SLED Opportunity · CALIFORNIA · CALIFORNIA
AI Summary
Construction of underground concrete vaults for butterfly valve installation and electrical upgrades at Santa Ana Pipeline Box Springs Turnout, including phased construction to maintain water supply and replacement of bypass pipes at North Park Vault.
This project involves constructing two underground reinforced concrete vaults at the Santa Ana Pipeline Box Springs Turnout to install two department-furnished electric-actuated 108-inch butterfly valves and associated mechanical, electrical, and structural systems. The project also includes electrical upgrades such as generator replacement, generator pad modifications, streetlight relocations, and associated conduits and controls, followed by comprehensive testing and commissioning of mechanical and electrical systems. Construction will be performed in phased outages due to the critical water supply, allowing pipeline operations to resume between stages while final vault work is completed. In addition, the project includes replacement of existing bypass pipes and associated components at North Park Vault. Estimated Cost: $13,300,000 - $14,500,000 To register as a plan holder or bidder, please email doe_specs@water.ca.gov
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.