SLED Opportunity · SOUTH DAKOTA · CITY OF BOX ELDER
AI Summary
The City of Box Elder is accepting sealed bids for the West Sunnydale Road Reconstruction and Utilities Improvements until June 17, 2025. The project includes roadway reconstruction, drainage improvements, and sidewalk construction. An optional pre-bid meeting is scheduled for June 10, 2025. Bidders must adhere to Box Elder's construction specifications and complete the project by November 7, 2025.
The City of Box Elder will be accepting sealed bids for the West Sunnydale Road Reconstruction, Street and Utilities Improvements, until 2:00 p.m. local time, June 17, 2025, at the Box Elder City Hall, 420 Villa Drive, Box Elder, South Dakota, 57719. This project consists of the reconstruction of approximately 3,100 lf of gravel roadway with additional gravel, concrete curb & gutter in select locations, drainage improvement with 18” and 24” storm sewer piping, storm inlets, street paving, construction of an asphalt sidewalk along one side of the roadway and reseeding and erosion control measures. Bidders shall review the work areas to verify the quantities of work for the project. Project details, specifications, and bid documents may be obtained at the office of Towey Design Group, Inc., 147 Chisholm Dr., Box Elder, South Dakota, 57719. An optional pre-bid meeting will be held on June 10, 2025, at 1:30 p.m. local time via Box Elder City Hall, 420 Villa Drive, Box Elder, SD 57719. Email requests to join the Teams Meeting to: ashley.overeynder@boxelder.us Bidders must have access to a current set of Box Elder Standard Construction Specifications. All public improvements are required to conform to these specifications and bid prices must reflect these specifications. Bids may not be withdrawn prior to thirty (30) days after the bid opening. The Owner will award the bid within twenty-one (21) days after the bid opening. The Owner and Contractor hereby acknowledges that the time of completion of the work is of vital importance, and the Contractor will be required to complete the work within the time stipulated in the contract. Regardless of actual construction start date, all work associated with project shall be Substantially Complete by October 17, 2025, and completed ready for final inspection no later than November 7, 2025.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.