Active SLED Opportunity · ILLINOIS · CITY OF NAPERVILLE, IL

    Transformer Reconditioning and Rebuild

    Issued by City of Naperville, IL
    cityInvitation For BidCity of Naperville, ILSol. 277823
    Open · 22d remaining
    DAYS TO CLOSE
    22
    due Aug 4, 2026
    PUBLISHED
    Jul 9, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    221122
    AI-classified industry

    AI Summary

    City of Naperville seeks bids for inspection, reconditioning, and rebuilding of single and three phase transformers. Services include testing, repair, painting, and oil replacement. Contract term through August 2027 with options. Bids due August 4, 2026.

    Opportunity details

    Solicitation No.
    277823
    Type / RFx
    Invitation For Bid
    Status
    open
    Level
    city
    Published Date
    July 9, 2026
    Due Date
    August 4, 2026
    NAICS Code
    221122AI guide
    Agency
    City of Naperville, IL

    Description

    The City of Naperville is accepting bids from qualified vendors to perform inspection, reconditioning, or rebuilding of single phase, both pole mount and pad mount, transformers and three phase pad mount transformers.

    Project Details

    • Reference ID: 26-158
    • Department: Public Utilities (Electric) | DPU-E
    • Department Head: Brian Groth (Director of Electric Utility)

    Important Dates

    • Questions Due: 2026-07-23T17:00:00.000Z
    • Answers Posted By: 2026-07-24T17:00:00.000Z

    Addenda

    • Addendum #1 (released 2026-07-10T19:15:05.197Z) —

      Please use the See What Changed link to view all the changes made by this addendum.

    Evaluation Criteria

    • Description of Work

      The City of Naperville is accepting bids from qualified vendors to perform inspection, reconditioning, or rebuilding of single phase, both pole mount and pad mount, transformers and three phase pad mount transformers. 

    • General Terms and Conditions and Instructions to Bidders

      THE GENERAL TERMS AND CONDITIONS WHICH FOLLOW APPLY TO ALL PURCHASES AND BECOME A DEFINITE PART OF EACH FORMAL INVITATION TO BID, PURCHASE ORDER, OR CONTRACT ISSUED BY THE CITY OF NAPERVILLE, UNLESS OTHERWISE SPECIFIED. BY SUBMITTING A BID, THE BIDDER AGREES TO BE BOUND BY THESE TERMS AND CONDITIONS. BIDDERS OR THEIR AUTHORIZED REPRESENTATIVES ARE EXPECTED TO FULLY INFORM THEMSELVES OF THE CONDITIONS, REQUIREMENTS, AND SPECIFICATIONS BEFORE SUBMITTING BIDS, FAILURE TO DO SO WILL BE AT THE BIDDER'S OWN RISK AND HE CANNOT SECURE RELIEF ON THE PLEA OF ERROR.

       

       

    • Timeline
      Release Bid Date / Advertised:July 9, 2026
      Question Submission Deadline:July 23, 2026, 12:00pm
      Question Response Deadline:July 24, 2026, 12:00pm
      Bid Opening:August 4, 2026, 2:00pm
    • Project Overview

      The City of Naperville is accepting bids from qualified vendors to perform inspection, reconditioning, or rebuilding of single phase, both pole mount and pad mount, transformers and three phase pad mount transformers.

      Title: Transformer Reconditioning and Rebuild

      Bid No:  26-158

      Bid Due Date/Time: Tuesday, August 4, 2026, 2:00 pm

    • BIDDING PROCEDURES

      The first three items must be performed by the bidder in order for the bid submittal to qualify for consideration by the City.

    • Definitions

      “Contractor” means the company, employees, or agents proposing to provide rehabilitation services to the City of Naperville. “City” shall mean the City of Naperville, its employees, or agents.

    • Pre-Bid Meeting

      A NO VALUE Pre-Bid Meeting will be held on NO VALUE at NO VALUE in [ROOM] at [ADDRESS], Naperville, Illinois. Bidders must send a representative to attend the Pre-Bid meeting in-person. This is your only opportunity to speak directly with staff from the Public Utilities (Electric) | DPU-E regarding the project. A site visit will immediately follow the meeting. Attendees are required to supply their own Personal Protective Gear for any walk-through.

      Site location: [LOCATION AND ADDRESS]

    • Contact Information

      Shanel Gayle, Procurement Officer

      gayles@naperville.il.us

    • Preparation of Bid

      Bidders are responsible for becoming familiar with all conditions, instructions, and contract documents governing this bid and shall inspect the site and conditions pertinent to the work involved. Submission of a bid will be considered specific evidence of having performed the above. Failure to make such an inspection shall not excuse the Contractor from performance of the duties and obligations imposed under the terms of the contract. Once the award has been made, failure to have read all the conditions, instructions, and specifications of this contract shall not be cause to alter the original contract or to request additional compensation.

    • Questions During the Bid Process

      All questions concerning this bid shall be submitted in writing prior to the question due date.  The deadline for questions is Thursday, July 23, 202612:00 pm If required, a written response in the form of an addendum will be issued no later than Friday, July 24, 202612:00 pm.  No contact with the Public Utilities (Electric) | DPU-Eshall be made during the bid process.  Questions asked after the deadline are not guaranteed a response.

    • Bidding Forms

      Bids must be accompanied by an Affidavit of Compliance, provided in this package, and shall be submitted on the forms provided or in an identical format typed by the bidder, properly signed in the appropriate places, and submitted electronically via the City’s e-bidding service.

    • Bid Security Deposit

      When a bid deposit is required as indicated on the Invitation to Bid, each bid must be accompanied by a bid bond signed by a surety company authorized to do business in Illinois. For construction projects the bid deposit shall be in an amount equal to at least 10% of the amount of the bid. Any bid deposit shall be in an amount equal as indicated in the Invitation to Bid.

    • Virtual Bid Opening

      To attend the Virtual Bid Opening on your computer or mobile app: Click here to join the meeting Or call in (audio only) +1 630-733-1095. Phone Conference ID: 646 338 958# approximately 5 minutes prior to the Due Date/Time. Attendees should join approximately 5 minutes prior to the Due Date/Time.

      Due at Bid Opening:

      • Affidavit of Compliance
      • Responsible Bidder Ordinance Form
      • Bid Worksheet
      • Bid Deposit (10% of Total Bid)
      • References
      • Subcontractor Bid Form

      Due Before Award:

      • Certificate of Insurance (with signed endorsements)
      • Performance and Labor and Material bond
      • Substance Abuse Prevention Program

      Due within thirty (30) days of Award:

      • Contractors Safety Checklist (before work begins)

      If you choose not to respond, please select NO BID on https://procurement.opengov.com/portal/naperville.

    • Submission of Bids

      This is an “electronic bid,” meaning that bids must be submitted via the City’s e-bidding service, OpenGov, in electronic format.  All bids submitted must be received electronically via the City’s e-bidding service before the time specified for opening the bid. A link to the City’s e-bidding service is available on the City’s website at https://www.naperville.il.us/government/city-finances/purchasing-and-bids/.

      Downloading documents and submitting bids requires registration with OpenGov.  If you aren’t already a member, you can get a FREE SUBSCRIPTION to the City of Naperville account by going to https://procurement.opengov.com/signup. Any incomplete submittals may be rejected as non-responsive.

      The Procurement Manager, or their designated agent, will decide when the specified time for the bid opening has arrived (as determined by the clock on the e-bidding system), and bids will be opened precisely at the assigned time. Formal sealed bids, amendments thereto, or requests for withdrawal of bids after the time specified for the bid opening will not be considered.

