Active SLED Opportunity · NEW MEXICO · CITY OF GALLUP

    Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation

    Issued by City of Gallup
    cityRFPCity of GallupSol. 287284
    Open · 27d remaining
    DAYS TO CLOSE
    27
    due Sep 1, 2026
    PUBLISHED
    Jul 24, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    237130
    AI-classified industry

    AI Summary

    City of Gallup seeks qualified EPC firms for turnkey delivery of a new 115 kV to 13.2 kV, 30 MVA electrical substation to improve system reliability and capacity in the Carbon Coal Road area. The project includes engineering, procurement, construction, commissioning, and project management.

    Opportunity details

    Solicitation No.
    287284
    Type / RFx
    RFP
    Status
    open
    Level
    city
    Published Date
    July 24, 2026
    Due Date
    September 1, 2026
    NAICS Code
    237130AI guide
    Jurisdiction
    City of Gallup
    Agency
    City of Gallup

    Description

    The City of Gallup is soliciting proposals from qualified Engineering, Procurement, and Construction (EPC) firms to provide turnkey delivery of a new 115 kV to 13.2 kV, 30 MVA electrical substation located in the Carbon Coal Road area. The selected contractor shall serve as the single point of responsibility for all phases of project delivery, including engineering and design, permitting and regulatory coordination, equipment procurement, site development, civil and electrical construction, installation, testing, commissioning, startup, project management, training, and project closeout necessary to deliver a fully operational substation.

    The project is a key capital improvement initiative intended to improve electric system reliability, increase system capacity, accommodate future load growth, and support continued economic development within the City of Gallup and the surrounding service area. The City seeks a highly qualified EPC contractor capable of providing a fully integrated, constructible, and schedule-driven solution while maintaining clear accountability for project quality, budget, schedule, safety, and successful project execution from initial design through final acceptance.

    Background

    The Carbon Coal Substation project is being undertaken to support significant existing and anticipated electrical demand within the recently annexed Carbon Coal area of the City of Gallup. Planned developments within the area include a new regional hospital, trade port development, and continued residential, commercial, and industrial expansion, all of which require additional electric infrastructure to provide safe, reliable, and adequate electrical service.

    Construction of the new substation is necessary to increase system capacity, improve reliability, maintain operational flexibility, and ensure the City's electric system can meet both near-term service demands and long-term load growth within this expanding service area. The project represents a major capital investment that will strengthen the City's electric distribution system while supporting economic development and critical public infrastructure.

    This project is consistent with the City's commitments under the 2024 Supplemental Annexation Agreement, which provides for the coordinated planning, construction, and long-term operation of utility infrastructure necessary to serve the annexed area. The Carbon Coal Substation is a key component of that infrastructure and is essential to supporting future development within the corridor.

    Given the size, complexity, and schedule requirements of this project, the City has elected to utilize a turnkey Engineering, Procurement, and Construction (EPC) delivery method. The selected contractor will serve as the single point of responsibility for all aspects of project delivery, providing complete accountability for engineering, procurement, construction, commissioning, and successful delivery of a fully operational substation. The City expects a collaborative approach that emphasizes quality, constructability, cost control, schedule adherence, safety, and effective project management throughout the duration of the project.

    Project Details

    • Reference ID: 2026/2027/03
    • Department: Electric Department
    • Department Head: Chuck Nourse (Electric Director)

    Important Dates

    • Questions Due: 2026-08-17T23:00:00.000Z
    • Answers Posted By: 2026-08-21T23:00:00.000Z

    Evaluation Criteria

    • Firm History and Experience (20 pts)

      Firm Background and Organizational Stability

      Provide a comprehensive description of your firm's history, including the number of years in operation, ownership structure, organizational structure, headquarters location, and overall financial stability. Explain how these factors demonstrate your firm's long-term stability, capacity, and ability to successfully deliver large-scale, capital-intensive electrical infrastructure projects.

      Describe your firm's experience serving as the single point of responsibility for Engineering, Procurement, and Construction (EPC) projects, including the management and coordination of engineering, procurement, subcontractors, construction, testing, commissioning, startup, and project closeout.

