Active SLED Opportunity · NORTH DAKOTA · OFFICE OF THE ADJUTANT GENERAL - NORTH DAKOTA ARMY NATIONAL GUARD - DIRECTORATE OF INSTALLATIONS AND ENVIRONMENT
AI Summary
RFP for walk-in cooler and freezer replacement at Camp Gilbert C. Grafton, ND, including general and electrical construction with estimated costs up to $1M.
WALK-IN COOLER AND FREEZER REPLACEMENT Bldg. 6310 Camp Gilbert C. Grafton Devils Lake, North Dakota Project Number 2605 IFB 26-20 General Construction IFB 26-21 Electrical Construction IFB 26-22 Total Combined Construction Architect's Name: Shultz + Associates Architects Estimated Price Range (Magnitude of Construction): General Construction: Between $250,000 and $500,000. Electrical Construction: Between $25,000 and $100,000. Total Combined Construction: Between $500,000 and $1,000,000. The contractor may use the estimated price range as a tool for estimating bonding or business capacity. An "Estimated Price Range" should NOT be interpreted as an indicator of available funds or as a disclosure of the Government's confidential cost estimate.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.