       

    • Disclaimer Document Distribution

      The City of Naperville Procurement Services and its e-Procurement Portal  https://procurement.opengov.com/portal/naperville are the only authorized sources of solicitation documents.  Solicitation documents and forms obtained from any other source may be an incomplete set of documents. Reproduction of these documents without the express permission of the City of Naperville is prohibited.

    • Civic Access Portal for Vendors

      The City of Naperville has developed a new portal for vendors to register and update existing information within Civic Access. The City of Naperville will only accept vendor forms from vendors currently working with the Procurement and/or Accounts Payable teams. It will allow you to:

      • Register as a new vendor.
      • Sign up for ACH payments.
      • Update existing vendor information (e.g. new mailing address, new TIN/W9, new banking information).

      How do I register?

        1. To create an account, please visit the City of Naperville Civic Access portal
        2. Once you have created an account, submit your vendor information Accounts Payable – Vendor Form Submission application. Vendors can find step-by-step instructions in the Knowledge Center. An accounts payable staff member will verify your submission and follow up if there are any questions on your submission. 
        3. Please send an email message to FSDAccountsPayable@naperville.il.us for assistance if needed.
    • Addendum

      Bidders shall acknowledge the receipt of any addendum interpreting the specifications.

    • Samples

      Samples or drawings requested shall be delivered free of charge with the bid. Rejected samples shall be removed by the bidder at his own expense after the bid opening. Accepted samples will be retained during the life of the contract.

    • No Bid Response

      In the event you cannot submit a bid, please submit the no bid section within the City’s e-procurement platform.

    • References

      The Contractor shall be required to provide a minimum of three favorable current commercial customer references for projects similar in nature. The projects must consist of work performed for at least three (3) commercial customer accounts consisting of municipalities, outdoor campuses, sporting venues, hospitals, educational facilities, or similar user spaces. The three references need to be provided on the reference form. The Contractor shall include the names, addresses, contact person(s), phone numbers, email addresses, and type of service provided to each referenced customer.

    • Illinois Prevailing Wage Act

      This contract calls for the construction of a “public work” within the meaning of the Illinois Prevailing Wage Act (820 ILCS 130/1-12 et seq.).  Contractors and subcontractors shall comply with the requirements of the Illinois Prevailing Wage Act including, but not limited to, all wage requirements and notice and recordkeeping duties including paying laborers, workers and mechanics performing work under this contract no less than the currently prevailing rate of wages in the county where the work is performed and filing a copy of the certified payroll with the public body in charge of the project as well as the State; see link below for additional details. 

      The Contractor is advised that the Illinois Department of Labor (IDOL) revises the prevailing wage rates and the Contractor/subcontractor has an obligation to check the IDOL website for revisions to prevailing wage rates. For information regarding the current prevailing wage rates, please refer to the DOL website: https://www2.illinois.gov/idol/laws-rules/conmed/pages/prevailing-wage-rates.aspx. If IDOL revises the prevailing rates of wage during the term of the contract, the Contractor/subcontractor is required to pay the then current prevailing rate of rages.  Any increases in costs to the Contractor due to changes in the prevailing rate of wage during the term of any contract shall be at the expense of the Contractor and not at the expense of the Owner.

      The Contractor shall defend and hold harmless the City, for any claim, suit or action, including costs of defense, expert witness and attorney fees, either at law, equity or in an administrative proceeding, arising from any alleged violation of the Prevailing Wage Act.  The requirements of this Section shall survive the termination of the Agreement formed hereunder.

      Pursuant to PA 100-1177 and in accordance with 820 ILCS 130/5.1, the Illinois Department of Labor (DOL) launched the Certified Transcript of Payroll Portal and contractors are now required to submit all of their certified payroll documentation to the State rather than local government agencies.   Certified Payroll must have the bid number clearly identified.  The link to the DOL portal is below:

      https://www2.illinois.gov/idol/Laws-Rules/CONMED/Pages/certifiedtranscriptofpayroll.aspx

    • Licenses and Permitting

      Where required, the Contractor is responsible for obtaining all necessary licenses, permits, or certifications required to conduct business in the City of Naperville and essential for supporting the bid scope and successful project results. Some licenses may be obtainable through the City Clerk’s Office and shall be provided at the time of bid submittal. The Contractor shall supply copies of all required licenses upon award.

    • Questions

      All questions concerning the bid shall be submitted to the Procurement Services Team. Questions requiring a clarification or interpretation of the specifications shall be submitted to the Procurement Department in writing at least five working days prior to the bid opening so that the Procurement Department can issue a written response to all bidders in the form of an addendum. Whenever the answer to a question is contained in the bid documents, the bidder shall be directed to the provision in the specifications which responds to the question. The City of Naperville, Illinois will not be responsible for any other explanation of the specifications made prior to the receipt of bids.

    • Employment of Illinois Workers on Public Works Act

      Contractor agrees to comply with the Employment of Illinois Workers on Public Works Act (30 ILCS 570/0.01 et seq.) and employ Illinois laborers if, at the time this contract is executed or during the term of this contract, there is excessive unemployment in Illinois as defined in the Act. To review the statute, please click on the link found here.

       

      CURRENT UPDATE IN EFFECT:

      The Employment of Illinois Workers on Public Works Act is  Currently in Effect.

      The Employment of Illinois Workers on Public Works Act requires contractors to use at least 90% Illinois laborers on all public works projects that receive State funds or funds administered by the State during a period of excessive unemployment. 30 ILCS 570/3. A period of excessive unemployment means any month immediately following 2 consecutive calendar months when the Illinois unemployment rate exceeds 5%. 30 ILCS 570/1(2).

      Please be aware that the Act has now come into effect as the unemployment rate in Illinois has exceeded 5% (according to the US Bureau of Labor Statistics) for two consecutive months. The unemployment rates for March (revised) and April were 5.1%.

      Under the Act, an Illinois laborer is anyone who has resided in the state for at least 30 days with the intent to become or remain an IL resident. 30 ILCS 570/1(1).

      For additional information about the Act, please visit IDOL’s website.

    • Personnel

      The Contractor shall employ only competent and skilled personnel. All employees of the Contractor must exhibit an acceptable appearance and shall carry some form of identification when on duty. The City shall have the authority to order the removal from the work of any of the Contractor’s employees who refuse to obey any instructions or who is deemed incompetent, abusive, threatening, or disorderly
      in his conduct. Any such person shall not again be employed on this contract. The Contractor must always have a supervisor on the job whose orders and instructions may be given. Such orders shall have the same force and effect as if given directly to the Contractor.

    • Alternate Proposals

      Unless the proposal form states that an alternate proposal is permissible, each vendor may submit only ONE proposal. If an unsolicited alternate is included in the bid, only the first proposal seen by the City will be read and considered.

    • Subcontractors

      The Contractor shall not be allowed to subcontract the work under this agreement without the written consent of the City of Naperville. If approved, the subcontractor(s) shall be bound by the conditions of the agreement between the City of Naperville and the Contractor and shall perform his/her work in accordance with all terms of this agreement and specifications.

    • Party Interested in More Than One Bid

      A party who has quoted prices for work, materials, or supplies to a bidder is not thereby disqualified from quoting prices to other bidders or from submitting a bid directly for the work, materials, or supplies.

