SLED Opportunity · VIRGINIA · HENRICO COUNTY
AI Summary
Henrico County seeks contractors for installation of ductile iron water mains and hydrants on Williamsburg Road, including clearing, erosion control, and surface restoration.
The Work consists of installation of approximately 4,780 linear feet of 24-inch ductile iron water main, 140 linear feet of 12-inch ductile iron water main, 200 linear feet of 8-inch ductile iron water main, eleven (11) new hydrants, associated appurtenances, and all associated clearing and grubbing, erosion control, and surface restoration. Phase A Work consists of the installation of a portion of Alignment A water main, comprising the water main, mainline butterfly valves, and fire hydrants from Station A44+23 to A56+96, Alignment C water main, valves, and fire hydrant, and Alignment E water main and valves, including but not limited to all testing and restoration. The intent of Phase A is to provide water service to the Williamsburg Road Pump Station site. Phase B Work consists of all other Work not included in Phase A. Project is located at Williamsburg Road, Henrico, VA.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.