SLED Opportunity · CALIFORNIA · CALIFORNIA

    TCEP GREEN POWER MICROGRID PROJECT (EV CHARGERS)

    Issued by Port of Oakland
    localRFQCaliforniaSol. 7964540254
    Closed
    STATUS
    Closed
    due Jan 20, 2026
    PUBLISHED
    Dec 3, 2025
    Posting date
    JURISDICTION
    California
    local
    NAICS CODE
    238210
    AI-classified industry

    AI Summary

    Installation of 115 heavy-duty electric vehicle chargers and associated electrical infrastructure across five sites in Alameda County, California. Includes site preparation, security fencing, lighting, and commissioning over a 930-day project period.

    Opportunity details

    Solicitation No.
    7964540254
    Type / RFx
    RFQ
    Status
    Active
    Level
    local
    Published Date
    December 3, 2025
    Due Date
    January 20, 2026
    NAICS Code
    238210AI guide
    Jurisdiction
    California
    Agency
    Port of Oakland

    Description

    The work of this 930 calendar day project consists, in general, of furnishing all labor, materials, appliances, tools, equipment, transportation, services, and supervision required for the installation of electric vehicle (EV) charging infrastructure. The work includes, but is not necessarily limited to, the installation of 115 heavy-duty EV chargers distributed among the five sites, associated electrical equipment, underground conduits, vaults, cabling, switchgear, and transformers. Additional work includes site preparation, grading, pavement restoration, security fencing, lighting, and any necessary testing and commissioning to ensure the successful operation of the EV charging infrastructure. The work of this 930 calendar day project consists, in general, of furnishing all labor, materials, appliances, tools, equipment, transportation, services, and supervision required for the installation of electric vehicle (EV) charging infrastructure. The work includes, but is not necessarily limited to, the installation of 115 heavy-duty EV chargers distributed among the five sites, associated electrical equipment, underground conduits, vaults, cabling, switchgear, and transformers. Additional work includes site preparation, grading, pavement restoration, security fencing, lighting, and any necessary testing and commissioning to ensure the successful operation of the EV charging infrastructure.

    Key dates

    1. December 3, 2025Published
    2. January 20, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.