    • Substance Abuse Prevention on Public Works Projects Act

      The successful bidder must be in compliance with State of Illinois HB-1855 (Public Act 095-0635), which amends the Prevailing Wage Act. Before an employer commences work on a public works project, the employer shall have in place a written program which meets or exceeds the program requirements in this Act, to be filed with the public body engaged in the construction of the public works and made available to the general public, for the prevention of substance abuse among its employees. The testing must be performed by a laboratory that is certified for Federal Workplace Drug Testing Programs by the Substance Abuse and Mental Health Service Administration of the U.S. Department of Health and Human Services.

    • Bids Binding for 90 days

      Unless otherwise specified in the specifications, all formal bids submitted shall be binding for ninety (90) calendar days following date of opening.

    • Responsible Bidders Ordinance (RBO)

      Section 1-9B of the Naperville Municipal Code requires that bidders for City of Naperville construction contracts in excess of $34,999.99 must participate in active apprenticeship and training programs approved and registered with the United States Department of Labor’s Bureau of Apprenticeship and Training to be considered a responsible bidder. A bidder must affirm such participation with a signed Responsible Bidder Affidavit submitted with any bid.

    • Freedom of Information Act

      Contractor acknowledges that the Freedom of lnformation Act, 5 ILCS 140/1 et seq. (the "ACT") places an obligation on the City to produce certain records that may be in possession of the Contractor. Contractor shall comply with the retention and documentation requirements of the Local Records Retention Act 50 ILCS 205/1 et seq. and the Act and shall maintain all records relating to this Agreement in compliance with the Local Records Retention Act (complying in all respects as if the Contractor was, in fact, the City). Upon notice from the City, Contractor shall review its records promptly and produce to the City within two business days of said notice from the City the required documents which are responsive to a request under the Act. If additional time is necessary to comply with the request, the Contractor may request the City to extend the time to do so, and the City will, if time and a basis for extension under the Act permits, consider such extensions. In the event Contractor fails to produce the requested records or fails to produce the requested records within the time period required above and the City is assessed a fine, fee or penalty for failure to timely comply with Act do to Contractor’s actions, Contractor shall reimburse City for all fines, fee or penalties, including reasonable attorney’s fees, paid by the City.

    • Withdrawal of Bids

      A written request for the withdrawal of a bid will be granted if the request is received by the City prior to the specified time of opening.

    • Contractor Safety Orientation Checklist

      Prior to the start of any work, the Contractor and the Jobsite Manager/Supervisor will be required to complete the City’s Contractor Safety Orientation Checklist at a pre-construction meeting. No work can begin until the completed form has been received and signed by the Jobsite Manager/Supervisor. A sample of the Contractor Safety Orientation Checklist is included as part of the bid document.

    • Bidders Invited to Bid Opening

      At the time assigned for the opening of formal bids, the bids will be opened and read aloud. Bidders are encouraged to attend all openings and to offer constructive suggestions for improvements to the bid format or any way in which greater savings can be realized in future bidding opportunities.

    • AWARDING THE BID

      The following is the process of awarding the bid.

    • Basis of Award (Unit Price)

      The City of Naperville intends to award a contract to the responsible bidder submitting the lowest responsive bid. Lowest price shall be determined by the Total Bid amount listed on the Bid Worksheet resulting from multiplying the actual number of acceptable units by the unit price items incorporated into the work or service, all as set forth in bid worksheet. In addition, if requested within bid documents, the City may elect to include, within the Total Bid, any combination of additive, alternate, or optional Bid items for which the City determines funds will be available at the time of award. The City will review and make adjustments associated with arithmetic errors to ascertain whether the order of bids is correct.  In the event of arithmetic errors in any of the line items, the unit price will be the controlling factor to correct the arithmetic error.  The City will not assume that the error exists in the unit price.

      Bids submitted are offers only and the decision to accept or reject is a function of quality, reliability, capability, reputation, and expertise of the bidders. The City reserves the right to reject any and all bids or to waive any non-conformity in bids received whenever such rejection or waiver is in the best interests of the City.  The City also reserves the right to reject the bid of a bidder who has previously failed to satisfactorily perform a contract, has not completed contracts on time, or whom investigation shows is not in a position to perform the contract.  The City of Naperville reserves the right to award individual bids to more than one vendor if it is deemed to be in the best interest of the City. The City reserves the right to increase or decrease the contract quantity without penalty from the contractor to the City.

    • Criteria for Awarding Bid/Reservation of Rights

      The contract will be awarded to the lowest responsible bidder, or any other bidder determined by the City Council to be in the best interest of the City, who complies with all the provisions of the invitation to bid. The City reserves the right to reject any or all bids or to waive any non-conformity in bids received whenever such rejection or waiver is in the best interests of the City. The City also reserves the right to reject the bid of a bidder who has previously failed to satisfactorily perform a contract, has not completed contracts on time, or who investigation shows is not in a position to perform the contract.

      In determining responsibility, the following qualifications will be considered by the City:

      (a) The ability, capacity, and skill of the bidder to perform the contract or provide the service required;

      (b) Whether the bidder can perform the contract or provide service promptly, or within the time specified, without delay or interference;

      (c) The character, integrity, reputation, judgment, experience, and efficiency of the bidder;

      (d) The quality of performance of previous contracts or services;

      (e) The previous and existing compliance by the bidder with laws and ordinances relating to the contract or service;

      (f) The sufficiency of the financial resources and ability of the bidder to perform the contract or provide the service;

      (g) The quality, availability, and adaptability of the supplies or contractual services to the particular use required;

      (h) The ability of the bidder to provide future maintenance and service for the use of the subject of the contract;

      (i) Bidder's record of experience in construction improvements of the size and type required in the bid specifications;

      (j) Lowest bids received including discounts for cash payments.

    • Notice of Award

      The City will accept in writing one of the proposals, within ninety (90) days from the date of opening of bids, or the time specified within the specifications, unless the lowest responsible bidder extends the time of acceptance to the City. Notice of Award will be posted on OpenGov, our e-bidding site, for all bidders within the time for acceptance specified in the Invitation to Bid.

    • Award of all or Part

      Unless otherwise specified by the City, the City reserves the right to make an award on all items, or on any of the items according to the best interests of the City. Bidder may restrict his bid to consideration in the aggregate by so stating but must name a unit price on each item bid upon. The City reserves the right to accept or reject any bid in which the bidder names a total price for all the articles without quoting a price on each and every item.

    • Specification
      INTENT OF SPECIFICATIONS

      The bid will establish service rates and material rates/material markup percentage/material discount percentage that are all inclusive (i.e. no additional fuel surcharges, shipping fees, etc.).

      The estimated quantities of units provided on the bid form are for evaluation purposes only. The City will compensate the Vendor on a basis of the actual units repaired, rebuilt, or retired. The actual units of compensation will be billed by the Vendor and verified by the City of Naperville. Total quantities shall be determined by the City of Naperville Department of Electric Utility based upon actual need.

      The Vendor shall provide on the Bid Form a unit price for recondition, rebuild and scrap for each different size and type transformer. This is an as needed contract. Quantities are estimated. The City reserves the right to increase and decrease quantities and will pay for only work performed at the unit price bid. Estimated quantities listed on the bid form shall be used for evaluation of bid but are not a promise for quantity of work. Vendor does not need to provide a cost for every category on the Bid Worksheet, but must provide lead times for any category a cost is provided for. The City reserves the right to change the scope of duties, adjust service levels, hire other additional Vendors do the work with City staff or take other measures consistent with City policies, procedures, and/or act in capacities in the best interest of the City

      DEFINITIONS

      “Vendor” means the company, employees, or agents proposing to provide winter operation services to the City of Naperville. “City” shall mean the City of Naperville, the Naperville Electric Utility (Utility), its employees, or other authorized City personnel.

