Active SLED Opportunity · TEXAS · NEW BRAUNFELS UTILITIES

    Tank Rehabilitation Phase 2 - Kerlick Elevated Storage Tank

    Issued by New Braunfels Utilities
    localRFPNew Braunfels UtilitiesSol. 262198
    Open · 19d remaining
    DAYS TO CLOSE
    19
    due Jun 2, 2026
    PUBLISHED
    May 1, 2026
    Posting date
    JURISDICTION
    New Braunfels
    local
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    New Braunfels Utilities seeks qualified firms for construction services to rehabilitate the Kerlick Elevated Storage Tank, including coating, structural repairs, civil and electrical improvements, and site restoration. Proposals are due by June 2, 2026.

    Opportunity details

    Solicitation No.
    262198
    Type / RFx
    RFP
    Status
    open
    Level
    local
    Published Date
    May 1, 2026
    Due Date
    June 2, 2026
    NAICS Code
    237110AI guide
    State
    Texas
    Agency
    New Braunfels Utilities

    Description

    New Braunfels Utilities (“NBU”) invites the submittal of responses to this Request for Proposals (“RFP”) from qualified firms interested in providing construction services in connection with the construction of the Tank Rehabilitation Phase 2 - Kerlick Elevated Storage Tank (the “Project”).

                       

    The Project has been designed by Freese and Nichols, Inc. The Project is anticipated to include some or all of the following items within its scope: (i) full rehabilitation of the interior and exterior coating systems, including structural repairs and appurtenance replacement for the existing Kerlick 0.75 million gallon (“MG”) steel multi-leg elevated storage tank; (ii) civil site improvements including overflow routing, altitude valve, gates, and fencing; (iii) electrical and instrumentation improvements and heat tracing; (iv) storm water pollution prevention plan; (v) site restoration; and (vi) all other appurtenances necessary to complete the Project.

    Project Details

    • Reference ID: 26-0133
    • Department: Water Engineering
    • Department Head: Adam Willard (Chief Engineer of Water Systems)

    Important Dates

    • Questions Due: 2026-05-15T21:00:00.000Z
    • Pre-Proposal Meeting: 2026-05-11T15:00:00.000Z — Respondents may join the video conference from a computer, tablet, or smartphone at https://teams.microsoft.com/meet/277776356435453?p=XovNtE8Da0X6soLWxL. Respondents may also participate in the video conference by telephone at + 1(469)998-7414. The passcode for the video conference link is ZN2M4oy3, and dial-in conference ID number is 266 002 941#.

    Evaluation Criteria

    • Important Instructions for Electronic Submittal

      The New Braunfels Utilities is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid.

    • Scope of Work or Project Details

      Please see Attachments

    Submission Requirements

    • Proposal Requirements (required)

      Did you read through and confirm that you met all of the proposal requirements including the sections:

      1. General Conditions
      2. Special Provisions and Specifications
    • Did you submit ALL information required in the evaluation criteria? (required)
        1. The Cost of the Work. (weighted at 50%).

       

        1. Proposed Schedule/Contract Time. (weighted at 30%).

       

        1. Past Performance on Similar Projects. The qualifications, reputation, capability and past performance of the contractor and the contractor’s subcontractors and suppliers (to the extent identifiable at the time of proposal submission) on improvement projects of similar size and scope (weighted at 5%).

       

        1. Overall Qualifications, Reputation, Past Relationship with NBU and Public Owners.  This includes the qualifications, reputation, capability, safety record, financial capability, and contractor’s past relationship and experience with NBU or other public entities (weighted at 10%).

       

        1. Available resources to complete the Project. This criterion would include personnel, resources and methodologies commonly used by your firm that may be applicable to the project categories (weighted at 2.5%).

       

        1. The Contractor’s corporate history and stability. This criterion includes the historical stability, corporate structure, history of litigation or arbitration, and a statement of any liquidated damages that have previously been withheld by public owner clients of the Offeror on projects in the last five (5) years and references. (weighted at 2.5%).
    • Do you agree to the terms and conditions in the attached sample contract? (required)
    • If you have exceptions to the terms in the sample contract, attached a redlined version here.
    • Proposal Documents (required)

      Please Upload your COMPLETE Proposal here, which includes the following:

      1. Bid Summary
      2. Statement of Experience and Qualifications
      3. Non-Collusion Declaration
    • Proposal (without Cost Proposal) (required)

      Please Upload your COMPLETE Proposal here. Upload fee proposal separately in the next step.

    • Separate Cost Proposal (required)

      Confirm that your fee proposal is not attached in your Proposal and is attached separately here.

    • Bid Bond (required)

      Each bid shall be accompanied by a bid bond, in the amount of XXXXXof the total bid price, payable toNew Braunfels Utilities, as a guarantee that the bidder, if its bid is accepted, will promptly execute the Agreement. The bidder shall guarantee the total bid price for a period of 60 days from the date of the bid opening.

      Please scan and upload a copy of your bid bond.

    • Contract Execution, Payment Bond, Performance Bond, and Certificate(s) of Insurance (required)

      The contract shall be executed by the successful bidder and shall be returned, together with the Payment Bond, Performance Bond and Certificate(s) of Insurance to New Braunfels Utilities so that it is received within 14 working daysafter the bidder has received the contract for execution. Failure to do so shall be just cause for forfeiture of the proposal guaranty.

    • Bid Bond (required)

      Will this solicitation require a bid bond?

    • Separate Fee Proposal Upload (required)

      If you are NOT using the Electronic Pricing Table option, will you want your bidder to separate a Price Proposal from the rest of their Response? You'll want to do this if you open your bids initially WITHOUT showing price, and then come back in after a technical evaluation to unseal pricing later.

    Key dates

    1. May 1, 2026Published
    2. June 2, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.