SLED Opportunity · CALIFORNIA · SFO CONSTRUCTION

    Terminal 3 West Modernization - TP 56 - Pre-Security, Post-Security, and C4C Furniture

    Issued by Sfo Construction
    localRFPSfo ConstructionSol. 233213
    Closed
    STATUS
    Closed
    due Mar 3, 2026
    PUBLISHED
    Jan 30, 2026
    Posting date
    JURISDICTION
    Sfo Construction
    local
    NAICS CODE
    337214
    AI-classified industry

    AI Summary

    Turner Construction seeks firms for furniture procurement, storage, delivery, and installation for the Terminal 3 West Modernization at San Francisco International Airport. The project includes expansion, renovation, and phased construction while maintaining terminal operations. Bid due by March 2, 2026, estimated cost $3.6M.

    Opportunity details

    Solicitation No.
    233213
    Type / RFx
    RFP
    Status
    open
    Level
    local
    Published Date
    January 30, 2026
    Due Date
    March 3, 2026
    NAICS Code
    337214AI guide
    Jurisdiction
    Sfo Construction
    Agency
    Sfo Construction

    Description

    Design-Builder Firm Name: Turner Construction Company

    Project Overview:

    Terminal 3 West Modernization

    The goal of this project is to expand Terminal 3 by approximately 631,022 gross square feet and to renovate approximately 516,644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility.

    Courtyard 4 Connector 

    The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects. 

    Trade Package No.: 56

    Trade Package Title: Pre-Security, Post-Security, and C4C Furniture

    Description of the Trade Package Scope of Work:

    Turner Construction Company is seeking qualified firms to provide furniture procurement, storage, delivery, and installation services for the Terminal 3 West (T3W) project. The work includes furniture to support multiple areas of the project and will require coordination with the project team to meet schedule and phasing requirements.

    Trade Package Bid Due Date and Time: 3/2/2026

    Estimated Cost: $3.6M

    Main Trades of the Trade Package: Furniture Supply and Install

    CMD LBE Participation Requirements %: 0%

    Design-Builder requirements or prequalification criteria: Please reach out to Briana Padilla at brpadilla@ for for SFO and Turner prequalification criteria for this package. 

    Contact for Trade Package information: Briana Padilla email: brpadilla@tcco.com

    Key dates

    1. January 30, 2026Published
    2. March 3, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.