      CONTRACT TERM

      This initial term contract shall cover the period from date of award through August 31, 2027 with consideration for two additional one-year options. However, it must be clearly understood that the City Council approves funding and budgets for a one (1) year period, beginning on January 1, and that the initial contract places NO obligation on the City to appropriate funding beyond the initial first year. Any contract extensions are contingent upon available funding, service arrangement, cost factors, and the Vendor 's performance under the contract. The City may elect to seek additional services from other Vendors or terminate this contract with a thirty-day written notice.

      QUALIFICATIONS OF VENDORS

      The Vendor shall be required to show to the Utility that  reserves the right to reject any proposal if the evidence submitted by, or investigation of, the Vendor fails to satisfy to the City employees that the Vendor is properly qualified to carry out the obligations of the contract and to complete the work described herein.

      REFERENCES

      The Vendor shall be required to provide a minimum of three favorable current commercial customer references for work similar in size and scope to the work outlined in the specifications. The Vendor shall include the names, addresses, contact person(s), phone numbers, email addresses, type of service provided and current length in time serving each referenced customer. List references for any municipal work that your firm has done.

      SCOPE OF SERVICES

      The Vendor shall perform the functions described in these specifications in accordance with the generally accepted engineering, manufacturing and operating practices observed in the electric utility industry.

      The Bid worksheet shows the type of units the City will be sending for analysis and possible repair. This will provide the Vendor with an idea of the equipment they are likely to see. Please provide estimated pricing and lead times for each individual size.

      TO RESPOND

      Failure to respond and/or perform the services detailed in these specifications will impose a hardship on those who use these facilities. Accordingly, if the Vendor does not respond or perform the services in accordance with the requirements contained in these specifications, or the work is not acceptable to the Utility, the Utility will not pay the Vendor for the work or will deduct the value of the work that had to be performed by the Utility to correct the work, from the Vendor’s payment.

      SUBCONTRACTORS

      The Vendor shall not be allowed to subcontract the services under this agreement without the written consent of the Utility. If approved, the subcontractor(s) shall be bound by the conditions of the agreement between the Utility and the Vendor and shall perform his/her work in accordance with all terms of this agreement and specifications.

      DELIVERY NOTIFICATION AND REQUIREMENTS

      Pick up and deliveries are to be made to the following location:

      City of Naperville Electric Service Center 1392 Aurora Avenue

      Naperville, IL 60540

      The Vendor shall inform The City 48 hours before time of delivery with serial numbers of transformers being delivered. Contact. Mark Edmondson, EdmondsonM@naperville.il.us.

      The City shall assist loading/unloading the transformers at the Electric Service Center on/off the Vendor flatbed trailer. The Vendor is responsible for directing the loading and securing the load of transformers on the truck.

      The City understands that it is not cost efficient for the Vendor to make a trip to Naperville for a single transformer. Vendor shall clearly define the limitations or required quantities to qualify for the shipping to be included within the unit costs.

      The Vendor shall also define if there are weight limitations with respect to larger kVA units.

      Freight from Naperville to the vendor’s facility and then back to Naperville shall be included in the unit costs, unless exceptions with specific terms are listed by the Vendor on the bid response.

      The City shall conduct a basic PCB test to verify less than 50ppm PCB prior to initiating shipment to the Vendor.

      PAYMENT TERMS

      The City will issue a Purchase Order for services.

      The quantities of units provided on the bid form are for evaluation purposes only. The City will compensate the Vendor on a basis of the actual units repaired, rebuilt, or retired. The actual units of compensation will be billed by the Vendor and verified by the City of Naperville.

      The Vendor shall prepare and submit to the City a detailed invoice. Invoices shall be submitted directly to Naperville Electric Utility to expedite the payment process. The Electric Utility will not process incorrect invoices for payment. In the event of an incorrect invoice, Mark Edmonson will inform the vendor of the billing error and the vendor must remit one correct invoice for payment to Electric Utility.

      DETAILED SPECIFICATIONS

      GENERAL

      These specifications are intended to describe the inspection, reconditioning, or rebuilding of single phase, both pole mount and pad mount, transformers and three phase pad mount transformers for the City of Naperville (City). The services shall determine which transformers will be repaired or salvaged. The Vendor shall perform the functions described in these specifications in accordance with the generally accepted engineering, manufacturing and operating practices observed in the electric utility industry. These transformers shall meet all requirements of the latest applicable American National Standard Institute (ANSI), American Society of Testing and Materials (ASTM), Institute of Electrical and Electronic Engineers (IEEE), and the National Electrical Manufacturers Association (NEMA) standards. These transformers shall be single or three phase, 60 hertz, oil filled, self-cooled, distribution transformers, the transformer oil must not contain PCBs.

      Performance

      • The units shall be tested and an initial assessment provided to the City by the vendor within 30 days of arrival at the repair facility.
      • Units for Recondition shall be completed and returned within 120 days
      • Units for Rebuild shall be completed and returned within 180 days

       

      INSPECTION shall include:

      1. INSPECTION

      The Vendor shall inspect each transformer and assess the physical condition of the transformer. The visual signs of rust, leaks, tank deformation, and internal damage, (e.g., core, winding, etc.,) should be included in the report to the City. The Vendor shall perform the tests listed below to determine the electrical condition of the transformer. This information shall be included in the report to the City. The Vendor shall make a recommendation to recondition, rebuild or retire each transformer. The report shall include the transformer’s nameplate information (i.e. serial number, kVA) and the recommendation of repair work. Each report should include a cost estimate that shows the INSPECTION cost, RECONDITION or REBUILD cost, Oil cost, or SALVAGE price. Where T&M work for sheet metal is proposed, such cost must be included with the recommendation report.

      Since every unit will have an inspection, the freight charges for pickup and delivery should be included in the INSPECTION unit cost. Assume all transformers will be returned to the City.

      The Vendor’s report shall be e-mailed to Mark Edmondson, EdmondsonM@naperville.il.us , for final approval prior to the work being performed on the units.

      Required test are:

        1. TTR
        2. Megger

      RECONDITION shall include:

      1. RECONDITION

      The repairs of transformers shall be consistent with industry standards and shall include, but not limited to, the following and shall be bid as one unit:

      1. Overhead Transformers:
        1. Replace all gaskets.
        2. Replace all primary and secondary bushings.
        3. Tank to be sanded and painted, per Section V below, ANSI light gray No. 70 and re- stenciled per original
        4. Bake the core and coil according to industry standards.
        5. Refill with new non-PCB transformer oil.
        6. Install a new Internal Fault Detector (IFD) device.
        7. Perform all required testing and provide test report.
        8. The warranty shall apply for one (1) year. However, the effective period of warranty shall commence when the City installs the transformer, but the period from the time of receipt by the City to the commencement of the warranty shall not exceed six (6) months.

      The RECONDITION unit cost provided shall include the cost of all miscellaneous material and parts. Oil shall be bid as a price per gallon and will become an individual adder to each repaired unit.