      • Relevant Turnkey Project Experience
        Demonstrate your firm's experience delivering turnkey electrical substation projects, particularly those involving 115 kV to 13.2 kV (or similar voltage class) systems. For each referenced project, provide the following information: 
        • Project name and location
        • Owner/client
        • Completion date
        • Voltage class and system configuration
        • Scope of services performed (engineering, procurement, construction, testing, commissioning, etc.)
        • Role of the firm (Prime Contractor, EPC Contractor, Joint Venture, or Subcontractor)
        • Total construction cost
        • Project duration
        • Brief description of the project and its primary technical challenges
      • Experience with Comparable Scope and Technical Complexity
        Demonstrate experience with projects involving work comparable in size, scope, and technical complexity, including: 
        • High-voltage (115 kV or greater) substation design and equipment specification
        • Power transformer, circuit breaker, and switchgear integration
        • Protection and control systems, including SCADA integration
        • Civil, structural, grading, drainage, and site development design
        • Testing, commissioning, startup, and energization of electrical substations
    • Capacity and Capability to Provide Services (20 pts)

      Organizational Capacity

      Demonstrate your firm's organizational capacity to successfully execute the Project, including:

      • Adequacy of staffing levels to support all phases of the Project, including engineering, design, procurement, construction, testing, commissioning, and project closeout.
      • Availability and continuity of key personnel throughout the Project duration.
      • Ability to manage multiple concurrent projects without adversely impacting performance or schedule.

      Technical Expertise and Resources

      Demonstrate your firm's technical expertise and available resources, including:

      • Experience designing high-voltage substations (115 kV and above) and medium-voltage distribution systems (13.2 kV or similar).
      • In-house capabilities across applicable disciplines, including electrical, civil, structural, protection and control, SCADA, communications, geotechnical, and construction engineering.
      • Access to specialized software, analytical tools, modeling programs, and technologies necessary to successfully design and deliver the Project.

      Project Management Capability

      Demonstrate your firm's project management approach, including:

      • Project scheduling and schedule management.
      • Cost control and budget management.
      • Quality Assurance and Quality Control (QA/QC).
      • Risk identification and mitigation.
      • Procurement planning and management of long-lead equipment.
      • Experience coordinating utilities, regulatory agencies, subcontractors, suppliers, and stakeholders.
      • Ability to successfully achieve project milestones and maintain the overall Project schedule.

      Construction and Field Support

      Demonstrate your firm's ability to provide construction management and field support, including:

      • Construction management and field engineering.
      • Construction inspection and quality oversight.
      • Installation, testing, startup, commissioning, and energization of substations.
      • Approach to identifying and resolving field issues while minimizing schedule impacts and construction delays.

      Subconsultant and Vendor Management

      Demonstrate your firm's ability to effectively manage subconsultants, suppliers, manufacturers, and contractors, including:

      • Coordination of multidisciplinary project teams.
      • Established relationships with manufacturers and suppliers of utility-grade electrical equipment.
      • Procurement and supply chain management capabilities.
      • Experience managing long-lead equipment procurement, manufacturing schedules, Factory Acceptance Testing (FAT), shipping, and delivery.

      Past Performance Demonstrating Capacity

      Demonstrate your firm's capacity through successful completion of projects comparable in size, scope, and complexity, including:

      • Delivery of projects on schedule.
      • Delivery of projects within budget.
      • Successful management of complex EPC or turnkey projects.
      • Ability to effectively manage project risks and minimize change orders.

      Current Workload and Availability

      Provide information regarding your firm's current and anticipated workload, including:

      • Current and projected workload during the proposed Project schedule.
      • Availability of key personnel and project resources.
      • Demonstrated ability to dedicate sufficient staff and resources to successfully complete this Project.
      • Commitment to maintaining continuity of key personnel and prioritizing this Project throughout its duration.
    • Past Record of Performance/References (20 pts)

      Performance on Past Projects

      Demonstrate your firm's record of successfully delivering projects comparable in size, scope, and complexity to the proposed Project. Include evidence of successful project execution, including:

      • Completion of projects on schedule.
      • Completion of projects within budget.
      • Effective management of project risks, change orders, and claims.
      • Quality of construction, engineering, and project documentation.
      • Successful testing, commissioning, and energization of completed facilities.

