SLED Opportunity · COLORADO · COLORADO
AI Summary
The City of Thornton seeks proposals for a turnkey solar photovoltaic system installation at its Water Treatment Plant, including rooftop and ground-mounted arrays with a capacity of 460-520 kW DC.
The Project requires the Contractor to design, permit, furnish and install a turnkey solar photovoltaic (PV) system at the Thornton Water Treatment Plant (TWTP) located at 920 Thornton Parkway, Thornton CO, 80229. Thornton intends to include both rooftop and ground-mounted solar arrays to maximize energy production within the available footprint. The total system capacity, based on available space, is anticipated to be between 460 kW and 520 kW (DC). The Project requires the Contractor to design, permit, furnish and install a turnkey solar photovoltaic (PV) system at the Thornton Water Treatment Plant (TWTP) located at 920 Thornton Parkway, Thornton CO, 80229. Thornton intends to include both rooftop and ground-mounted solar arrays to maximize energy production within the available footprint. The total system capacity, based on available space, is anticipated to be between 460 kW and 520 kW (DC).
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.