      1. Pad Mounted Transformers Single and Three Phase:
      2. Replace all gaskets.
      3. Replace all damaged gauges and valves.
      4. Replace primary and secondary bushings; 15kV primary bushing inserts must be compatible with either RTE or Elastimold load break elbow terminators. Note, where the X2 secondary bushing is solidly welded to the tank, the bushing shall be converted to a current standard insulated bushing.
      5. Tank to be sanded and painted, per Section V below. The finish shall be olive green, Munsell 7GY3.29/1.5.
      6. Bake the core and coil according to industry standards.
      7. Refill with new non-PCB transformer oil.
      8. Replace bay-o-net fuses, fuse holders, drip pans, and the penta-head bolt mechanism.
      9.  Perform all required testing and provide test report.

      ix. The warranty shall apply for one (1) year. However, the effective period of warranty shall commence when the City installs the transformer, but the period from the time of receipt by the City to the commencement of the warranty shall not exceed six (6) months.

      The RECONDITION unit cost provided shall include the cost of all miscellaneous material and parts. Oil shall be bid as a price per gallon and will become an individual adder to each repaired unit.

      Where bushing replacement creates sheet metal work, such sheet metal work cost will be quoted on the original inspection report.

      REBUILD shall include:

      1. REBUILD

      A unit requiring the REBUILD unit shall NOT also require payment for the RECONDITION unit cost. Transformers that will be repaired will get either the RECONDITION or REBUILD unit cost, but not both. The repairs of transformers shall be consistent with industry standards and shall include, but not limited to, the following and shall be bid as one unit:

      1. Overhead Transformers
        1. Replace all gaskets.
        2. Replace primary and secondary bushings.
        3. Tank to be sanded and painted per Section V below, ANSI light gray No. 70 and re-stenciled per original.
        4. Rewind high side windings with copper conductor.
        5. Rewind low side windings with copper or aluminum conductor.
        6. Bake the core and coil according to industry standards.
        7. Refill with new non-PCB transformer oil.
        8. Transformer to be wound to plus or minus 10% of DOE standards.
        9. The impedance shall not exceed more than 2.7%.
        10. Installation of a new pressure relief device and IFD.
        11. Preform all required testing and provide test report.
        12. The manufacturer’s warranty shall apply for three (3) years. However, the effective period of warranty shall commence when the City installs the transformer, but the period from the time of receipt by the City to the commencement of the warranty shall not exceed six (6) months.

      The REBUILD unit cost provided shall include the cost of all miscellaneous material and parts. Oil shall be bid as a price per gallon and will become an individual adder to each repaired unit.

      1. Pad Mounted Transformers Single and Three Phase:
      1. Replace all gaskets
      2. Replace all damaged gauges and valves.
      3. Replace primary and secondary bushings; 15kV primary bushing inserts must be compatible with either RTE or Elastimold load break elbow terminators. Note, where the X2 secondary bushing is solidly welded to the tank, the bushing shall be converted to a current standard insulated bushing.
      4. Tank to be sanded and painted, per Section V below, The finish shall be olive green, Munsell 7GY3.29/1.5.
      5. Rewind high side winds with copper conductor.
      6. Rewind low side windings with copper or aluminum conductor.
      7. Bake the core and coil according to industry standards.
      8. Refill with new non-PCB transformer oil.
      9. Replace bay-o-net fuses, fuse holders, drip pans, and the penta-head bolt mechanism.
      10. Transformer to be wound to plus or minus 10% of DOE standards.
      11. The impedance shall not exceed more than 2.7% for single phase pad. Impedance for three phase pads below 750kVA should be within 10% of the original, and 750kva to 2000kva three phase pad shall be 5.75% (± 10).
      12. If the three phase or single-phase unit tank, doors, or sill is damaged beyond repair, replacements can be used. There will be a separate price for the single phase and three phase tanks. T&M rates shall be provided in the response to this bid. Cost estimate for sheet metal and tank repairs will need to be provided at the time of Inspection to the City.
      13. Preform all required testing and provide test report.
      14. The manufacturer’s warranty shall apply for one (1) year. However, the effective period of warranty shall commence when the City installs the transformer, but the period from the time of receipt by the City to the commencement of the warranty shall not exceed six (6) months.

      The REBUILD unit cost provided shall include the cost of all miscellaneous material and parts. Oil shall be bid as a price per gallon and will become an individual adder to each repaired unit.

      Where bushing replacement or rewinding creates sheet metal work, such sheet metal work cost will be quoted on the original inspection report.

      1. TESTING

      The following tests are to be performed on all transformers if reconditioned or rebuilt. The results shall be e-mailed to Mark Edmondson, EdmondsonM@naperville.il.us, on or before the shipping date of said units back to the City.

        1. TTR
        2. Megger
        3. Exciting Current
        4. Hi-Pot
        5. Full Load Watts
        6. No Load Watts
        7. Induced Potential (180 Cycles at 2X Voltage)
      1. PAINTING

      Overhead Transformers: All transformers shall be thoroughly cleaned and painted with a rust resistant primary coat and a finishing topcoat. The tank exterior shall be ANSI light gray, No. 70 in color with a minimum coating of 3 mils. The interior shall have at least a 1-mil primer coating from the top of the tank to at least the low oil level. The latest ANSI specifications for transformer painting must be followed. The KVA and voltage shall be painted in three (3) inch letters on the front of the transformer.

      Pad Mount Transformers: All transformers shall be painted olive green, Munsell 7GY3.29/1.5in strict accordance with the latest Edison Electric Institute (EEI) guidelines for pad-mounted equipment. The Vendor shall submit certification that these specifications have been met. Identification markings inside the transformer shall be stenciled consistent with original manufacturer labelling.

      1. OIL REQUIRMENTS

      The oil shall be bid at a price per gallon. Oil shall be new, not reprocessed. There will also be a set mark up on the price per gallon to cover any increase in cost during the term of the contract. For example, if the price per gallon is $6.00 per gallon and the vendor has a + .12 per gallon mark up, then the total price will be $6.12 per gallon. The oil used should meet ANSI/ASTM D3487 Standard and not have any PCB’s content in it. It should be able to pass the ANSI D 877 dielectric test.

      1. Fusing TABLE 1

      Single Phase Transformer Bay O Net Fusing Chart

      Transformer Size             13.2 Fuse

      (kVA)

      Catalog Number

      Manufacturer

      25

      4038108C04B

      RTE

      50

      4038108C07B

      RTE

      75

      4038108C09B

      RTE

      100

      4038108C09B

      RTE

      167

      4038108C12B

      RTE

       

      TABLE 2

      Three Phase Transformer Bay-O-Net Fusing Chart

      Transformer Size   13.2 Fuse

      (kVA)

      Catalog Number

      Manufacturer

      75

      4038108C04B

      RTE

      150

      4038108C07B

      RTE

      225

      4038108C09B

      RTE

      300

      4038108C09B

      RTE

      500

      4038108C12B

      RTE

      750

      4038361C03CB

      RTE

      1000

      4038361C04CB

      RTE

      1500

      4038361C04CB

      RTE

      2000

      4038361C05CB

      RTE

       

      1. PURCHASE OF SCRAP TRANSFOMERS

      All Transformers that are unable to be reconditioned or rebuilt, or that the City decides not to repair or rebuild, at the discretion of the City, may be retired for scrap, and be purchased from the City by the Vendor. The price shall be based on cost per unit listed on the Bid Form. The City may instead choose to have such units returned or accept a suitable replacement unit. Since freight to and from the City is included in the INSPECTION unit cost as per section 4C above, return of any unit to the City after inspection, shall not incur additional freight charges, unless such were specifically called out with an exception in the bid response.

