SLED Opportunity · OKLAHOMA · THE CITY OF OKLAHOMA CITY AND TRUSTS
AI Summary
Request for Bid for waterline replacement at Tinker Air Force Base by Oklahoma City Water Utilities Trust. Mandatory pre-bid conference and recommended onsite visit scheduled. Electronic bid submission due by July 29, 2026.
Prequalification Requirement is Water Pipeline contractor "C" TW-0015, Waterline Replacement for Building 3001, Tinker Air Force Base **Project Type**: RFB - Request for Bid (Formal) **Source ID**: PU.MU.USA.2722754.C19106251 **Piggyback Contract**: No **Questions are submitted online**: Yes **Onsite Visit**: 07/20/2026 10:00 AM EDT **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: Oklahoma City Water Utilities Trust **Reference Number**: 0000427011 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Construction Business Relationship Affidavit | Attach Notarized Construction Business Relationship Affidavit | Yes | Yes | | Construction Anti Non-Collusion Affidavit | Attach Notarized Construction Anti-Collusion Affidavit | Yes | Yes | **Pre-Bidding Events**: Event: Prebid Conference | Date: 07/16/2026 04:00 PM EDT | Location: Utilities Department, 420 W Main, 5th Floor, Conference Room B, Oklahoma City, Oklahoma 73102 | Mandatory: True Event: Onsite Visit | Date: 07/20/2026 10:00 AM EDT | Location: Tinker Air Force Base Visitor Center, S Air Depot Blvd, Oklahoma City, OK 73145 **Line Items**: | description | uom | quantity | |---|---|---| | Next 1-Base Bid Code Description UOM Qty Modification 501 FITTINGS Pound 150 Quantity has been modified 511 8" GATE VALVE Each 1 Added 511 6" INSERTION ISOLATION VALVE Each 1 Added | 501 | | | 501 | FITTINGS | | | FITTINGS | Pound | 150.0 | | 8" GATE VALVE | Each | 1.0 | | 6" INSERTION ISOLATION VALVE | Each | 1.0 | **Questions and Answers**: | Question | Answer | |---|---| | Requirements Please confirm that Davis/Bacon wages and certified payroll will be required for this project? Arrow Right Answer: The answer(s) will be provided in an addendum. | Requirements Please confirm that Davis/Bacon wages and certified payroll will be required for this project? Arrow Right Answer: The answer(s) will be provided in an addendum. | | Material Requirements Will this project require AIS, BABA or other material certificates? Arrow Right Answer: The answer(s) will be provided in an addendum. | Material Requirements Will this project require AIS, BABA or other material certificates? Arrow Right Answer: The answer(s) will be provided in an addendum. | | Tax exemption Since the work will be on Federal Property, will this project be sales tax exempt? Arrow Right Answer: The answer(s) will be provided in an addendum. | Tax exemption Since the work will be on Federal Property, will this project be sales tax exempt? Arrow Right Answer: The answer(s) will be provided in an addendum. | | Temp Waterline Can the Temp Waterline be a 1" CTS Municipex Service Pipe? Looks like all it is supporting is the 1" Services going to 3113. Arrow Right Answer: The answer is provided in the addendum. | Temp Waterline Can the Temp Waterline be a 1" CTS Municipex Service Pipe? Looks like all it is supporting is the 1" Services going to 3113. Arrow Right Answer: The answer is provided in the addendum. | | Backfill Material Can ODOT TYPE A, which is OCWUT standard under paving back fill, or CLSM be considered in lieu of the "cement stabilized soil?" Arrow Right Answer: The answer will be provided in an addendum. | Backfill Material Can ODOT TYPE A, which is OCWUT standard under paving back fill, or CLSM be considered in lieu of the "cement stabilized soil?" Arrow Right Answer: The answer will be provided in an addendum. | | Fitting Quantity The quantity of fittings given on the Addendum 2 bid form is 150 pounds. According to the Tyler Union catalog the weight of a 8" MJ long sleeve is 90 LBS (1 showns on the plans), a 8" MJ 45 weighs 117 LBS (8 shown on the plans), and a 8" MJ cap (2 shown) is 46 LBS. Will the fitting pounds be a quantity measured for payment? Arrow Right Answer: The answer will be provided in an addendum. | Fitting Quantity The quantity of fittings given on the Addendum 2 bid form is 150 pounds. According to the Tyler Union catalog the weight of a 8" MJ long sleeve is 90 LBS (1 showns on the plans), a 8" MJ 45 weighs 117 LBS (8 shown on the plans), and a 8" MJ cap (2 shown) is 46 LBS. Will the fitting pounds be a quantity measured for payment? Arrow Right Answer: The answer will be provided in an addendum. | | Temporary Service to BLDG 3113 Are we to provide temporary services to Building 3113? Arrow Right Answer: The answer will be provided in an addendum. | Temporary Service to BLDG 3113 Are we to provide temporary services to Building 3113? Arrow Right Answer: The answer will be provided in an addendum. | | Quantity of Concrete Encasement Concrete encasement is called out in three locations on the plans with diminsions of 20' L x 3' W x 18" D which calculates to about 3.4 CY, but is shown to be 11 CY. The bid quantity is 33 CY. Are the diminsions of the concrete encasement correct or is the cubic yardage correct? Arrow Right Answer: The answer will be provided in an addendum. | Quantity of Concrete Encasement Concrete encasement is called out in three locations on the plans with diminsions of 20' L x 3' W x 18" D which calculates to about 3.4 CY, but is shown to be 11 CY. The bid quantity is 33 CY. Are the diminsions of the concrete encasement correct or is the cubic yardage correct? Arrow Right Answer: The answer will be provided in an addendum. | | Gate Valve and Insertion Valve Bid Items An 8" gate valve and 6" insertion valve shown on the Quantities on Sheet 3 and on the bid form, but they are not shown on the plan Sheet 4. Where are these items used? Arrow Right Answer: The answer will be provided in an addendum. | Gate Valve and Insertion Valve Bid Items An 8" gate valve and 6" insertion valve shown on the Quantities on Sheet 3 and on the bid form, but they are not shown on the plan Sheet 4. Where are these items used? Arrow Right Answer: The answer will be provided in an addendum. | | Cement Stabilized Backfill In place of the cement-stabilized backfill. Can we use flowable fill or Type A ODOT aggregate base Arrow Right Answer: The answer will be provided in an addendum. | Cement Stabilized Backfill In place of the cement-stabilized backfill. Can we use flowable fill or Type A ODOT aggregate base Arrow Right Answer: The answer will be provided in an addendum. | **Addendums**: | Addendum | Date | Note | |---|---|---| | Addendum No. 1 | 07/22/2026 01:46 PM EDT | | | Addendum No. 2 | 07/28/2026 02:37 PM EDT | | **Communications**: - Communication No.1 - 07/16/2026 05:47 PM EDT - Communication Documents - Document: TW-0015 Pre-bid Sign-in Sheet.pdf
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.