Active SLED Opportunity · COLORADO · DOUGLAS COUNTY ENGINEERING
AI Summary
Douglas County Engineering seeks sealed bids for traffic signal infrastructure construction at University Boulevard and Post Office. The project is a formal ITB with electronic bid submission due August 11, 2026. A pre-bid conference is recommended on July 29, 2026.
Separate sealed bids for University Boulevard and Post Office Proposed Traffic Signal Infrastructure, TF 2025-025 will be received by the Owner, Douglas County Government, Department of Public Works, Engineering Division, Phillip S. Miller Building, 100 Third Street, Suite 220, Castle Rock, CO 80104, until Tuesday, AUGUST 11, 2026, at 12:00 p.m. This project consists of... **Project Type**: ITB - Invitation to Bid (Formal) **Source ID**: PU.AG.USA.2489.C20018476 **Piggyback Contract**: No **Question Acceptance Deadline**: 08/04/2026 07:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Additional Bidding Instructions**: BID DOCUMENTS FOR CONSTRUCTION OF ... **Owner Organization**: Douglas County Public Works **Reference Number**: 0000430621 **Pricing**: Lump sum **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents to be Included: Bid Proposal, Project Bid Schedule, Bid Bond, Project Addenda, Statement of Bidder's Qualifications, Non-Collusion Affidavit of Prime Bidder, Proof of CDOT Prequalification | Yes | Yes | **Pre-Bidding Events**: Event: Prebid Conference | Date: 07/29/2026 12:00 PM EDT | Location: PHILLIP S. MILLER BUILDING, 100 THIRD SREET, 2ND FLOOR, CASTLE ROCK, CO 80104 **Questions and Answers**: | Question | Answer | |---|---| | Due to schedule and possible long-lead items, have the traffic signal poles been ordered and available once the contractor is selected? | Answered in Communication 2 | | What is the appoximate size and depth of the existing caisson that is being removed? | Answered in Communication 2 | | When the existing pole and traffic pole is removed, what is the city's plan for temporary traffic signal? | Answered in Communication 2 | | Are there going to be other contractors for other scopes of work working in the same area while this scope is ongoing? | Answered in Communication 2 | | Is the county requiring the contractor to have ECM/GESC manager for this project, and if so will this be paid for under the F/A Erosion Control? | Answered in Communication 2 | | If the county decides to use B2, the secondary location for the signal pole, will the contractor still have to remove the whole caisson at location B1 or will it be a 36" BG removal like the others? | Answered in Communication 2 | **Communications**: - Communication No.2: Q & A Document 1 — Q & A Document 1.pdf - Communication No.1: Pre-Bid Conference Attendees — Pre-Bid Conference Attendees .pdf
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.