    • Veterans Preference Act

      In the event of a tie, the City will give preference according to the Veterans Preference Act; Illinois Revised Statutes, Chapter 126-1/2, Section 23, Effective July 1, 1935 as amended September 6, 1990; In the employment and appointment to fill positions in the construction, addition to, or alteration of all public works undertaken or contracted for by the State, or by any political subdivision there, preference shall be given to persons who have been members of the armed forces of the United States or who, while citizens of the United States, were members of the armed forces of allies of the United States in time of hostilities with a foreign country, and have served under one or more of the following conditions:

      (1) The veteran served a total of at least six months, or

      (2) The veteran served for the duration of hostilities regardless of the length of engagement, or

      (3) The veteran served in the theater of operations but was discharged on the basis of hardship, or

      (4) The veteran was released from active duty because of a service connected disability and was honorably discharged. But such preference shall be given only to those persons who are found to possess the business capacity necessary for the proper discharge of the duties of such employment. No political subdivision or person contracting for such public works is required to give preference to veterans, not residents of such districts, over residents thereof who are not veterans.

    • Execution of a Performance Bond and Payment (Labor and Materials) Bond

      When noted in the specifications, the City reserves the right to require the successful bidder to supply a Performance Bond and a Labor and Materials Bond within ten (10) calendar days of acceptance of the bidder's proposal by the City. The bonds, unless otherwise specified by the Procurement Manager, shall be 100% of the total contract price.

    • Failure to Furnish the Bond

      In the event that the bidder fails to furnish the above mentioned bonds within ten (10) calendar days after acceptance of bid by the City, then the bid deposit of the bidder shall be retained by the City as liquidated damages, it being now agreed that said sum is a fair estimate of the amount of damages that said City will sustain due to the bidder's failure to furnish said bonds.

    • SPECIFICATIONS

      The following are City specifications.

    • Formal Specifications

      When a formal, numbered specification is referred to in this invitation, no deviation from that specification will be permitted.

    • Trade Name Used by City

      Any reference in the City's specifications to a manufacturer's catalog number is descriptive, not restrictive, indicating articles that are satisfactory. Bids on other makes and catalogs will be considered, provided the bidder clearly states on the face of his proposal exactly what he proposes to furnish; or forwards with his bid, a cut, illustration, or other descriptive matter which will clearly indicate the character of the article covered by his bid.

    • Trade Name Used by Bidder

      Where the bidder identifies an item by manufacturer's name, trade name, catalog number, or reference, the bidder shall furnish the item so identified and shall not propose to furnish an "equal" unless the proposed "equal" is definitely indicated within the bid.

    • Proposed Equivalents

      The Procurement Manager hereby reserves the right to approve as an equal, or to reject as not being equal, any article the bidder proposed to furnish which contains major or minor variations from specifications requirements, but which may comply substantially therewith.

      If no particular brand, model, or make is specified, and if no data are required to be submitted with the bid, the specifications may require the bidder to submit working drawings or detailed descriptive data sufficient for the City to determine if each requirement of the specifications is being complied with prior to manufacture or shipment.

    • PRICE

      The following are City price specifications.

    • Net Prices

      Bid prices, unless otherwise specified in the specifications, must be net, including transportation and handling charges fully prepaid by the contractor to delivery point. All prices are subject to Net 30 on commodities, rentals and services unless otherwise specified. Term #24 does not include construction contracts.

      Prices must be a firm monetary figure for the cost of the commodity, service, or project. In the event the City invites bids for the purchase of any item or real property, the City shall not accept a bid which is based upon any other bid, contract, or reference to any other document or numbers not included in the bidder’s bid documents.

    • Tax Exemption

      Sales to the City of Naperville are exempt from state and local retailers' occupation tax, state and local service occupational tax, use tax, and service use tax pursuant to Rule No. 40 of the Illinois Retailers Occupation Tax Rules issued April 15, 1965. Our tax exemption number is E9997-4398-07.

    • Errors in Bid Prices

      When an error is made in extending total prices, the unit bid price will govern.

    • QUANTITIES

      The following are City quantity specifications.

    • Specific Bid Quantities

      Where quantities are specifically stated, acceptance will bind the City to order and pay for, at contract prices, all such supplies or services delivered that meet the specifications and conditions of the contract.

    • DELIVERY PROVISIONS

      The following are City delivery provisions.

    • Placing of Order

      Orders against contracts will be placed with the Contractor on a Purchase Order executed and released by the Procurement Manager. Telephonic orders placed directly with the Contractor by the ordering department may be authorized by the Procurement Manager only after execution of an Open End or Blanket Purchase Order.

    • Responsibility for Materials Shipped

      The successful bidder shall be responsible for the materials or supplies covered by this contract until they are delivered at the designated point. Rejected materials or supplies must be removed by and at the expense of the contractor promptly after notification or rejection.

    • Delivery Failures

      Failures of a Contractor to deliver within the time specified, or within a reasonable time as interpreted by the Procurement Manager, or failure to make replacement of rejected articles when so requested, immediately or as directed by the Procurement Manager, shall constitute authority for the Procurement Manager to purchase in the open market articles of comparable grade to replace the articles rejected or not delivered. On all such purchases, either: (1) the Contractor shall reimburse the City, within a reasonable time specified by the Procurement Manager, for any expense incurred in excess of contract prices; or (2) the City may deduct such amount from monies owed the defaulting Contractor. Such purchases shall be deducted from contract quantities. Should public necessity demand it, the City reserves the right to use or consume articles delivered which are substandard in quality, subject to an adjustment in price to be determined by the Procurement Manager.

    • Packaging and Containers

      Unless otherwise specified, goods shall be delivered in commercial packages in standard commercial containers, so constructed as to insure acceptance by common or other carrier for safe transportation, at the lowest rate, to the point of delivery. Containers become the property of the City unless otherwise specified by bidder in his bid.

    • Inspection of Goods

      Inspections and acceptance of materials or supplies will be made after delivery. Final inspection shall be conclusive except as regards latent defects, fraud, or such gross mistakes as to amount to fraud. Final inspection and acceptance or rejection of the materials or supplies will be made as promptly as practicable. All delivered materials shall be accepted subject to inspection and physical count.

    • Packing Slips or Delivery Tickets

      All shipments or deliveries shall be accompanied by packing slips or delivery tickets and shall contain the following information for each item delivered:

      Purchase Order Number

      Quantity Ordered

      Name of the Article

      Stock Number

      Quantity Shipped

      Name of the Contractor

      Quantity Back Ordered

    • Payment Terms

      The City of Naperville’s payment terms are net 30. The payment date will be calculated based on the invoice receipt date or delivery date, whichever is later. All payments shall be made with electronic payment transfer.

      Payment:

      All invoices shall be addressed to Accounts Payable, City of Naperville, P.O. Box 3020, Naperville, Illinois, 60566-7020, as indicated on the front of this purchase order and must include vendor’s name and phone number, and clearly list quantities, item descriptions and units of measure.

    • FINANCIAL RESPONSIBILITY PROVISIONS

      The following are the City financial responsibility provisions.

    • General Guaranty

      Contractor agrees to:

      (a) Save the City, its agents, and employees harmless from liability of any nature or kind for the use of any copyrighted or uncopyrighted composition, secret process, patented or unpatented invention, article, or appliance furnished or used in the performance of the contract which the Contractor is not the patentee, assignee, licensee, or owner; and

      (b) Protect the City against latent defects in materials or workmanship and to repair or replace any articles damaged or marred in transit or during delivery; and

      (c) Pay for all permits, licenses, and fees and give all notices and to comply with all laws, ordinances, and rules of the City and the State of Illinois.

