SLED Opportunity · COLORADO · COLORADO

    Storm Drainage System Cleaning

    Issued by City of Grand Junction
    localIFBColoradoSol. 7907914103
    Closed
    STATUS
    Closed
    due Dec 19, 2025
    PUBLISHED
    Nov 14, 2025
    Posting date
    JURISDICTION
    Colorado
    local
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    The City of Grand Junction seeks bids for storm drainage system cleaning including labor, equipment, debris removal, video inspections, traffic control, and documentation in Mesa County, Colorado.

    Opportunity details

    Solicitation No.
    7907914103
    Type / RFx
    IFB
    Status
    Active
    Level
    local
    Published Date
    November 14, 2025
    Due Date
    December 19, 2025
    NAICS Code
    237110AI guide
    Jurisdiction
    Colorado
    Agency
    City of Grand Junction

    Description

    The City of Grand Junction is soliciting competitive bids from qualified and interested companies for all labor, equipment, and materials required to perform the Storm Drainage System Cleaning. The Contractor shall perform a thorough cleaning of all existing storm drainage system components as specified in this document. The Contractor shall provide up to six random video pipe inspections to ensure adequate cleaning has been performed. The Contractor shall furnish all materials, tools, supplies, mobilization, heavy equipment, vehicles, and labor necessary for the cleaning, required traffic control, removal and disposal of debris extracted from the storm drainage system, random recorded video spot checking inspections of the storm drainage components, and documentation of storm drainage infrastructure cleaning and inspections. The Contractor shall bear all costs associated with the project. The City of Grand Junction is soliciting competitive bids from qualified and interested companies for all labor, equipment, and materials required to perform the Storm Drainage System Cleaning. The Contractor shall perform a thorough cleaning of all existing storm drainage system components as specified in this document. The Contractor shall provide up to six random video pipe inspections to ensure adequate cleaning has been performed. The Contractor shall furnish all materials, tools, supplies, mobilization, heavy equipment, vehicles, and labor necessary for the cleaning, required traffic control, removal and disposal of debris extracted from the storm drainage system, random recorded video spot checking inspections of the storm drainage components, and documentation of storm drainage infrastructure cleaning and inspections. The Contractor shall bear all costs associated with the project.

    Key dates

    1. November 14, 2025Published
    2. December 19, 2025Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.