      Client References

      Provide references from utilities, municipalities, electric cooperatives, industrial clients, or other owners for comparable turnkey Engineering, Procurement, and Construction (EPC) substation projects completed within the past ten (10) years.

      References should include:

      • Project name and location.
      • Owner/Agency.
      • Primary client contact, title, telephone number, and email address.
      • Description of the work performed.
      • Overall project performance.
      • Responsiveness and communication.
      • Problem-solving and conflict resolution.
      • Ability to manage subcontractors, suppliers, and project stakeholders.
      • Overall client satisfaction.

      Regulatory and Standards Expertise

      Demonstrate experience applying applicable industry codes, standards, and regulatory requirements, including:

      • IEEE Standards.
      • National Electrical Code (NEC).
      • National Electrical Safety Code (NESC).
      • Applicable federal, state, and local permitting requirements.
      • Environmental permitting and regulatory compliance.
      • Utility interconnection requirements, where applicable.

      Safety Performance and Culture

      Demonstrate your firm's commitment to maintaining a safe work environment throughout all phases of project delivery. Provide information regarding:

      • OSHA Recordable Incident Rate (TRIR), if available.
      • Experience Modification Rate (EMR) for the most recent three (3) years.
      • Corporate safety program and safety management practices.
      • Safety training programs specific to high-voltage electrical construction.
      • History of safe project delivery and implementation of corrective actions following safety incidents, if applicable.

       

    • Qualifications of Key Personnel (30 pts)

      Relevant Experience

      Demonstrate the qualifications and relevant experience of the proposed key personnel assigned to the Project. For each individual, describe their experience in the design, engineering, construction, testing, commissioning, and project management of electrical substations comparable in size and voltage class (115 kV and above).

      Include experience involving:

      • Turnkey Engineering, Procurement, and Construction (EPC) substation projects.
      • Utility, municipal, cooperative, or industrial power systems.
      • Projects similar in scope, complexity, and construction value.

      Technical Expertise

      Demonstrate the technical qualifications of the proposed key personnel, including experience with:

      • High-voltage substation design and equipment specification.
      • Protection and control systems.
      • SCADA and communications integration.
      • Relay coordination and power system studies.
      • Grounding, lightning protection, and insulation coordination.
      • Applicable industry codes and standards, including IEEE, NEC, NESC, and other applicable utility standards.

      Roles and Responsibilities

      Clearly identify the proposed project team and define the responsibilities of each key individual, including, at a minimum:

      • Project Manager
      • Lead Electrical Engineer
      • Protection and Control Engineer
      • Civil/Structural Engineer
      • Construction Manager
      • Construction Superintendent

      Describe how the proposed staffing plan supports successful execution of the Project and how responsibilities will be coordinated throughout all phases of project delivery.

      Professional Credentials

      Provide the professional qualifications of each proposed key individual, including:

      • Professional Engineer (PE) licensure, where applicable.
      • Project Management Professional (PMP) certification, if applicable.
      • Specialized training or certifications related to substation engineering, construction, commissioning, safety, or project management.
      • Years of relevant professional experience.

      Project Management Capability

      Demonstrate the Project Manager's experience managing turnkey EPC electrical infrastructure projects, including:

      • Delivery of projects on schedule and within budget.
      • Management of multidisciplinary engineering and construction teams.
      • Coordination with utilities, regulatory agencies, equipment manufacturers, contractors, and project stakeholders.
      • Management of project risks, procurement activities, quality assurance, and overall project execution.

      Past Performance

      Provide documentation demonstrating the successful performance of the proposed key personnel on similar projects, including:

      • Comparable projects completed.
      • Individual responsibilities.
      • Project outcomes.
      • References, where applicable.
      • History of delivering quality work while minimizing delays, claims, and change orders.

