SLED Opportunity · CALIFORNIA · SOUTH PLACER MUNICIPAL UTILITY DISTRICT
AI Summary
SPMUD seeks a contractor to apply chemical root treatment to over 32,000 feet of mainline pipes, including labor, materials, and traffic control, with pre-treatment root cutting done by SPMUD.
The project scope of work includes the following: Apply Chemical Root Treatment to 113 Mainline Pipe Segments. Diameters ranging from 6-inch to 18-inch and accumulative length totaling 32,223 feet. The Contractor shall furnish all labor, equipment, materials, plant, and supervision to perform the work. SPMUD will perform pre-treatment root cutting at least 6 weeks prior to application of the product. Contractor shall provide traffic control measures, as required by encroachment permit issued by the governing agency.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.