SLED Opportunity · RHODE ISLAND · RHODE ISLAND (CITY)

    Tuckpointing, Power Washing, and Sealant RFQ

    Issued by Rhode Island (city)
    cityRFPRhode Island (city)Sol. 1137
    Closed
    STATUS
    Closed
    due Jul 24, 2026
    PUBLISHED
    May 26, 2026
    Posting date
    JURISDICTION
    Rhode Island
    city
    NAICS CODE
    238140
    AI-classified industry

    AI Summary

    City of Rhode Island requests proposals for tuckpointing, power washing, and sealant application services on masonry surfaces. The work includes surface preparation, masonry inspection and repair, and application of salt-resistant sealant to protect historic brick and concrete structures.

    Opportunity details

    Solicitation No.
    1137
    Type / RFx
    RFP
    Status
    Open
    Level
    city
    Published Date
    May 26, 2026
    Due Date
    July 24, 2026
    NAICS Code
    238140AI guide
    Agency
    Rhode Island (city)

    Description

    Phase I: Surface Preparation & Power Washing ? Protection of Property: Before washing, the Contractor shall mask and protect all windows, doors, electrical conduits, HVAC units, light fixtures, signage, landscaping, and adjacent vehicles from water intrusion and chemical overspray. ? Cleaning Method: High-pressure power washing shall be used to remove all dirt, grime, atmospheric staining, mold, mildew, and efflorescence. ? Pressure/Temperature Control: Water pressure must be strictly regulated to prevent damage to historic or aging brick and concrete. Hot water/steam may be used if required to lift stubborn contaminants. ? Chemical Cleaners: If chemical cleaning agents or efflorescence removers are required, they must be biodegradable, non-acidic (unless approved for specific masonry types), and thoroughly rinsed away to leave no residue. Phase II: Masonry Inspection & Tuckpointing ? Inspection: The Contractor and a designated Rock Island Fire Department representative shall inspect the masonry to identify areas requiring mortar repair. ? Mortar Removal: Defective, cracked, loose, or weathered mortar joints shall be raked or ground out to a minimum depth of ½ inch, or until sound mortar is reached. Mechanical grinding wheels must not damage the surrounding brick edges. ? Joint Preparation: All debris and dust must be brushed or blown out of the joints before applying new mortar. ? Mortar Application: New mortar must be packed tightly into joints in layers. The mortar type must match the existing mortar in both compressive strength and color. ? Finishing: Joints shall be struck and tooled to match the original profile (e.g., concave, V joint) and brushed clean. Phase III: Salt-Resistant Sealant Application ? Material Specification: The sealant must be a premium-grade, deep-penetrating, breathable Silane, Siloxane, or Silane/Siloxane blend water repellent. It must be explicitly rated to resist chloride ion intrusion (road salts, deicers) and water penetration while allowing subsurface moisture vapor to escape. ? Application: Apply sealant strictly according to the manufacturer’s technical data sheet (flood-coat method via low-pressure sprayer followed by back-rolling, ensuring uniform coverage). ? Coverage: Ensure no overlapping streaks, runs, or puddles are left on the masonry surface. Please see full RFQ for additional details.

    Key dates

    1. May 26, 2026Published
    2. July 24, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.