      Availability and Commitment

      Provide a commitment regarding the availability of the proposed key personnel throughout the Project. Include:

      • Availability for the anticipated Project schedule.
      • Commitment to maintaining continuity of key personnel throughout the Project lifecycle.
      • Procedures for replacing key personnel should such replacement become necessary, including notification to and approval by the City.
    • Cost (10 pts)

      Cost proposals will be evaluated for completeness, competitiveness, reasonableness, and overall value to the City. Pricing should include all labor, materials, equipment, engineering, procurement, construction, testing, commissioning, project management, and other services necessary to deliver a complete, turn-key fully operational facility.

    • Preference (10 pts)

      Local/NM Resident/Veterans/ Native American Preference. Up to 10 points allowed if criteria met.

    Submission Requirements

    • Warranty (required)

      Bidder agrees that: All labor, work and materials done by the Contractor shall be warranted for a period of one (1) year. 

    • Upload COMPLETE proposal (required)

      Include both TECHNICAL AND COST proposals 

    • Upload COST proposal only (required)

      Only upload COST proposal

      Technical proposal will be uploaded in a separate entry (question).

    • Upload TECHNICAL proposals only (required)

      Only upload TECHNICAL proposal 

      Cost proposal will be uploaded via a separate Vendor Question.

    • Acknowledgement (required)

      Proposer acknowledges having read and agreed to all Terms and Conditions contained in the RFP.

    • New Mexico Resident and Resident Veterans Preference Certification (required)

      Please Attach Applicable Copy of your Certificate with response:

      New Mexico Resident

      New Mexico Veteran Resident

      New Mexico Native American Resident

      New Mexico Native American Veteran Resident

      N/A

    • Offeror confirmation of City's Right to reject proposals (required)

      THE CITY RESERVES THE RIGHT TO REJECT ANY OR ALL PROPOSALS IN WHOLE OR IN PART, TO WAIVE INFORMALITIES OR TECHNICALITIES AT ITS   OPTION, AND TO ACCEPT THE PROPOSAL IT DEEMS TO BE IN THE BEST INTEREST OF THE CITY OF GALLUP.

    • References (required)

      The Offeror should provide a list of five (5) references of clients, preferably in the public sector, provided the same or similar type service. The reference list should include current clients for which similar services have been provided within the past three (3) years and provide a contact person, telephone number and email address. The City reserves the right to contact clients for reference checks.

    • Offeror confirmation of City's Right to contact references (required)

      The City reserves the right to contact any references whether listed or not; or make any investigation as deemed necessary

    • Mandatory Qualifications (required)

      Please confirm that you meet the following qualifications: 

      All lead firms responding to this request must meet the following minimum qualifications: 

      1. Where applicable Electrical engineering design services shall be performed under the direction and supervision of a licensed electrical engineer authorized by law to conduct a practice of engineering in the State of New Mexico.
      2. Lead Firm or Principals must have a minimum of 10 years of continuous experience in one or more of the following: distribution, substations, transmission & generation; and familiarity with power supply/system planning, low, medium and high voltage power system design, financial/rate analysis and development, system protection, and power requirement analysis.
      3. Working knowledge of State and Federal regulations as related to integrated resource planning, power generation and power transmission systems. 
    • Joint Proposal

      If you are submitting a joint proposal you are required to download the below documents, complete, and upload.

      If this is not a Joint Proposal please skip this question. 

      Please download the below documents, complete, and upload.

    • Letter of Transmittal (required)

      Please download the below documents, complete, and upload.

    • Bidders Qualification Statement (required)

      Please download the below documents, complete, and upload with response

    • Subcontractor Listing (required)

      Please download the below documents, complete, and upload with response

    • Bid Bond (required)

      Please download the below documents, complete, and upload with response

    • Performance Bond (required)

      Contractor acknowledges that this project will require a Performance Bond at the time of award. Sample document attached.

    • Payment Bond (required)

      Contractor acknowledges that this project will require a Payment Bond at the time of award. Sample document attached.

