SLED Opportunity · WASHINGTON · PIERCE COUNTY

    Swan Creek Channel Restoration Phase 2

    Issued by Pierce County
    countyRFPPierce CountySol. 239804
    Closed
    STATUS
    Closed
    due Apr 2, 2026
    PUBLISHED
    Mar 11, 2026
    Posting date
    JURISDICTION
    Pierce County
    county
    NAICS CODE
    237990
    AI-classified industry

    AI Summary

    Pierce County seeks contractors for Swan Creek Channel Restoration Phase 2, involving stream channel improvements, engineered log structure installation, erosion control, invasive weed removal, and revegetation within Swan Creek Park.

    Opportunity details

    Solicitation No.
    239804
    Type / RFx
    RFP
    Status
    open
    Level
    county
    Published Date
    March 11, 2026
    Due Date
    April 2, 2026
    NAICS Code
    237990AI guide
    Jurisdiction
    Pierce County
    Agency
    Pierce County

    Description

    This contract provides for the improvement of Swan Creek between 64th Street East and Pioneer Way East and located within Swan Creek Park. The project area is also within two separate jurisdictions, Pierce County and the City of Tacoma.

    Work includes the installation of engineered log structures using multiple material delivery and installation methods. Most of the work will be constructed below the Ordinary High-Water Mark (OHWM) and shall be completed within the permit specified in-water work windows. The work will include stream isolation and flow diversion and localized dewatering. Executing the work will require personnel with demonstratable experience in successful stream channel construction. The work also includes selective clearing and re-incorporation of all salvage woody material into project elements. Work also includes establishing and restoring staging and access areas, traffic control, trail closure, erosion and sediment control, invasive weed removal, seeding, revegetation, and other work in accordance with and described in the Plans and Specifications.

    Project Details

    • Reference ID: 2026-MPW-063
    • Department: Procurement and Contract Division
    • Department Head: Jana Prince (Procurement & Contracts Manager)

    Important Dates

    • Questions Due: 2026-03-26T22:30:00.000Z
    • Pre-Proposal Meeting: 2026-03-25T16:00:00.000Z — A non-mandatory Pre-Bid Site Visit will be held on Wednesday, March 25, 2026, 9:00 AM - 11:00 AM at 2299 East 42nd St. Tacoma, WA 98404 (Park Entrance @ E. 42nd Street & E. Roosevelt Avenue – Swan Creek Park Community Garden, 47.218894, -122.396991). Prospective bidders will have an opportunity to view site conditions and hear an overview of project elements from the Project Engineer. A question-and-answer opportunity will not be provided. Any resulting questions shall be submitted formally through the project procurement portal where responses may be viewed by all prospective bidders.

    Addenda

    • Official Notice #1: Pre-Bid Walk Thru- Meeting Notes (released 2026-03-27T17:52:58.314Z)

    Evaluation Criteria

    • Important Instructions for Electronic Submittal

      Pierce County is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid.

    • Scope of Work or Project Details

      Please refer to attached bid packet for detailed scopes of work.

    Submission Requirements

    • Proposal Documents (required)

      Please Upload your COMPLETE Proposal here.

    • Project Description (required)

      Please provide a brief, one to two paragraph, description of the project.

    Questions & Answers

    Q (No subject): Is there an engineered estimate for this project? Of so what is the range?

    A: Cost Range: $1,500,000.00 to 2,200,000.00, please refer to page 2 of the attached contract provisions.


    Q (Standards for completion): Are there any herbicides that are restricted for the vegetation management portion of this project?

    A: Herbicide use on the projected is restricted. Chemical control is permitted only in specific instances outlined in the Project Specifications. See Specifical Provision, section 8-02.3(3) - Weed and Pest Control, for information on weed removal requirements.


    Key dates

    1. March 11, 2026Published
    2. April 2, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.