SLED Opportunity · COLORADO · CITY OF CASTLE PINES
AI Summary
Invitation to bid for the Westbound Castle Pines Parkway Reconstruction project in Colorado, involving water line and valve replacement, new water infrastructure, and roadway reconstruction with incentive clauses to reopen before school starts.
The project will replace existing water lines and valves at the intersection of Castle Pines Parkway and Monarch, then proceed West with all new water infrastructure and roadway reconstruction. The project has an incentive and disincentive clause to ensure portions of the roadway are reopened before school resumes in the fall. **Project Type**: ITB - Invitation to Bid (Formal) **Source ID**: PU.AG.USA.2169.C17005376 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/03/2026 05:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Additional Bidding Instructions**: This solicitation is identical to the previously posted one, except it now allows electronic bidding. **Owner Organization**: City of Castle Pines **Reference Number**: 0000417686 **Pricing**: In attached document **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | Yes | No | **Questions and Answers**: - Q1 Arrow Right Question: Night Work Is night work allowed at the intersection for Monarch Blvd and Castle Pines Parkway for installation of water line in phase 1? Answer: Answered in Addendum 1 04/02/2026 06:13 PM EDT 04/03/2026 12:12 PM EDT - Q2 Arrow Right Question: Night Work Will night work be allowed during phase 1 installation of water line at any point during construction and if so, what hours would be considered as a night working shift and would that be counted as a calendar day of work, if there is a day shift is working the same day? Answer: Answered in Addendum 1 04/02/2026 06:13 PM EDT 04/03/2026 12:12 PM EDT - Q3 Arrow Right Question: Rock Excavation If, there are any unknown soils like Rock Excavation during phase 1 water line installation - will contract days be added because of the time and potential delay to finishing the install in reference to the Incentive/disincentive for Phase 1. Answer: Answered in Addendum 1 04/02/2026 06:14 PM EDT 04/03/2026 12:12 PM EDT - Q4 Arrow Right Question: Rock Excavation If, there are any unknown soils like Rock Excavation during phase 1 water line installation - will contract days be added because of the time and potential delay to finishing the install in reference to the Incentive/disincentive for Phase Answer: Answered in Addendum 1 04/02/2026 06:14 PM EDT 04/03/2026 12:12 PM EDT - Q5 Arrow Right Question: Dewatering If dewatering is encountered during phase 1 - will contract days be added because of the time and potential delay to finishing the install in reference to the Incentive/disincentive for Phase 1. Answer: Answered in Addendum 1 04/02/2026 06:14 PM EDT 04/03/2026 12:12 PM EDT - Q6 Arrow Right Question: UTC Item UTC was not an item but seems to be required during intersection work during Phase 1, 2, and 3. Will a UTC be added as a contract item? Answer: Answered in Addendum 1 04/02/2026 06:15 PM EDT 04/03/2026 12:12 PM EDT - Q7 Arrow Right Question: Start date What is the anticipated start date? what is the project duration? Answer: Answered in Addendum 1 04/02/2026 06:25 PM EDT 04/03/2026 12:12 PM EDT - Q8 Arrow Right Question: Quality Control Does contractor need to provide QA ? Answer: Answered in Addendum 1 04/02/2026 06:26 PM EDT 04/03/2026 12:12 PM EDT - Q9 Arrow Right Question: Geotechnical Report Please provide geotechnical report. Answer: Answered in Addendum 1 04/02/2026 06:28 PM EDT 04/03/2026 12:12 PM EDT - Q10 Arrow Right Question: Sales Tax Question Please confirm that permanent materials are tax-exempt for this project, while construction materials will be subject to tax? Answer: Answered in Addendum 2 04/03/2026 02:17 PM EDT 04/06/2026 11:08 AM EDT - Q11 Arrow Right Question: Pipe Clarification The 8” HDPE pipe states its IPS DR9.3 – can you clarify if that’s DR9 IPS or is that something else? Answer: Answered in Addendum 2 04/03/2026 02:59 PM EDT 04/06/2026 11:08 AM EDT - Q12 Arrow Right Question: 14" Insertion Valve The construction plans identify that the 14” W-DIP shown on Sheets 66–69 is to be abandoned. Please confirm whether the Contract Item for the 14-inch insertion valve is still required given that the waterline will be abandoned Answer: Answered in Addendum 2 04/06/2026 10:42 AM EDT 04/06/2026 11:08 AM EDT
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.