SLED Opportunity · NEW YORK · NEW YORK
AI Summary
Reale Construction seeks NYS Certified M/WBE and SDVOB subcontractors for sewer system upgrades in Town of Moriah. Work includes pipe installation, manholes, rehabilitation, and site restoration. Proposals due by August 5, 2026; bid date August 6, 2026.
Reale Construction Company is seeking proposals by NYS Certified M/WBE and SDVOB subcontractors, suppliers, services and trucking companies for the Moriah Phase1B Sewer District #1 Collection System Upgrades. This project bids on August 6, 2026. We would appreciate receiving proposals by noon on August 5, 2026. The Project includes the following Work: • Open-cut installation of approximately 1250 linear feet of 8-inch SDR35 PVC, 750 linear feet of 10-inch SDR35 PVC, 1600 linear feet of 12-inch SDR35 PVC, and 150 linear feet of 10-inch C900 PVC gravity sanitary sewer piping. This includes the installation of approximately 20 precast concrete sanitary sewer manholes. • Open-cut installation of approximately 35 linear feet of 18-inch HDPE storm sewer piping. • Replacement of approximately 13 sewer laterals to the property line and connections to existing laterals with new cleanouts. • Abandonment and removal of approximately 3250 linear feet of various gravity sanitary sewer piping and 13 manholes. Abandonment-in-place of approximately 600 linear feet of various gravity sanitary sewer piping. • Rehabilitation of approximately 200 linear feet of elevated piping with cured-in-place lining and exterior pipe coating system along Joyce Road. Installation of approximately 200 linear feet of heat tracing with controls and electrical connections, and pipe insulation. • Associated site work restoration, temporary maintenance of wastewater flows, erosion and sediment control measures, and work zone traffic control. Alternate 1 • Installation of approximately 200 linear feet of 10-inch diameter pre-insulated ductile iron gravity sewer piping, including installation of concrete footings and steel superstructure to support above-grade sewer pipe aerial crossing on Joyce Road. • Removal and disposal of the existing above-grade 10-inch gravity sewer main and existing pipe supports. • Deduction of the 200 LF base bid pipe insulation, cured-in-place lining, and exterior pipe coating system for the existing above-grade sewer main rehabilitation. For more information, questions or copies of the the contract documents please contact Tom Manfred at 518-585-6782 or tommanfred@realeconstruction.com Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 0.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 10.00% WBE Goal: 10.00%
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.