SLED Opportunity · MASSACHUSETTS · MASSACHUSETTS
AI Summary
McGuirk Stadium Phase 1 improvements include handrails, ADA seating upgrades, LED videoboards, sound system replacement, and HVAC upgrades. Mandatory pre-bid meeting on March 11, 2026.
McGuirk Stadium improvements phase 1 include adding stair & aisle handrails to grandstands, ADA lower bowl seating upgrades, installing ribbon LED videoboards, replacing the sound system, and Press Box HVAC upgrades per specifications. Bid/contract docs @ www.biddocs.com. DCAMM certs & Update Statements required. Pre Bid Conference: Pre-bid meeting (Mandatory) 03/11/2026 @11 AM, McGuirk Stadium 300 Stadium Drive, Amherst. Park on the west side of the stadium and meet under the press box.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.