Construction project for Upper Brushy Creek Dam 16 auxiliary spillway cutoff wall involving trench excavation and unreinforced concrete wall installation with specific strength and shrinkage requirements. Bid due July 30, 2026.
Project includes the excavation of a 36-inch, 15 feet deep trench that spans the length of the auxiliary spillway control section centerline (approximately 240 LF) and keys into the auxiliary spillway berms. The unreinforced concrete cutoff wall will be installed in a trenched excavation. The concrete will be of sufficient unconfined strength (4,000psi) and chemical admixtures will be required to be added to the concrete to reduce shrinkage. The top of the wall will be flush with the ground at elevation 730.3 feet. Topsoil placement on all areas affected by construction is required.
## Details **Bid/Project ID:** UBC16A **Type of Work:** Construction **Pre-Bid Notes:** No pre-proposal meeting will be held. **Bid Location:** 460 Texas Ave, Round Rock, TX, 78664 **Bid Notes:** See proposal instructions in the procurement documents. Note that the District Office is open Tuesdays through Thursdays from 8 AM to 5 PM (closed for lunch from 12 :00 - 1:00 PM). Office is closed on Mondays and Fridays. **Engineer/Publisher:** Upper Brushy Creek WCID **Engineer Address:** 460 Texas Ave, Round Rock, Texas, 78664 ## Additional Notes Reminder - The following items must be submitted in the Proposal Package (one hard copy, one USB): • Proposal Form • Bid Bond • Qualifications Statement • Non-Collusion Certification • Conflict of Interest Questionnaire • Certification of Proposal • Documentation showing Offeror’s authority and quantification to do business in the State of Texas or a written covenant to obtain such authority prior to award of the Contract. ## Notes Plans are included in the Volume 2 Contract Documents, as well as linked separately for clarity. Project includes the excavation of a 36-inch, 15 feet deep trench that spans the length of the auxiliary spillway control section centerline (approximately 240 LF) and keys into the auxiliary spillway berms. The unreinforced concrete cutoff wall will be installed in a trenched excavation. The concrete will be of sufficient unconfined strength (4,000psi) and chemical admixtures will be required to be added to the concrete to reduce shrinkage. The top of the wall will be flush with the ground at elevation 730.3 feet. Topsoil placement on all areas affected by construction is required.SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.