SLED Opportunity · NORTH DAKOTA · OFFICE OF THE ADJUTANT GENERAL - NORTH DAKOTA ARMY NATIONAL GUARD - DIRECTORATE OF INSTALLATIONS AND ENVIRONMENT
AI Summary
RFP for steam line replacement and related construction at Camp Gilbert C. Grafton, North Dakota. Includes general, mechanical, and combined construction with estimated costs from $250K to $1M.
STEAM LINE REPLACEMENT (Area X) Armory Bldg. 6400 Camp Gilbert C. Grafton Devils Lake, North Dakota Project Number 2520 IFB 26-01 General Construction IFB 26-02 Mechanical Construction IFB 26-03 Total Combined Construction Architect's Name: Shultz + Associates Architects Estimated Price Range (Magnitude of Construction): General Construction: Between $250,000 and $500,000. Mechanical Construction: Between $500,000 and $1,000,000. Total Combined Construction: Between $500,000 and $1,000,000. The contractor may use the estimated price range as a tool for estimating bonding or business capacity. An "Estimated Price Range" should NOT be interpreted as an indicator of available funds or as a disclosure of the Government's confidential cost estimate.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.