Active SLED Opportunity · TEXAS · HCMUD NO. 400
AI Summary
Construction services for wastewater treatment plant improvements including lift stations, aeration basins, electrical systems, piping, and related infrastructure in Harris County, Texas.
Construction of the wastewater treatment plant improvements work at Wastewater Treatment Plant No. 1 including but not limited to: lift station, headworks, influent and effluent channels, aeration basins, scum pump station, RAS/WAS pump station, chlorine contact basins, sodium hypochlorite system, aerobic digesters, blowers, electrical control building, gates, valves, piping, fittings, protective coatings, electrical, lighting, controls, duct bank and pull boxes, hydro-mulch seeding, access road, temporary facilities (including bypass pumping), construction materials testing, SWPPP, and all else specified on the construction drawings and contract documents necessary to construct, tie-in and make for a complete and operational system.
## Details **Bid/Project ID:** 05269-0223-01 **Type of Work:** Wastewater treatment plant **Pre-Bid Location:** Online - See Notes For Call-In **Bid Location:** Quiddity - 1575 Sawdust Road, Suite 400, The Woodlands, Texas 77380 **Engineer/Publisher:** Quiddity Engineering LLC **Engineer Address:** 1575 Sawdust Road, Suite 400, The Woodlands, Texas, 77380SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.