    • Conflict of Interest and Debarment/Suspension Certification (required)

      Do you have a conflict of interest or have been debarred/suspended as described below?:

      If you answer yes you will be required to answer a follow up question. 

      CONFLICT OF INTEREST

       As utilized herein, the term “Vendor” shall mean that entity submitting a proposal to City of Gallup in response to the above referenced bids/request for proposals. The authorized Person, Firm and/or Corporation states that to the best of his/her belief and knowledge: No employee or City Council member of the City of Gallup (or close relative), with the exception of the person(s) identified below, has a direct or indirect financial interest in the Vendor or in the proposed transaction. Vendor neither employs, nor is negotiating to employ, any City of Gallup employee, City Council member or close relative, with the exception of the person(s) identified below. Vendor did not participate, directly or indirectly, in the preparation of specifications upon which the quote or offer is made. If the Vendor is a New Mexico State Legislator or if a New Mexico State Legislator holds a controlling interest in Vendor, please identify the legislator: List below the name(s) of any City of Gallup employee, City Council member or close relative who now or within the preceding 12 months (1) works for the Vendor; (2) has an ownership interest in the Vendor (other than as an owner of less than 1% of Vendor’s stock, if Vendor is a publicly traded corporation); (3) is a partner, officer, director, trustee or consultant to the Vendor; (4) has received grant, travel, honoraria or other similar support from Vendor; or (5) has a right to receive royalties from the vendor.

      DEBARMENT/SUSPENSION STATUS The Vendor certifies that it is not suspended, debarred or ineligible from entering into contracts with the Federal Government, or any State agency or local public body, or in receipt of a notice or proposed debarment from any Federal or State agency or local public body. The vendor agrees to provide immediate notice to City of Gallup’s Purchasing Department in the event of being suspended, debarred or declared ineligible by any department or agency of the Federal government, or any agency of local public body of the State of New Mexico, or upon receipt of a notice of proposed debarment that is received after the submission of the quote or offer but prior to the award of the purchase order or contract.

      CERTIFICATION The undersigned hereby certifies that he/she has read the above CONFLICT OF INTEREST and DEBARMENT/SUSPENSION Status requirements and that he/she understands and will comply with these requirements. The undersigned further certifies that they have the authority to certify compliance for the vendor named and that the information contained in this document is true and accurate to the best of their knowledge.

    • Conflict of Interest and Debarment/Suspension follow up  (required)

      Please provide details of the conflict of interest and/or Debarment/Suspension here: 

    • Campaign Contribution Disclosure Form (required)

      The prospective contractor must disclose whether they, a family member or a representative of the prospective contractor has made a campaign contribution to an applicable public official of the City of Gallup or the State of New Mexico during the two years prior to the date on which the contractor submits a proposal or, in the case of a sole source or small purchase contract, the two years prior to the date the contractor signs the contract, if the aggregate total of contributions given by the prospective contractor, a family member or a representative of the prospective contractor to the public official exceeds two hundred and fifty dollars ($250) over the two year period.

      THIS FORM MUST BE FILED BY ANY PROSPECTIVE CONTRACTOR WHETHER OR NOT THEY, THEIR FAMILY MEMBER, OR THEIR REPRESENTATIVE HAS MADE ANY CONTRIBUTIONS SUBJECT TO DISCLOSURE.

      The following definitions apply:

      “Applicable public official” means a person elected to an office or a person appointed to complete a term of an elected office, which has the authority to award or influence the award of the contract for which the prospective contractor is submitting a competitive sealed proposal or who has the authority to negotiate a sole source or small purchase contract that may be awarded without submission of a sealed competitive proposal.

      “Campaign Contribution” means a gift, subscription, loan, advance or deposit of money or other thing of value, including the estimated value of an in-kind contribution, that is made to or received by an applicable public official or any person authorized to raise, collect or expend contributions on that official’s behalf for the purpose of electing the official to either statewide or local office. “Campaign Contribution” includes the payment of a debt incurred in an election campaign, but does not include the value of services provided without compensation or unreimbursed travel or other personal expenses of individuals who volunteer a portion or all of their time on behalf of a candidate or political committee, nor does it include the administrative or solicitation expenses of a political committee that are paid by an organization that sponsors the committee.

