Active SLED Opportunity · MICHIGAN · GLEESON CONSTRUCTORS
AI Summary
Construction of a 3,319 SF Escape Room Experience in Detroit, MI including demolition, concrete, wood framing, doors, finishes, plumbing, HVAC, and electrical work. Open shop, non-prevailing wage project starting Q4 2026. Bids due 08/17/2026 to Gleeson Constructors.
Bidding Instructions: 1. Send all bids to estimating@gleesonconstructors.com. Uploading to buildingconnected.com is NOT necessary or encouraged. Please email your bids to us. 2. Project is Open Shop – Non-Prevailing Wage 3. RFIs are due 08/14/2026 4. Project Start – Q4 2026 Construction of 3,319 SF Escape Room Experience / Retailer SCOPE OF WORK CONSISTS OF: Division 01 General Requirements: Construction Waste Management and Disposal Division 2 Existing Conditions / Site Work: Selective Demolition, MEP demo and make safe Division 3 Concrete: Sawcut and patch for underslab MEPs Division 6 Wood and Plastics: Plywood platforms & blocking, Wood steps, stringers, and handrail Division 8 Doors and Windows: Wood Doors, Wood w/ Glass, HM Frames, Door Hardware, Division 9 Finishes: Metal Framing, Framed Raised Platform Flooring, Gypsum Board, Tape, Float, and Sanding,In-wall FRT wood blocking, Drywall Ceilings, ACT, VCT, Rubber Base, Sealed Concrete, Plexiglass, Ceramic Tile, Painting Division 10 Specialties: Toilet Accessories, Fire Extinguishers, Corner Guards Division 22 Plumbing: Sawcutting, Water Piping, Insulation, Water Heaters, Cleanouts, Floor Drains, Plumbing Fixtures Division 23 HVAC: Exhaust Fans, Curbs, Grilles, Registers, Diffusers, Air Balancing, Division 26 Electrical: Lighting, Fire Alarm – Note A-3 Special Amusement Designation , Relocated Electrical Gear
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.