | | 4 | Construction Traffic Control | Lump-Sum | 1 | | 5 | 8" PVC DR 18 Materials | Linear Foot/Feet | 43 | | 6 | 8" PVC DR 18 Installation by Trench (Complete in Place) | Linear Foot/Feet | 43 | | 7 | 8" PVC DR 18 Interlocking Materials | Linear Foot/Feet | 33 | | 8 | 8" PVC DR 18 Interlocking by Boring (Complete in Place) | Linear Foot/Feet | 33 | | 9 | *Fire Hydrant Assembly Complete in Place | Each | 1 | | 10 | Ductile Iron Fittings | Pound | 857 | | 11 | *Type A Aggregate Backfill Under Pavement | Cubic Yard | 110 | | 12 | *Single Short Service (1") Installation | Each | 1 | | 13 | *Single Long Service (1") Installation | Each | 1 | | 14 | *8" Gate Valve & Box Complete in Place | Each | 1 | | 15 | Pressure Testing and Disinfection Complete in Place | Each | 1 | | 16 | *Remove Fire Hydrant | Each | 1 | | 17 | Tie to Existing Waterline | Each | 2 | | 18 | *Concrete Street & Alley Repair, Complete in Place | Square Yard | 110 | | 19 | Concrete Sidewalk Repair, Complete in Place | Square Yard | 72 | | 20 | Solid Slab Sodding | Square Yard | 33 | | 21 | Construction Sign, Complete in Place | Each | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Code Description UOM Qty | | 1 Mobilization Lump-Sum 1 2 Bonds & Insurance Lump-Sum 1 3 Construction Staking Lump-Sum 1 4 Construction Traffic Control Lump-Sum 1 5 8" PVC DR 18 Materials Linear Foot/Feet 43 6 8" PVC DR 18 Installation by Trench (Complete in Place) Linear Foot/Feet 43 7 8" PVC DR 18 Interlocking Materials Linear Foot/Feet 33 8 8" PVC DR 18 Interlocking by Boring (Complete in Place) Linear Foot/Feet 33 9 *Fire Hydrant Assembly Complete in Place Each 1 10 Ductile Iron Fittings Pound 857 11 *Type A Aggregate Backfill Under Pavement Cubic Yard 110 12 *Single Short Service (1") Installation Each 1 13 *Single Long Service (1") Installation Each 1 14 *8" Gate Valve & Box Complete in Place Each 1 15 Pressure Testing and Disinfection Complete in Place Each 1 16 *Remove Fire Hydrant Each 1 17 Tie to Existing Waterline Each 2 18 *Concrete Street & Alley Repair, Complete in Place Square Yard 110 19 Concrete Sidewalk Repair, Complete in Place Square Yard 72 20 Solid Slab Sodding Square Yard 33 21 Construction Sign, Complete in Place Each 1 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds & Insurance | Lump-Sum | 1 | 3 | Construction Staking | Lump-Sum | 1 | 4 | Construction Traffic Control | Lump-Sum | 1 | 5 | 8" PVC DR 18 Materials | Linear Foot/Feet | 43 | 6 | 8" PVC DR 18 Installation by Trench (Complete in Place) | Linear Foot/Feet | 43 | 7 | 8" PVC DR 18 Interlocking Materials | Linear Foot/Feet | 33 | 8 | 8" PVC DR 18 Interlocking by Boring (Complete in Place) | Linear Foot/Feet | 33 | 9 | *Fire Hydrant Assembly Complete in Place | Each | 1 | 10 | Ductile Iron Fittings | Pound | 857 | 11 | *Type A Aggregate Backfill Under Pavement | Cubic Yard | 110 | 12 | *Single Short Service (1") Installation | Each | 1 | 13 | *Single Long Service (1") Installation | Each | 1 | 14 | *8" Gate Valve & Box Complete in Place | Each | 1 | 15 | Pressure Testing and Disinfection Complete in Place | Each | 1 | 16 | *Remove Fire Hydrant | Each | 1 | 17 | Tie to Existing Waterline | Each | 2 | 18 | *Concrete Street & Alley Repair, Complete in Place | Square Yard | 110 | 19 | Concrete Sidewalk Repair, Complete in Place | Square Yard | 72 | 20 | Solid Slab Sodding | Square Yard | 33 | 21 | Construction Sign, Complete in Place | Each | 1 | | | 1 | Mobilization | Lump-Sum | 1 | | 2 | Bonds & Insurance | Lump-Sum | 1 | | 3 | Construction Staking | Lump-Sum | 1 | | 4 | Construction Traffic Control | Lump-Sum | 1 | | 5 | 8" PVC DR 18 Materials | Linear Foot/Feet | 43 | | 6 | 8" PVC DR 18 Installation by Trench (Complete in Place) | Linear Foot/Feet | 43 | | 7 | 8" PVC DR 18 Interlocking Materials | Linear Foot/Feet | 33 | | 8 | 8" PVC DR 18 Interlocking by Boring (Complete in Place) | Linear Foot/Feet | 33 | | 9 | *Fire Hydrant Assembly Complete in Place | Each | 1 | | 10 | Ductile Iron Fittings | Pound | 857 | | 11 | *Type A Aggregate Backfill Under Pavement | Cubic Yard | 110 | | 12 | *Single Short Service (1") Installation | Each | 1 | | 13 | *Single Long Service (1") Installation | Each | 1 | | 14 | *8" Gate Valve & Box Complete in Place | Each | 1 | | 15 | Pressure Testing and Disinfection Complete in Place | Each | 1 | | 16 | *Remove Fire Hydrant | Each | 1 | | 17 | Tie to Existing Waterline | Each | 2 | | 18 | *Concrete Street & Alley Repair, Complete in Place | Square Yard | 110 | | 19 | Concrete Sidewalk Repair, Complete in Place | Square Yard | 72 | | 20 | Solid Slab Sodding | Square Yard | 33 | | 21 | Construction Sign, Complete in Place | Each | 1 |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.