SLED Opportunity · CALIFORNIA · CAL POLY SAN LUIS OBISPO (CSU)

    Task Order Construction Agreement TOCA (TOCA "F") Master Enabling Agreement for Multiple Projects

    Issued by Cal Poly San Luis Obispo (CSU)
    localRFQCal Poly San Luis Obispo (CSU)Sol. 209498
    Closed
    STATUS
    Closed
    due Mar 24, 2026
    PUBLISHED
    Posting date
    JURISDICTION
    Cal Poly
    local
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    Cal Poly San Luis Obispo seeks qualified general contractors for a Master Enabling Agreement to provide design-build and construction management services for multiple projects using task order construction agreements with lump sum or GMP pricing.

    Opportunity details

    Solicitation No.
    209498
    Type / RFx
    RFQ
    Status
    Active
    Level
    local
    Published Date
    Due Date
    March 24, 2026
    NAICS Code
    236220AI guide
    Agency
    Cal Poly San Luis Obispo (CSU)

    Description

    The State of California, acting through the Board of Trustees of the California State University, hereinafter called Trustees, on behalf of California Polytechnic State University, hereinafter called University, is requesting Statements of Qualifications (SOQ) from interested and qualified General Contractors (Respondents) to provide Design-Build and Construction Manager services with Lump Sum Price or GMP pricing for the design and construction of multiple projects under a Master Enabling Agreement (MEA). The delivery method for this contract is Task Order-Construction Agreement for Multiple Projects—Master Enabling Agreement (TO-CA MEA). The TO-CA MEA will include two types of agreements for the multiple projects: a task order for the design and preconstruction phase services for each project, and individual project Construction Agreements for the construction phase. During the design and preconstruction phase and under a Trustees-issued task order, the selected Respondent will collaborate with the Trustees on the design, constructability, cost, and schedule of the Project and develop a Lump Sum Price or GMP proposal to construct the Project. Upon the Trustees’ acceptance of the Lump Sum Price or GMP, the Trustees will issue a Construction Agreement to the General Contractor for the construction phase. If the Trustees and the General Contractor do not agree upon a Lump Sum Price or GMP, the Trustees will not award the construction phase of a Project to the General Contractor. --- QUESTIONS AND ANSWERS --- Q: Good morning, Could you expand on the scope for the type of construction projects this RFQ is requesting for? In particular are there any parking structures included? A: Section 2.2 outlines the types of projects that may be included in this TOCA. However, approximately 20% of the anticipated work remains undefined at this time, as the specific nature and scope of those projects have not yet been determined.

    Key dates

    1. March 24, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.