      “Contract” means any agreement for the procurement of items of tangible personal property, services, professional services, or construction.

      “Family member” means spouse, father, mother, child, father-in-law, mother-in-law, daughter-in-law or son-in-law.

      “Pendency of the procurement process” means the time period commencing with the public notice of the request for proposals and ending with the award of the contract or the cancellation of the request for proposals.

      “Person” means any corporation, partnership, individual, joint venture, association or any other private legal entity.

      “Prospective contractor” means a person who is subject to the competitive sealed proposal process set forth in the Procurement Code or is not required to submit a competitive sealed proposal because that person qualifies for a sole source or a small purchase contract.

      “Representative of a prospective contractor” means an officer or director of a 21 corporation, a member or manager of a limited liability corporation, a partner of a partnership or a trustee of a trust of the prospective contractor. 

    • Disclosure of Contributions (required)

      Please provide details

      Contribution Made By:   

                           

      Relation to Prospective Contractor:     

       

      Name of Applicable Public Official:   

       

      Date Contribution(s) Made:                 

       

      Amount(s) of Contribution(s)              

       

      Nature of Contribution(s)                     

       

      Purpose of Contribution(s)

       

      --OR—

      NO CONTRIBUTIONS IN THE AGGREGATE TOTAL OVER TWO HUNDRED FIFTY DOLLARS ($250) WERE MADE to an applicable public official by me, a family member or representative.

    • Exceptions to Specifications (required)

      Do you take exception to any of the specifications, or terms and conditions in this solicitation? If you answer YES you will be asked to answer a follow up question.

      EXCEPTIONS TO SPECIFICATIONS CITY OF GALLUP PURCHASING FORMAL BID NO. 2317 IN THE INTEREST OF FAIRNESS AND SOUND BUSINESS PRACTICE, IT IS MANDATORY THAT YOU STATE ANY EXCEPTIONS TAKEN BY YOU TO OUR SPECIFICATIONS. IF YOUR BID DOES NOT MEET ALL OF OUR SPECIFICATIONS, YOU MUST SO STATE ON THE SPACES PROVIDED BELOW. ATTACH ADDITIONAL PAGES AS NECESSARY.

    • Exceptions to Specifications follow up (required)

      Please detail the  exceptions to the specifications here: 

    • Federal Employer Identification Number (FEIN) (required)

      Enter Company FEIN here.

    • NM Contractors License Number & Classification (required)

      Enter Company NM Contractors License Number and Classification here.  Attach copy of license to Vendor Questionnaire: Question 24 

    • NM Department of Workforce Solutions Number (required)

      Enter Company NM Department of Workforce Solutions Number here. Attach copy of license to Vendor Questionnaire: Question 24

    • Contractor Project Attachments

      Please use this section to upload any and all project related documents i.e. Certificate of Insurance, NM CID Licenses, NM Workforce Solutions Certificate of Registration, City of Gallup Business License, NM Resident Contractor Certificate, etc. 

    • Project Summary or Description and Location of Work (required)

      Enter a brief one or two paragraph description or summary of the project, which shall include Project Location.  (Typically the first paragraph of the SOW could suffice) 

       

      EXAMPLE: This project consists of installing approximately 7,100 linear feet of 16-inch CL350 ductile iron waterline as shown on the contract drawings. Work will include installation of 30” O.D. 0.375” wall steel casing with internal locking 16” CL350 ductile iron pipe by jack and bore under US-491, tie-in connections to existing 16-inch ductile iron waterlines, the installation of a 2-inch water service, and will include installation of 16-inch gate valves, combination air release valves, removal and replacement of existing water lines may be required to meet minimum bury and separation at crossings. Fittings as required to meet horizontal and vertical deflections. Erosion control devices including gabions, wire enclosed rip-rap and soil reinforcement mat installation will be required. Installation of import fill and grading will be required. Traffic control will be required. Work will include trenching, backfilling, compaction, material hauling, and material testing. Rock excavation will be required. Advertisement and notification of water shut-off(s) of all affected customers 48 hours prior to shut-off is included in this project.