    • Warranties

      Unless otherwise specified, the Contractor shall unconditionally guarantee the materials and workmanship on all equipment furnished by him FOR A PERIOD OF ONE YEAR from date of delivery and installation if required unless otherwise specified in the specifications. If within the guarantee period, any defects or signs of deterioration are noted which, in the opinion of the City, are due to faulty design and installation, workmanship, or materials, the City shall notify the Contractor. At the Contractor's expense, the Contractor shall repair or adjust the equipment or parts to correct the condition or replace the part or entire unit to the complete satisfaction of the City.

    • Insurance

      At the Contractor's expense, the Contractor shall procure and maintain in effect throughout the duration of this contract, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees or subcontractors.

      The Contractor must furnish Certificates of Insurance to the City before staff recommends award of the contract to City Council. If requested, the awardee of this bid will give the City a copy of the insurance policies. The policies must be delivered to the City within two weeks of the request. All insurance policies shall be written with insurance companies licensed to do business in the State of Illinois and having a rating of not less than A: VII according to the A.M. Best Company. Should any of the insurance policies be canceled before the expiration date, the issuing company will mail 30 days written notice to the City. The Contractor shall require and verify that all subcontractors maintain insurance meeting all of the requirements stated herein.

      Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials, employees and volunteers; or the Contractor shall provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigations, claim administration and defense expenses.

      The limits of liability for the insurance required shall provide coverage for not less than the following amounts, or greater where required by law. If the Contractor maintains higher limits than the minimums shown below, the City shall be entitled to coverage for higher limits maintained by the contractor.

      (A) Commercial General Liability:

      Coverage shall be at least as broad as Insurance Services Office Commercial General Liability coverage (Occurrence Form CG 00 01) and include Premise/Operations, Products/Completed Operations, Independent Contractors, Contractual and Personal Injury/Advertising Injury.

      Limits:

      General Aggregate $2,000,000.00

      Products/Completed Operations $2,000,000.00

      Each Occurrence $2,000,000.00

      Personal Injury $2,000,000.00    

      (B) Automobile Liability:

      Coverage shall be at least as broad as Insurance Services Office Form CA 00 01 to include all Owned, Hired, Non-owned vehicles.

      Limits:

      Combined Single Limit Per Accident $2,000,000

      (C) Workers’ Compensation:

      Coverage shall be as required by the State of Illinois, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.

      (D) Employers’ Liability

      Limits:

      Each Accident $1,000,000

      Each Employee Bodily Injury by Disease $1,000,000

      Policy Limit Bodily Injury by Disease $1,000,000

      (E) Other Insurance Provisions

      The Commercial General Liability and Automobile Liability policies are to contain, or be endorsed to contain, the following provisions:

      1. The City, its officers, officials, employees and volunteers are to be covered as insured’s with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the Contractor; and with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts or equipment furnished in connection with such work or operations. General Liability coverage shall be provided in the form of an Additional Insured endorsement to the Contractor’s insurance policy, or as a separate owner’s policy.

      2. For any claims related to this project, the Contactor’s insurance coverage shall be primary insurance as respects the City, its officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it.

      The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by the Contractor, its employees, agents and subcontractors.

      The Contractor understands that the acceptance of Certificates of Insurance, policies and any other documents by the City in no way releases the contractor from the requirements set forth herein.

    • Damages/Indemnification

      The Contractor shall defend, indemnify, and hold harmless the City and its officers, agents and employees, from any and all liability, losses or damages as a result of claims, demands, suits, actions, or proceedings of any kind of nature,, including but not limited to costs and fees, including reasonable attorney’s fees, resulting from any negligent or willful act or omission on the part of the Contractor or Contractor’s subcontractors, subconsultants, or sub-vendors, or their respective employees, agents and representatives, during the performance of this Agreement, including without limitation, failure to comply with all applicable federal, state, and local laws, rules, ordinances, regulations, orders, federal circulars and all license and permit requirements. Such defense, indemnification, and hold harmless provisions shall not be limited by reason of any insurance coverage provided for herein. Nothing contained herein shall be construed as prohibiting the City, or its officers, agents, or employees, from defending through the selection and use of their own agents, attorneys, and experts, any claims, actions or suits brought against them in which case the Contractor shall be liable for the reasonable cost, fees, and expenses incurred in the defense of any such claims, actions, or suits. Nothing herein shall be construed as a limitation or waiver of defenses available to the City and employees and agents, including but not limited to the Illinois Local Government and Governmental Employees Tort Immunity Act, 745 ILCS 10/1-102 et seq. The provisions of this paragraph shall survive completion, expiration or termination of this Agreement.

    • Cercla Indemnification

      The Contractor shall, to the maximum extent permitted by law, indemnify, defend, and hold harmless the City, its officers, employees, agents, and attorneys from and against any and all liability, including without limitation, costs of response, removal, remediation, investigation, property damage, personal injury, damage to natural resources, health assessments, health settlements, attorneys' fees, and other related transaction costs arising under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, 42 U.S.C.A. Sec. 9601, et seq., as amended, and all other applicable statutes, regulations, ordinances, and under common law for any release or threatened release of the waste material collected by the Contractor, both before and after its disposal.

    • Assignment

      Assignment of this contract or any part thereof, or any funds to be received there under by the Contractor shall be subject to the approval of the City of Naperville.

    • Termination of Contracts

      Contracts will remain in force for full periods and until all articles ordered before date of termination shall have been satisfactorily delivered and accepted and thereafter until all requirements and conditions shall have been met, unless:

      1. Terminated prior to expiration date by satisfactory deliveries of entire contract requirements.
      2.  Extended upon written authorization of the Procurement Manager and accepted by Contractor, to permit ordering of unordered balances or additional quantities at contract prices and in accordance with contract terms.
    • Default

      The contract may be canceled or annulled by the City Council in whole or in part by written notice of default to the Contractor upon non-performance or violation of contract terms. Upon receipt of such notice, the Contractor shall have fourteen (14) days with in which to cure any default or violation. If the default or violation is not cured with in the specified time an award may be made to the next lowest Bidder, or articles specified may be purchased on the open market. In either event, the defaulting Contractor (or his surety) shall be liable to the City for costs incurred by the City in excess of the defaulted contract prices. However, the Contractor shall continue the performance of this contract to the extent not terminated under the provisions of this clause.

    • Material Safety Data Sheets

      It is a federal law that chemical manufacturers and importers must develop an MSDS for each hazardous chemical they produce or import and must provide the MSDS automatically at the time of the initial shipment of a hazardous chemical to a downstream distributor or user, or anytime the chemical makeup of the product is changed. Distributors must also ensure that downstream employers are similarly provided an MSDS.

      Vendors who are awarded this contract, and if the above paragraph applies to this bid, must submit Material Data Sheets which include information regarding the specific chemical identity of the hazardous chemical(s) involved and the common names. In addition, information must be provided on the physical and chemical characteristics of the hazardous chemical; known acute and chronic health effects and related health information; exposure limits; whether the chemical is considered to be a carcinogen by NTP, IARC, or OSHA; precautionary measures; emergency and first-aid procedures; and the identification of the organization responsible for preparing the sheet.

