City of Seattle seeks contractors for Water Main Rehab Package 6 - North, involving water main replacement, storm drainage improvements, pressure regulating station installation, and roadway restoration across multiple sites. Project supports equity through Priority Hire program. Estimated cost $5.8M.
Project Description: This Project consists of the following elements of Work: Abandon in-place existing watermains; install new ductile iron watermain pipe, including valving, fire hydrants, and other watermain appurtenances, ranging from 4 inch to 12 inch in diameter by open-trench method; install new 2 inch diameter copper water main pipe via trenchless moling; storm drainage improvements; assist SPU Water Operations with: cut, cap, blocking of existing watermains, temporary and permanent water main connections, and temporary and permanent water services connection transfers; installation of a pressure regulating station including discharge piping to a new air gap vault, and SCADA monitoring system at the NW 201st St site; and final surface restoration of roadway and landscaping, including ADA curb ramp improvements.
This Project is a Covered Project subject to the City of Seattle’s Community Workforce Agreement (CWA) and Priority Hire SMC 20.37. With the support of the mayor and City Council, the City of Seattle administers programs that support racial and economic equity through contracting. Priority Hire is one of these programs. Priority Hire provides people living in economically distressed communities, women, and people of color access to work on the city’s construction projects. It gives contractors access to these skilled workers.
Engineer's Estimate: $5,823,000.00
Project Location: This Project is located at 3 different sites in the City of Seattle and 2 different sites in the City of Shoreline: 1) NW 201st St & 18th Ave NW (Shoreline); 2) 24th Ave NW from NW 196th St to NW 197th St (Shoreline); 3) Woodlawn Ave N from N 63rd St to N 65th St and Meridian Ave N from N 62nd St to Woodlawn Ave N (Seattle); 4) 8th Ave NE from NE 55th St to NE 60th St (Seattle); and 5) Roosevelt Way NE & NE 55th St (Seattle).
| Event | Date | Location |
|---|---|---|
| Pre-Bid Virtual Meeting #2 (Bidders must attend at least one of the two mandatory pre-bid meetings) *(attendance required)* | 2026-07-16T17:00:00.000Z | Microsoft Teams meeting Join: https://teams.microsoft.com/meet/243601768083375?p=FJ0OxAlLyt2ZWVFs1h Meeting ID: 243 601 768 083 375 Passcode: JA6wJ9Hx ________________________________________ Need help? | System reference Dial in by phone +1 206-686-8357,,576329809# United States, Seattle Find a local number Phone conference ID: 576 329 809# Join on a video conferencing device Tenant key: seattle@m.webex.com Video ID: 119 554 498 7 |
| Pre-Bid Virtual Meeting #1 (Bidders must attend at least one of the two mandatory pre-bid meetings) *(attendance required)* | 2026-07-14T17:00:00.000Z | Microsoft Teams meeting Join: https://teams.microsoft.com/meet/247885648691491?p=uWHXG39jVOm0Cf0GVo Meeting ID: 247 885 648 691 491 Passcode: CJ6Xa2iW ________________________________________ Need help? | System reference Dial in by phone +1 206-686-8357,,286374204# United States, Seattle Find a local number Phone conference ID: 286 374 204# Join on a video conferencing device Tenant key: seattle@m.webex.com Video ID: 111 849 253 7 |
Project Description: This Project consists of the following elements of Work: Abandon in-place existing watermains; install new ductile iron watermain pipe, including valving, fire hydrants, and other watermain appurtenances, ranging from 4 inch to 12 inch in diameter by open-trench method; install new 2 inch diameter copper water main pipe via trenchless moling; storm drainage improvements; assist SPU Water Operations with: cut, cap, blocking of existing watermains, temporary and permanent water main connections, and temporary and permanent water services connection transfers; installation of a pressure regulating station including discharge piping to a new air gap vault, and SCADA monitoring system at the NW 201st St site; and final surface restoration of roadway and landscaping, including ADA curb ramp improvements.
This Project is a Covered Project subject to the City of Seattle’s Community Workforce Agreement (CWA) and Priority Hire SMC 20.37. With the support of the mayor and City Council, the City of Seattle administers programs that support racial and economic equity through contracting. Priority Hire is one of these programs. Priority Hire provides people living in economically distressed communities, women, and people of color access to work on the city’s construction projects. It gives contractors access to these skilled workers.
Engineer's Estimate: $5,823,000.00
Project Location: This Project is located at 3 different sites in the City of Seattle and 2 different sites in the City of Shoreline: 1) NW 201st St & 18th Ave NW (Shoreline); 2) 24th Ave NW from NW 196th St to NW 197th St (Shoreline); 3) Woodlawn Ave N from N 63rd St to N 65th St and Meridian Ave N from N 62nd St to Woodlawn Ave N (Seattle); 4) 8th Ave NE from NE 55th St to NE 60th St (Seattle); and 5) Roosevelt Way NE & NE 55th St (Seattle).
The City of Seattle is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid.
| Release Project Date: | July 1, 2026 |
| Pre-Bid Virtual Meeting #1 (Bidders must attend at least one of the two mandatory pre-bid meetings) (Mandatory): | July 14, 2026, 10:00am Microsoft Teams meeting |
| Pre-Bid Virtual Meeting #2 (Bidders must attend at least one of the two mandatory pre-bid meetings) (Mandatory): | July 16, 2026, 10:00am Microsoft Teams meeting |
| Question Submission Deadline: | July 23, 2026, 5:00pm |
| Bid Open Date: | July 29, 2026, 2:00pm |
Please see the Attachments section for specifications and attachments.
Kai Fan
Senior Civil Engineer
700 5th Ave, Suite 4900
Seattle, WA 98124
Email: kai.fan@seattle.gov
Phone: (206) 684-5942
Gina Owens
Sr. Construction Contracts Specialist
700 5th Avenue, Suite 4350
Seattle, WA 98124
Email: gina.owens@seattle.gov
Phone: (206) 684-7251
Please upload your complete proposal response excluding pricing.
Please upload a PDF of the forms provided by the Owner that must be submitted with the Bid.
Please upload a SINGLE PDF.
Please upload an electronic scan of your Bid Bond or Cashier's Check.