UConn Storrs campus seeks bids for a $15M project to install a new electrical feed connection to meet growing power demand, starting September 2026.
The project is anticipated to begin September 2026, with a total estimated value of approximately $15 million. The UConn Storrs campus continues to expand in accordance with its Master Plan, and the electrical demand is increasing to a point where both imported, and campus-based production of electrical power needs to be increased to meet forecasted demand. The new 38E connection to the Eversource 900 line will facilitate meeting the forecasted demand. Please copy and paste the following link into a web browser to access the project through Building Connected: https://app.buildingconnected.com/projects/69a086668e6f28de3ec7c42a/info
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.