    • Compliance with the Law

      The Contractor and Contractor’s employees, agents, subconsultants and subcontractors shall comply with all applicable federal, state and local laws, rules, ordinances, regulations, orders, federal circulars and license and permit requirement in the performance of any Contract pursuant to this bid, including, without limitation and to the extent applicable, the Illinois Prevailing Wage Act, the federal Davis-Bacon Act, and the Employment of Illinois Workers on Public Works Act. The Contractor shall be in compliance with applicable tax requirements and shall be current in payment of such taxes.

    • Laws Governing

      This contract shall be governed by and construed according to the laws of the State of Illinois except that sections 2 through 8 of the Local Government Prompt Payment Act (50 ILCS 505/2-8) shall not be applicable. Venue for any action related to this agreement shall be in the Circuit Court for the 18th Judicial Circuit, DuPage County, Illinois.

    • Prevailing Wages

      If this contract calls for the construction of a “public work”, within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01et seq. (“the Act”), the Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the “prevailing rate of wages” (hourly cash wages plus fringe benefits) in the county where the work is performed. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor’s website at:

      https://www2.illinois.gov/idol/laws-rules/conmed/pages/prevailing-wage-rates.aspx.  All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage, notice and record keeping duties.

      Pursuant to PA 100-1177 and in accordance with 820 ILCS 130/5.1, Contractors shall submit to the Illinois Department of Labor (IDOL) all certified payroll records for prevailing wage work performed by contractor employees or subcontractors. IDOL is charged with developing and maintaining an online portal for prevailing wage construction contractors to file their certified payrolls. The portal may be accessed by visiting https://www2.illinois.gov/idol/Laws-Rules/CONMED/Pages/CertifiedTranscriptOfPayroll.aspx.

    • Non-Resident Executive and Technical Experts

      Every contractor on a public works project or improvement or hazardous waste clean-up and on-site disposal project in this State may place on such work no more than 3, or 6 in the case of a hazardous waste clean-up and on-site disposal project, of his regularly employed non-resident executive and technical experts, even though they do not qualify as Illinois laborers as defined in Section 1 of Article 2 of this Act.

    • Force Majeure

      Whenever a period of time is provided for in this Agreement for either the CITY or Contractor to do or perform any act or obligation, neither party shall be liable for any delays or inability to perform due to causes beyond the control of said party such as war, riot, strike or lockout by or against either party’s own employees or suppliers, unavoidable casualty or damage to personnel, materials or equipment, fire, flood, storm, earthquake, tornado or any act of God; provided, however, that said time period shall be extended for only the actual amount of time said party is so delayed. Except as to a strike or lockout by or against either party’s own employees or suppliers, an act or omission shall not be deemed to be “beyond Contractor’s control” if committed, omitted or caused by Contractor, Contractor’s employees, officers or agents or a subsidiary, affiliate or parent of Contractor or by any corporation or other business entity that holds a controlling interest in Contractor, whether held directly or indirectly.

    • Order of Precedence of Contract Documents

      The order of precedence of the component contract parts shall be as follows:

      1. Addenda if any.

      2. Project Specific Instructions to Bidders.

      3. Project Specific Supplementary Conditions to Project Specific General Conditions.

      4. Project Specific General Conditions.

      5. City of Naperville General Terms and Conditions and Instruction to Bidders.

      6. Special Conditions, Detailed Specifications and Special Provisions.

      7. Plans or City drawings.

      8. Standard Specifications of the City, State, or Federal Government.

      9. Performance Bond, if required.

      The foregoing order of precedence shall govern the interpretation of the contract in all cases of conflict or inconsistency therein, except as may be otherwise expressly provided by the City.

      In addition, in the case of a conflict between any term or provision contained in the contract documents which cannot be resolved by the order of precedence set forth above, the term or condition that is more stringent and/or specific shall govern and apply.

    • RIGHT TO AUDIT CLAUSE

      The following is the City's right to audit clause.

    • Retention and Examination of Information, Books and Records

      The Contractor shall cooperate with the City and provide the City, when requested, with access to data, information and documentation pertaining to the work. City requests for information may be based on requests from federal or state regulatory agencies, other governmental agencies, courts of law, consultants hired by the City or other parties, which in the City’s opinion, require the information.

      Data, information and documentation will include, but not be limited to, original estimate files, change order estimate files and detailed worksheets; subcontract and supplier proposals for both successful and unsuccessful bidders; all project related correspondence; subcontractor and supplier change order files (including detailed documentation covering negotiated settlements); back-charge logs and supporting documentation; any records detailing cash, trade, or volume discounts earned; insurance proceeds, rebates, or dividends received; and any other supporting evidence necessary to substantiate charges related to the contract (both direct and indirect costs, including overhead allocations as they may apply to costs associated with the contract).

      The Contractor will provide the City with copies of all requested records in a computer-readable format (if available) as well as hard copy.

      The Contractor shall retain and preserve all information relating to the work for a period of at least four (4) years from the date of the completion of the work.

      The City will have the right to audit any records necessary to permit evaluation and verification of contractor compliance with contract requirements throughout the term of the contract and for a period of four years after final payment, or longer if required by law.

      The City will have the right to interview any of the contractor’s current and former employees, as related to this contract, during the audit.

      The Contractor will provide the City with adequate and appropriate work space, with access to photocopy machines, during the audit.

      The Contractor will include in its subcontracts a provision granting the City the right of audit provisions against subcontractors as contained in this article.

    • Non-Appropriations Clause

      This contract is contingent on the receipt of funding in future years. The terms of this contract and any Purchase Order issued for multiple years under the Contract are contingent upon sufficient appropriations being approved by the City Council. Notwithstanding any language to the contrary in the solicitation, purchase order, or any other Contract document, the City may terminate its obligations if sufficient appropriations are not approved by the City Council. The City’s decision as to whether sufficient appropriations are available is final and binding on all parties.

    Submission Requirements

    • Bid Worksheet (required)
    • Reference 1 (required)

      Name of Client or Municipality:

      Address:

      Contact Person: 

      Title:

      Phone Number:

      Email Address:

      Size of the facility:

      Contract Dates:

      Contract Amount:

    • Reference 2: (required)

      Name of Client or Municipality:

      Address:

      Contact Person: 

      Title:

      Phone Number:

      Email Address:

      Size of the facility:

      Contract Dates:

      Contract Amount:

    • Reference 3 (required)

      Name of Client or Municipality:

      Address:

      Contact Person: 

      Title:

      Phone Number:

      Email Address:

      Size of the facility:

      Contract Dates:

      Contract Amount:

    • Affidavit of Compliance (required)

      Please download the below documents, complete, and upload.

    • Responsible Bidder Affidavit (required)

      Please download the below documents, complete, and upload.

    • Apprenticeship Certifications and/or Subcontractor Apprenticeship Certificates (required)
    • Bid Worksheet (required)

      Please download the below documents, complete, and upload.

    • Bid Bond (required)

      Please upload Bid Bond of 10%.

    • Does your entity plan to subcontract any work outlined within this solicitation? (required)
    • Please upload a completed Subcontractor form (required)

      Please download the below documents, complete, and upload.

    • Additional Information

      Please upload any additional information or documentation that you believe is relevant to this solicitation.

    • I certify that I have read, understood, and agree to the terms and conditions of this solicitation, and that I am authorized to submit this response on behalf of my entity. (required)
    • Will there be subcontractors? (required)
    • Scope of Work (required)
    • Bid Worksheet (required)

      Section preferred 

    • Is there a pre-bid meeting? (required)

    Key dates

    1. July 9, 2026Published
    2. August 4, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.