SLED Opportunity · CALIFORNIA · CITY OF ROSEVILLE
AI Summary
City of Roseville seeks proposals for rehabilitating 1,427 linear feet of 54-inch storm drain pipe with concrete lining and manhole base repairs near Stoney Point Way.
Brief Description of Project: Rehabilitating approximately 1,427 linear feet of existing 54-inch corrugated metal storm drain pipe (near Stoney Point Way and Jamestown Drive) with a concrete spray applied liner and the rehabilitation of two manhole bases. Project Engineer: Laura Salcedo Last Day and Time for Questions/Inquiries: All communications relative to this project shall be conducted through Public Purchase. Questions/inquiries will NOT be accepted after 3 PM on February 17, 2026. For any inconsistencies in the Contract Documents, please refer to the “Contract Components” section of the Standard Construction Specifications for the order of document precedence.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.