       This project is located North of Gallup, New Mexico within and adjacent to US-491 Right-of-Way between the intersections of US- 491 with 9th Street and North Chino Loop (County Road 7).

    • Project Engineer/Architect (required)
    • Address and Phone number (required)

      Location to pick up hard copy plans and specifications

    • Address and Phone Number (required)

      Location to pick up hard copy plans and specifications

    • Address and Phone Number (required)

      Location to pick up hard copy plans and specifications

    • Electronic Bids Only? (required)

      Will bids be accepted only through the eProcurement Portal?  (recommended)

    • Deposit Amount for Plans/Specs (required)

      Enter dollar amount ex: $250.00

    • Classified Legal Advertisement (required)

      Please enter date of advertisement. MM/DD/YYYY

      • At least one legal notice advertisement in local publication is required; additional advertisement notices are at the option of the department.
      • The time required for a solicitation is a MINIMUM of thirty (30) consecutive calendar days, and can be longer depending on the complexity of the procurement.  Please plan your needs accordingly and allow ample time for processing.
      • The Procurement Code requires a MINIMUM of ten (10) days advertising time for solicitations.
    • Number of Calendar Days for Project Completion (required)

      Please enter the number of calendar days allowed for project completion (in written and numerical form) Your answer will populate the bold letters in the example below

       

      EXAMPLE: The Bidder must agree to commence work on a date to be specified in a written “Notice to Proceed” issued by the Engineer and to fully complete the project within one hundred and eighty (180) calendar days thereafter, including weather delays. 

    • Liquidated Damages Amount (required)

      Dollar amount per consecutive day project not completed after project completion date.

    • Subcontractor Threshold (required)

      Shall be five thousand dollars ($5,000) or one-half of one percent of the architect's or engineer's estimate of the total project cost, including alternatives, whichever is greater.

    • General Conditions (required)

      Is this project subject to Gallup's General Conditions 

    • Special Conditions (required)

      Are Special Conditions required for this project?

    • Lines, Grades and Construction Staking (required)
    • Line, Grade, and Construction Staking Specs (required)

      Example:

      All lines and grades for preliminary layout of the work will be established by the Owner’s representative (Engineer), but the Contractor shall provide such material and give such assistance as may be required. After the preliminary layout of the work has been accomplished, the Contractor shall, at their own expense, furnish all labor, materials and supplies for detail, layout and location of work and shall be responsible for constructing the work to the established lines and grades. The Contractor shall give notice to the Owner for lines and grades at least two (2) working days prior to the time he/she plans to commence work. The Contractor shall be responsible for protecting and preserving established line and grade controls.

      The Engineer will provide the following construction staking:

      1.    Offsets for major structures with cuts and fills

      2.    Utility lines – centerline or offset stakes at approx. 50 ft., P.I.’s and appurtenances, control for grade stakes where grade is called for.
       
      Occasional stake replacement required when stakes are unavoidably lost due to construction will be replaced by the Engineer, provided however, that the cost of stake replacement due to carelessness or inattentive construction around survey control will be deducted from Payment to the Contractor.

      Random bench marks will be established for use by the Contractor.  The Contractor will be responsible for bluetop staking for subgrade and base course.  Detailed measurements and elevations for structures and pipelines shall be the responsibility of the Contractor with occasional checks by the Engineer.
          
      Blue Top construction staking requirements by the Contractor shall be considered incidental to the project.

    • Payment of Stored Materials (required)
    • Payment of Stored Materials Allowed (required)

      (Value entered by default)

    • Payment of Stored Materials NOT ALLOWED (required)

      (Value entered by default)

    • Mayor (required)

      Marc DePauli

    Key dates

    1. July 24, 2026Published
    2. September 1, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.