SLED Opportunity · LOUISIANA · THE CITY OF HAMMOND
AI Summary
The City of Hammond, LA seeks contractors for water line upgrades including installation of PVC water mains, fire hydrants, valves, and related sitework. Contract term is 120 days with an estimated cost of $393,950.00. Bids due by March 19, 2026.
Locate/Tie-In New Water Lines to Existing Mains (6 EA), Installation/open cut 6" C-900 PVC Water Main (4,050 LF), Jack & Bore/Dir. Bore 6" PVC/PE (1,320 LF}, Installation of 6"x6" TS & Valve (5 EA), 3-Way Fire Hydrant Assembly (5 EA), 6" PVC (C - 900) Hydrant Lead (30 LF), New Water Service Assemblies (20 EA), ¾" - 1 ½" Water Service Tubing (2,500 LF), 2" - 4" Gate Valve & Box (2 EA), Cap Existing Water Main (3 EA), Haul-In/Grade Limestone (75 TN), Install/Maintain Traffic Control and Erosion Control, Miscellaneous Clearing and Sitework, and related work as called for on the drawing, indicated on the Bid Form, or reasonably implied. Contract Term: 120 calendar days; Construction Cost Estimate: $393,950.00
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.