SLED Opportunity · CALIFORNIA · CITY OF SANTA CLARITA

    Sunridge Project - Environmental Impact Report

    Issued by City of Santa Clarita
    cityRFPCity of Santa ClaritaSol. 8448042616
    Closed
    STATUS
    Closed
    due Apr 9, 2026
    PUBLISHED
    Mar 10, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    541620
    AI-classified industry

    AI Summary

    City of Santa Clarita seeks services to prepare an Environmental Impact Report for the Sunridge Program. The contract involves environmental assessments and reporting to comply with regulations. Due April 9, 2026.

    Opportunity details

    Solicitation No.
    8448042616
    Type / RFx
    RFP
    Status
    Active
    Level
    city
    Published Date
    March 10, 2026
    Due Date
    April 9, 2026
    NAICS Code
    541620AI guide
    Agency
    City of Santa Clarita

    Description

    The City of Santa Clarita (City) is seeking proposals from qualified consulting firms to create a Project Environmental Impact Report (PEIR) for the Sunridge Specific Plan Project (Project). **Solicitation Type**: RFP - Request for Proposal (Formal) **Source ID**: PU.MU.USA.1480380.C14306401 **Piggyback Contract**: No **Question Acceptance Deadline**: 03/26/2026 02:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: CD Administration **Solicitation Number**: CD-25-26-27 **Reference Number**: 0000414821 **Pricing**: Lump sum **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Response File | Response File | Yes | No | | Notice to Proposers | Notice to Proposers Regarding Contractual Requirements | Yes | No | | Designation of Subcontractors/Subconsultants | Designation of Subcontractors/Subconsultants | Yes | No | | References | References | Yes | No | | Acknowledgement and Acceptance of Scope of Work | Acknowledgement and Acceptance of Scope of Work | Yes | No | | City of Santa Clarita Disclosure Statement | City of Santa Clarita Disclosure Statement | Yes | No | | All signed addendums (if any) | All signed addendums (if any) | No | No | | General Attachments | General Attachments | No | No | **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Cost File | Cost File | Yes | No | **Questions and Answers**: - Q1 Arrow Right Question: Budget Question The RFP indicates that the project description may be revised to address transportation impacts, and as such, other portions of the environmental analysis may require revision. The RFP requests that bidders provide separate costs for these anticipated revisions/additional analyses. As the nature and extent of project description revisions is unknown at this time and can vary widely (as will the affected environmental analyses), would the City consider allowing bidders to include a contingency budget to address these anticipated revisions, instead of including estimated costs to revise the EIR project description, revise environmental analyses, and provide additional peer reviews of revised technical studies? Arrow Right Answer: The City will not consider contingency budgets for additional work. Please refer to the RFP specifications. 03/18/2026 11:40 AM EDT 04/03/2026 11:24 AM EDT - Q2 Arrow Right Question: Water Supply Assessment Will the Applicant provide a Senate Bill 610 Water Supply Assessment for the project? Arrow Right Answer: The project will be subject to a water assessment conducted by the Santa Clarita Valley Water Agency. 03/18/2026 11:41 AM EDT 04/03/2026 11:24 AM EDT - Q3 Arrow Right Question: Environmental Site Assessments Will the Applicant provide environmental site assessments for the project (i.e., Phase I, Phase II if applicable)? Arrow Right Answer: The applicant will provide Phase I and II. 03/18/2026 11:41 AM EDT 04/03/2026 11:24 AM EDT - Q4 Arrow Right Question: Scope of Work The RFP requests a pricing schedule for changes occurring to the project description, including pricing for additional traffic and circulation analysis as well as additional technical studies or expanded analysis from agency comments. Given that the majority of the technical reports are prepared by the Applicant’s consulting team, will any required report revisions needed due to project changes be completed by the original report preparers? Arrow Right Answer: Any revisions to reports provided by the applicant will be completed by the applicant and reviewed by the consultant. 03/18/2026 01:45 PM EDT 04/03/2026 11:24 AM EDT - Q5 Arrow Right Question: Applicant-Prepared Technical Studies The following studies were not included in the list of reports prepared by the applicant. Could you confirm if the following reports have been prepared: Hazards/Hazardous Materials Report (Phase I, II, or other documents if available), Oak Tree Report, Water Supply Assessment, and Public Services/Utilities Studies (Will Serve letters, infrastructure studies, etc.). Arrow Right Answer: The applicant will need to provide these in coordination with other agencies, as needed (e.g., water supply, public services, etc.). 03/25/2026 07:40 PM EDT 04/03/2026 11:24 AM EDT

    Key dates

    1. March 10, 2026Published
    2. April 9, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.